College Park, Georgia has its own Building & Inspections Department and online permit process, but the city does not publish one blanket rule identifying every project that needs a building permit.1 College Park administers city zoning, while the Fulton County Board of Health permits and inspects onsite septic systems where public sewer is unavailable.234
At a glance
- Building permits
- Issued by College Park; ask the city whether your specific work requires one1
- Zoning
- Administered by College Park inside city limits2
- Septic
- County health construction permit and inspections required when an onsite system is used45
- RV living
- Long-term occupancy is unconfirmed; residential districts allow only limited parking of an unoccupied RV678
- Tiny homes
- Local siting approval and ordinary dwelling-code compliance apply; district-specific permission is unconfirmed9
- Owner-builder
- Georgia waives the state contractor license for an owner building their own home, but not local approvals10
Who to call
Building permits
College Park Building & Inspections
Building, electrical, HVAC, plumbing, commercial and residential roofing, and sign permits; electronic plan review and inspections
3667 Main Street, College Park, GA 30337
Zoning
College Park Planning & Zoning
Zoning applications, including rezoning, conditional use, conditional height, variances and zoning certificates
3667 Main Street, College Park, GA 30337
Septic permits
Fulton County Board of Health, Environmental Health Services
Permits and inspects onsite sewage management systems in Fulton County areas not served by public sanitary sewer
10 Park Place Health Center, 10 Park Place S.E., Atlanta, GA 30303
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in College Park means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in College Park, Georgia?
College Park's Building & Inspections Department runs electronic plan review, online permitting and mobile inspections through SagesGov.11 The city also publishes applications and fee documents, but the available city material does not establish a universal permit trigger or a complete list of exemptions for residential work.12 Ask College Park Building & Inspections whether the exact project needs a building permit before ordering plans or starting work.13 Construction in College Park must comply with Georgia's mandatory state minimum construction codes, and the updated codes and Georgia amendments became effective in 2026.14
Who issues building permits in College Park, GA?
College Park Building & Inspections is the city office for building, electrical, HVAC, plumbing, commercial and residential roofing, and sign permits.13 The department uses SagesGov for electronic plan review, online permitting, inspections, licensing and code enforcement.13 For a project that also needs zoning relief or a zoning certificate, College Park Planning & Zoning accepts rezoning, conditional-use, conditional-height, variance and zoning-certificate applications through its online system.15 Do not use Fulton County's unincorporated-area building office for a College Park parcel; the city's offices administer the municipal process.1
Does College Park have zoning, and what does it mean for a home?
College Park has its own zoning ordinance and residential zoning districts, so confirm both the city boundary and the parcel's district before judging a proposed use.2 In the R-1, R-2 and R-3 districts, primary and accessory structures plus impervious surface may cover no more than 35% of the lot.161718 Those same districts cap a primary structure at 35 feet and an accessory structure at 25 feet.192021 The available rules do not confirm current minimum lot size, dwelling size or setbacks for every residential district, so request a parcel-specific zoning determination from College Park Planning & Zoning.15
How do septic permits work inside College Park?
A College Park property using an onsite sewage management system needs a construction permit from the County Health Department before physical development or installation begins.22 The Fulton County Board of Health Environmental Health Services program is the local authority that permits and inspects onsite systems where public sanitary sewer is unavailable.34 A final County Board of Health inspection and written approval are required before the system is backfilled or used.23 Georgia also requires connection to public or community sewer when it is available within 200 feet of the property line or in an abutting public right-of-way.24 Contact the Board of Health before designing the house because a new onsite system requires county review and inspection.5
Can you live in an RV or tiny home in College Park?
College Park's R-1, R-2 and R-3 rules allow parking one owner-used travel trailer or motor coach only when it is unoccupied, screened from the street and parked on an approved impervious surface.678 Those parking provisions do not authorize living in the vehicle, and a general rule for long-term RV occupancy or private camping could not be confirmed; ask Planning & Zoning for a written parcel-specific answer.15 A site-built or modular tiny home is treated as a dwelling under Georgia building codes and also needs local siting approval under College Park zoning.9 College Park's district-specific tiny-home permission and minimum dwelling size could not be confirmed.9
Building a home in College Park: what are the steps?
- Confirm that the parcel is inside College Park and obtain its zoning district and allowed-use determination from Planning & Zoning.2
- Ask Building & Inspections which building and trade permits, plans and fees apply, then use the city's SagesGov workflow.13
- If public sewer is unavailable, secure the County Health Department's onsite sewage construction permit before physical development and arrange the required inspections.225
- Check flood status before finalizing elevations because residential work in the future-conditions floodplain has added construction limits and elevation standards.25
- Keep the work aligned with Georgia's mandatory construction codes and the city's adopted administration.26
What should you check before buying land in College Park?
Verify the city boundary and zoning district first, because College Park—not unincorporated Fulton County—controls municipal zoning.2 Ask Planning & Zoning about the proposed dwelling type, setbacks, minimum lot size and any conditional-use or variance path before closing.15 Confirm sewer availability with the utility provider and onsite-system feasibility with the Fulton County Board of Health; Georgia requires a sewer connection when service is available within 200 feet of the property line or in an abutting right-of-way.24 Fulton County ordinarily does not permit or inspect a sewer project whose connection point is inside College Park unless the city provides an exception letter, so confirm the correct utility reviewer before submitting plans.27 A private well must be installed by a licensed water-well contractor, who must notify the county health department before construction; ask the city whether a well is allowed on the parcel.28 Check the city's future-conditions floodplain standards because qualifying residential construction must meet special elevation requirements.25 If the driveway enters a state highway right-of-way, obtain the applicable state permit before construction there.29
Watch-outs
- A College Park mailing address does not by itself establish that the parcel is inside the city; confirm jurisdiction with Planning & Zoning before relying on city rules.15
- Parking permission for an unoccupied RV in a residential district is not permission to live in it.678
- New principal residential construction in the future-conditions floodplain is restricted and must meet the city's floodplain requirements.30
Sources
- Building & Inspections (College Park), quoted and re-checked
- College Park Code, Zoning Definitions (College Park), quoted and re-checked
- Land-use: Waste Management Septic Inspection, quoted and re-checked
- Land-use - Fulton County Board of Health, quoted and re-checked
- Land-use: Waste Management Septic Inspection, quoted and re-checked
- R-1 District Intent, Permitted Uses and Conditional Uses (College Park), quoted and re-checked
- R-2 District Intent, Permitted Uses and Conditional Uses (College Park), quoted and re-checked
- R-3 District Intent, Permitted Uses and Conditional Uses (College Park), quoted and re-checked
- Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
- Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
- Building & Inspections (College Park), quoted and re-checked
- Building & Inspections (College Park), quoted and re-checked
- College Park Building & Inspections (collegeparkga.gov)
- Building & Inspections (College Park), quoted and re-checked
- College Park Planning & Zoning (collegeparkga.gov)
- R-1 District Standards (College Park), quoted and re-checked
- R-2 District Standards (College Park), quoted and re-checked
- R-3 District Standards (College Park), quoted and re-checked
- R-1 District Standards (College Park), quoted and re-checked
- R-2 District Standards (College Park), quoted and re-checked
- R-3 District Standards (College Park), quoted and re-checked
- On-Site Sewage Management Systems Manual (College Park), quoted and re-checked
- On-Site Sewage Management Systems Manual (College Park), quoted and re-checked
- On-Site Sewage Management Systems Rules and Manual (College Park), quoted and re-checked
- College Park Code, Floodplain Building Standards (College Park), quoted and re-checked
- Chapter 5 Buildings, Construction and Related Matters (College Park), quoted and re-checked
- Public Works Permitting Process, quoted and re-checked
- Well Water, quoted and re-checked
- Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked
- Building standards for structures and buildings within the future-conditions floodplain (College Park), quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.