Bolthole Index

Haralson County, Georgia

Building permits, zoning and land rules in Bremen, Georgia

Bremen, Georgia has a city building department for building applications and residential inspections, plus its own residential zoning districts.12 Septic permits in the Haralson County portion of Bremen go through Haralson County Environmental Health, while the city’s septic-lot rules also recognize Carroll County Health Department jurisdiction.34 Confirm the parcel’s district and sewer availability before choosing a home design: zoning lot minimums and septic-specific minimums can both apply.56

At a glance

Building applications
City building department; conventional-home and commercial applications available1
Zoning
City residential districts have different lot minimums25
Septic permits
Applicable county health department; Haralson Environmental Health for the Haralson portion43
Septic lot size
New septic subdivisions: at least 1 acre per residence; annexed property for new individual-septic construction: at least 3 acres4
Guest house
Allowed with a single-family residence in the ER district7
Tiny homes
Local siting approval and applicable Georgia building codes required for site-built or modular tiny homes8
Manufactured-home utilities
Approved water and sewage disposal required before permanent occupancy9

Who to call

Building permits

City of Bremen Building Department

Building applications and residential and commercial building inspections inside Bremen

770-537-2331 ext. 232

[email protected]

232 Main Street | Bremen, GA 30110

Zoning

City of Bremen Planning and Zoning Department

City zoning questions and access to the published zoning map

(770) 537-2331

232 Main Street | Bremen, GA 30110

Septic permits

Haralson County Environmental Health Department

Septic and well permits for the Haralson County portion of Bremen

770-646-4301

133 Buchanan Bypass PO Box 40 Buchanan, GA 30113

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Bremen means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Bremen, GA, and who issues it?

Start with the City of Bremen Building Department for a building application inside Bremen: the city publishes conventional-home and commercial building applications and schedules residential and commercial building inspections.1 Email building applications to [email protected] or call 770-537-2331 ext. 232.1 For an addition or remodel, the city instructs applicants to complete the applicable portion of the conventional-home application.1

Georgia’s mandatory construction codes apply statewide, even where a local government does not enforce them.10 We could not confirm Bremen’s full list of work requiring a building permit or its building-permit fee schedule; ask the city building department about your house, shed, barn or renovation before work begins.

Does Bremen have zoning, and what are the lot-size rules?

Bremen’s residential lot minimum depends on the zoning district: ER single-family lots require at least 3 acres, while R-40, R-20, R-15 and R-12 require at least 40,000, 20,000, 15,000 and 12,000 square feet respectively.25 Separate septic-lot minimums may also apply, so meeting a district’s lot size alone does not settle whether a septic-served home will fit.54

Bremen allows a guest house in conjunction with a single-family residence in ER; that provision does not establish a citywide accessory-dwelling allowance.7 The residential district provisions refer additional yard, setback, dwelling-size and height requirements to the land development code’s general requirements.5 Take the parcel and proposed site plan to Bremen Planning and Zoning at city hall to resolve the district and applicable dimensions.11

How do septic permits work inside Bremen?

For a Bremen parcel in Haralson County, Haralson County Environmental Health handles onsite sewage management permits; call 770-646-4301.312 Bremen’s existing platted septic lots receive case-by-case review by the applicable Carroll or Haralson County Health Department.4 New septic-served subdivisions require at least 1 acre per single-family residence, and property annexed for new construction using an individual septic system must have at least 3 acres of platted area.4

Georgia requires the County Board of Health to find the site suitable before issuing a septic construction permit.13 The health department must conduct the final inspection and give written approval before the system is backfilled or used.14 Public or community sewer availability within 200 feet of the property line, or in an abutting public right-of-way, triggers the state sewer-connection rule.6

Can you live in an RV or tiny home on land in Bremen?

We could not confirm permission to use an RV as a permanent residence or temporary home while building in Bremen; ask Bremen Planning and Zoning about the proposed occupancy before buying an RV for the site. Bremen’s campground subdivision provisions do not establish permission to live in an RV on an ordinary residential parcel.15

Site-built and modular tiny homes need local siting approval and must meet applicable Georgia building codes; the statewide framework does not grant permission for an RV-based tiny home.8 We could not confirm a Bremen-specific tiny-home occupancy rule. A manufactured home in Bremen must connect to an approved water source and approved sewage disposal system before permanent occupancy.9 Georgia also requires a licensed installer to obtain the manufactured-home installation permit, with local zoning and siting requirements still applicable.16

Building a home in Bremen: what are the steps, in order?

  1. Ask Bremen Planning and Zoning to identify the parcel’s residential district and discuss the proposed use, lot dimensions and guest-house plans.1127
  2. Resolve sewer availability and, for a septic-served lot, obtain the applicable county health department’s site evaluation and septic construction approval.6134
  3. Obtain Bremen’s conventional-home application and ask the city building department for the required plans, building-permit fees and inspection schedule; applications may be emailed to the department.1
  4. Arrange city building inspections and the health department’s septic final inspection; septic systems need written approval before backfilling or use.114

We could not confirm the complete Bremen residential certificate-of-occupancy procedure; ask the city building department what final approvals are required before moving in.

What stays with Haralson County, and what should you check before buying in Bremen?

Haralson County Environmental Health lists both onsite sewage management and well permit programs, so the Haralson portion of Bremen still needs that office for those approvals.12 Georgia requires a water-well contractor to contact the local county health department for site review before drilling.17 For land outside Bremen city limits, use the Haralson County guide for the county’s building-permit and zoning answers.1819

Do not treat acreage as a septic suitability guarantee: the County Board of Health must find the site suitable.13 For access onto a state highway, residential driveway applications go to the appropriate GDOT District Area Office.20 We could not confirm Bremen’s floodplain-development requirements; ask the city planning department to identify the parcel’s floodplain status and the office responsible for floodplain approval.

Watch-outs

  • Bremen’s ER guest-house allowance applies to ER-zoned property, not every residential district.7
  • Bremen’s septic-lot rules distinguish existing platted lots, new subdivisions and land annexed for new individual-septic construction.4
  • We could not confirm Bremen owner-builder exemptions, building-permit fees or RV residential occupancy; request answers from the city building department and Planning and Zoning before committing to the project.111

Sources

  1. City of Bremen Building Department (bremenga.gov)
  2. Sec. 110-32. Estate Residential District (ER) (Bremen), quoted and re-checked
  3. Environmental Health Department (Bremen), quoted and re-checked
  4. Sec. 110-71. Minimum lot size for residential septic tank use (Bremen), quoted and re-checked
  5. Sec. 110-33. Single-Family Residential District (R-40) (Bremen), quoted and re-checked
  6. GA DPH Onsite Sewage Manual (Georgia statewide rule), quoted and re-checked
  7. Sec. 110-32. Estate Residential District (ER) (Bremen), quoted and re-checked
  8. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  9. Sec. 112-1. Manufactured homes and mobile homes (Bremen), quoted and re-checked
  10. Mandatory and Permissive State Codes (Georgia statewide rule), quoted and re-checked
  11. City of Bremen Planning and Zoning Department (bremenga.gov)
  12. Haralson County Environmental Health Department (haralsoncountyga.gov)
  13. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  14. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  15. library.municode.com (Bremen), quoted and re-checked
  16. Manufactured Housing (Georgia statewide rule), quoted and re-checked
  17. Water Well Standards (Georgia statewide rule), quoted and re-checked
  18. Permits and Licenses (2026 county census)
  19. Zoning and Permits (2026 county census)
  20. Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Bremen

Bremen’s own rules

  • Minimum dwelling sizeSpecified

    Townhouse dwelling units in Bremen's R-1 Low Density Residential District.

    • The cited numeric minimums apply to townhouse developments not part of a planned unit development.

    one-bedroom townhouse minimum: >= 850 square feet · two-bedroom, two-bath townhouse minimum: >= 1050 square feet · three-bedroom, 2½-bath townhouse minimum: >= 1200 square feet

    “Minimum dwelling unit size: 850 square feet for one bedroom unit; 1,050 square feet for two bedroom, two bath unit”
  • Minimum lot sizeSpecified

    Single-family residences in Bremen's R-40, R-20, R-15, and R-12 districts.

    • The cited sections refer additional yard, setback, dwelling-size, and height requirements to article III.
    • Separate septic-lot minimums may apply.

    R-40 minimum lot size: >= 40000 square feet · R-20 minimum lot size: >= 20000 square feet · R-15 minimum lot size: >= 15000 square feet · R-12 minimum lot size: >= 12000 square feet

    “Single-family residences with a minimum lot size of 40,000 square feet”
    One more reviewed finding on this topic
  • Accessory dwellingsLimited

    Guest-house accessory dwelling use in the ER Estate Residential District.

    • The guest house must be in conjunction with the single-family residence.
    • The cited provision applies specifically to ER-zoned property; no citywide accessory-dwelling rule was established.
    “A guest house facility as defined in this land development code is an allowable use in conjunction with the single-family residence.”
  • Mandatory utility hookupConditional

    Permanent occupancy of a manufactured-home site inside Bremen city limits.

    • Before permanent occupancy, the manufactured home must connect to an approved water source and approved sewage disposal system.
    • The requirement must comply with city requirements and applicable state health codes.
    • The reviewed provisions do not establish a universal public-water or public-sewer connection requirement for every home.
    “such a home shall be connected with an approved water source and an approved sewage disposal system”
  • Subdividing landRegulated (with conditions)

    Subdivisions and campground developments inside Bremen city limits.

    • Campgrounds are subject to city subdivision regulations unless separate standards apply.
    • New subdivisions served by septic are subject to the one-acre minimum residential lot rule.
    • Manufactured-home subdivisions require approval under the R-MH provisions.
    “All campgrounds [...] are subject to the regulations concerning subdivisions contained herein unless separate standards are otherwise specified.”

Rules another office applies inside Bremen

Bremen does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty

    The Haralson County portion of Bremen city limits.

    • The Haralson County Environmental Health Department is a section of the Georgia Department of Public Health.
    “The department is responsible for the following permit programs: [...] Land Use and On-Site Sewage Management Permits”
  • Septic permitRequired

    Individual septic systems and septic-served lots inside Bremen city limits, administered through the applicable Carroll or Haralson County Health Department.

    • For existing platted lots, the applicable county health department evaluates each permit request case by case.
    • New subdivisions served by septic require at least one acre per single-family residence.
    • Property annexed into the city for new construction served by an individual septic system must be at least three acres in platted size.
    • The lot-size restriction does not apply to residential development served by community sewer systems.

    minimum lot size for new subdivision septic residence: >= 1 acre (does not apply to residential development served by community sewer systems) · minimum platted size for property annexed for new individual septic construction: >= 3 acres

    “the Carroll or Haralson County Health Department will evaluate each individual request for a permit on a case-by-case basis”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Bremen or Haralson County directly.

  • Building permit — Building permit requirements for construction inside Bremen city limits.
  • Owner-builder exemption — Owner-builder exemptions from permitting or licensing inside Bremen city limits.
  • Inspections — Building inspections inside Bremen city limits.
  • Certificate of occupancy — Certificates of occupancy for buildings inside Bremen city limits.
  • Lot coverage — Lot coverage inside Bremen city limits.
5 more unanswered
  • Tiny homes
  • Off-grid sanitation
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Bremen publishes no rule on the point, not that none exists. Haralson County’s page lists the county offices to call.

← All of Haralson County: county rules, score and offices