Building permits, zoning and septic rules in Eastman, Georgia

Eastman, Georgia administers building permits through a city application that says construction must wait for Council and/or Planning and Zoning approval.1 Eastman has its own zoning ordinance; septic permits remain with Dodge County Environmental Health.23 Ask the city to confirm the building permit requirement for your specific residential project.4

At a glance

Building permits
City application; construction must wait for Council and/or Planning and Zoning approval1
Zoning
Eastman has its own zoning ordinance2
Septic permits
Dodge County Environmental Health; site approval and construction permit required35
RV living
General occupancy unconfirmed; special flood hazard areas have separate RV conditions6
Tiny homes
Local siting approval and applicable Georgia building codes; Eastman-specific occupancy unconfirmed7
Manufactured homes
R-2A individual lots require Council location approval and specified housing standards8
Owner-builder
State contractor licensing exemption does not waive local approvals9

Who to call

Building permits

City of Eastman — building permit and zoning inquiries

City contact for building permit applications, zoning referrals and current fee documents

478-374-7721

Building permits

City of Eastman — Building Inspector/Code Enforcer

City building application, supporting documents and approval before construction

Zoning

City of Eastman Planning and Zoning Board

Municipal planning and zoning inquiries and board applications

478-374-7721

Septic permits

Dodge County Health Department — Environmental Health

Onsite sewage permits, site review and inspections for Eastman properties

(478) 374-5576

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Eastman means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Eastman, GA?

Eastman publishes a city building permit application, and the application expressly says construction must not begin until Council and/or Planning and Zoning approval.1 We could not confirm a complete residential building permit requirement covering every kind of project; ask the city building permit contact about your proposed home, addition or storage building.4

Georgia’s mandatory construction codes apply even where a local government does not enforce them.10 An owner building an owner-occupied home may qualify for Georgia’s contractor licensing exemption, but that exemption does not waive local building permits, inspections or zoning.9

Who handles building permits and zoning in Eastman?

Start with the City of Eastman contact at 478-374-7721 for the city building permit application and a referral for zoning questions.4 The city forms page provides a building permit application, a Planning and Zoning application, a zoning map and building fee documents.4

Eastman’s building application includes approval lines for the Building Inspector/Code Enforcer and City Council.1 Ask the city for the current project-specific fee, inspection schedule and occupancy approval requirements before setting a construction date.4 Septic review is a separate responsibility of Dodge County Environmental Health rather than the municipal zoning board.3

Does Eastman have zoning, lot sizes and setbacks?

Eastman has its own zoning ordinance, so the parcel’s city district matters when choosing a home design.2 In Eastman’s R-1 district, the minimum lot area is 15,000 square feet and minimum lot width is 100 feet; maximum lot coverage is 30%.1112

In Eastman’s R-3 district, a single-unit lot requires at least 7,500 square feet and 75 feet of width; the schedule changes with the number of units.13 R-3 setbacks are 30 feet at the front, 10 feet at the side and 30 feet at the rear, with maximum lot coverage of 35%.1415 Ask Eastman Planning and Zoning to identify the district before applying these dimensions to a purchase.16

How do septic permits work inside Eastman?

Dodge County Environmental Health handles local onsite sewage permit and inspection functions under Georgia rules, including Eastman properties using septic.3 Georgia requires a construction permit and a suitable site before installing an onsite sewage system; repairs, replacements and additions also require permits and inspections.5 The system cannot be backfilled or used until final inspection and written approval.17

Eastman’s building application requires an approved septic tank permit attachment if sewerage is unavailable.1 Georgia requires sewer connection when public or community sewage treatment is available within 200 feet of the property line or in an abutting public right-of-way.18 Eastman’s R-3 district separately requires each unit to connect to city water and city sewage disposal.19

Can you live in an RV or tiny home in Eastman?

We could not confirm a general Eastman rule allowing residential RV occupancy or temporary camping on a private lot; ask Eastman Planning and Zoning about the proposed use and district.16 In Eastman’s special flood hazard areas, an RV must either stay fewer than 180 consecutive days, be fully licensed and ready for highway use, or satisfy new-construction requirements including anchoring and elevation.6

Georgia requires local siting approval and applicable building codes for site-built or modular tiny dwellings.7 Eastman permits manufactured homes on individual R-2A lots only with Council location approval following a Planning and Zoning Board recommendation and compliance with listed housing standards.8 Those R-2A manufactured homes need at least 900 square feet excluding open porches, patios and garages, plus minimum dimensions of 20 feet wide and 40 feet long.20

Building a home in Eastman: what should you do first?

  1. Ask Eastman Planning and Zoning to confirm the parcel’s city district and the proposed dwelling use.16
  2. Resolve sewage disposal: if sewerage is unavailable, Eastman requires an approved septic tank permit with the building application.1
  3. Prepare the city application with a full set of plans, site plans if required, a deed copy and a plat copy.1
  4. Obtain the Council and/or Planning and Zoning approval identified by the city application before starting construction.1
  5. Arrange the required septic final inspection and written approval before backfilling or using an onsite system.17

For land outside Eastman city limits, consult the Dodge County guide for the county’s separate answers; Eastman’s zoning ordinance applies to land inside the city.2

Watch-outs

  • Eastman’s RV floodplain conditions do not establish general permission to live in an RV elsewhere in the city; ask Eastman Planning and Zoning about the address.616
  • A Georgia owner-builder contractor licensing exemption does not remove Eastman zoning or building approval obligations.9
  • Ask Dodge County Environmental Health whether a private well needs a local construction permit; Georgia requires the well contractor to contact the county health department before construction for site review.21

Sources

  1. City of Eastman — Building Inspector/Code Enforcer (eastmanga.gov)
  2. Eastman Zoning Ordinance Foreword (Eastman), quoted and re-checked
  3. Georgia Rule 511-3-1 On-Site Sewage Management Systems, quoted and re-checked
  4. City of Eastman — building permit and zoning inquiries (eastmanga.gov)
  5. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  6. Eastman Flood Hazard Reduction Standards, Section 18-77 (Eastman), quoted and re-checked
  7. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  8. Eastman Zoning Ordinance, Section 73, R-2A (Eastman), quoted and re-checked
  9. Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
  10. Mandatory and Permissive State Codes (Georgia statewide rule), quoted and re-checked
  11. Eastman Zoning Ordinance, Section 111, Schedule (Eastman), quoted and re-checked
  12. Eastman Zoning Ordinance, Section 111, Schedule (Eastman), quoted and re-checked
  13. Eastman Zoning Ordinance, Section 111A, R-3 schedule (Eastman), quoted and re-checked
  14. library.municode.com (Eastman), quoted and re-checked
  15. library.municode.com (Eastman), quoted and re-checked
  16. City of Eastman Planning and Zoning Board (eastmanga.gov)
  17. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  18. GA DPH Onsite Sewage Manual (Georgia statewide rule), quoted and re-checked
  19. library.municode.com (Eastman), quoted and re-checked
  20. library.municode.com (Eastman), quoted and re-checked
  21. Water Well Standards (Georgia statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Eastman

Eastman’s own rules

  • Building code adoptedAdopted (with conditions)

    New commercial construction in Eastman city.

    • The city's fee document states that new commercial construction is based on square footage according to the current State of Georgia adopted ICC code.
    • The document also references the International Building Code and Southern Building Code Congress International.
    “ALL NEW COMMERCIAL CONSTRUCTION IS BASED ON SQUARE FOOTAGE ACCORDING TO THE CURRENT STATE OF GEORGIA ADOPTED ICC CODE”
  • InspectionsLimited

    Construction requiring an inspection in Eastman city.

    • The fee schedule specifically addresses cases where an inspection is necessary but does not define all inspection triggers.

    inspection fee when valuation does not exceed $100: 10 USD (only if an inspection is necessary)

    “Where the valuation does not exceed $100.00, no fee shall be required unless an inspection is necessary, in which case there shall be a $10.00 fee.”
  • Local zoningPresent

    Land inside Eastman city limits; the City of Eastman has its own zoning ordinance.

    “Zoning is a governmental tool that is designed to promote the health, safety and general welfare of the people of Eastman, Georgia, through the regulation of land use.”
  • Zoning districtsPublished

    Zoning districts inside Eastman city limits.

    • The ordinance publishes districts including A-1, R-1, R-1A, R-1B, R-2, P, B-1, B-2, and I; R-2A and R-3 are addressed in separate sections.
    “A-1 None None None None None None One half acre R-1 15,000 15,000 100 25(1) 20% of Depth 7 with a total of 17 3½ stories or 35 feet 30% R-1A 10,000 10,000 75”
  • Minimum dwelling sizeSpecified

    Manufactured-home dwelling units in the R-2A district.

    • The minimum square footage is exclusive of open porches, patios and garages.

    minimum total square footage: >= 900 square feet (exclusive of open porches, patios and garages) · minimum width: >= 20 feet · minimum length: >= 40 feet

    “The structure shall be of such size so that each dwelling unit shall be a minimum of twenty (20) feet in width, a minimum of forty (40) feet in length, and with a minimum total square footage of 900 square feet exclusive of open porches, patios and garages.”
  • Minimum lot sizeDistrict specific (with conditions)

    R-3 high-density multiple-family residential district.

    • The R-3 schedule varies by unit count.

    minimum lot area for one unit: >= 7500 square feet · minimum area per family: >= 2625 square feet · minimum lot width: >= 75 feet · minimum area for two units: >= 9000 square feet · area per two-family unit: >= 4500 square feet · area per additional unit: >= 2500 square feet

    “R-3 1 Unit 7,500 2,625 75 30 30 10 30 35 35 % 2 Units 9,000 2 Families 4,500 90 30 30 10 30 35 35 % Each additional Unit: 2,500”
    2 more reviewed findings on this topic
    • District specific (with conditions) — R-1 single-family residential district.
      “R-1 15,000 15,000 100 25(1) 20% of Depth 7 with a total of 17 3½ stories or 35 feet 30%”
    • District specific (with conditions) — R-2 multiple-family residential district.
      “R-2 10,000 Less than 8 D.U. 4,000 More than 8 D.U. 2,500 75 25(1) 20% of Depth 7 with a total of 17 6 stories or 75 feet 30%”
  • SetbacksDistrict specific (with conditions)

    R-3 district.

    minimum front-yard setback on major streets: >= 30 feet · minimum front-yard setback on all other streets: >= 30 feet · minimum side yard: >= 10 feet · minimum rear yard: >= 30 feet

    “R-3 1 Unit 7,500 2,625 75 30 30 10 30 35 35 %”
  • Lot coverageSpecified

    R-1 district.

    maximum lot coverage: <= 30 percent

    “R-1 15,000 15,000 100 25(1) 20% of Depth 7 with a total of 17 3½ stories or 35 feet 30%”
    One more reviewed finding on this topic
    • Specified — R-3 district.
      “R-3 1 Unit 7,500 2,625 75 30 30 10 30 35 35 %”
  • Building heightSpecified

    R-1 district.

    maximum height: 3½ stories or 35 feet

    “R-1 15,000 15,000 100 25(1) 20% of Depth 7 with a total of 17 3½ stories or 35 feet 30%”
    One more reviewed finding on this topic
  • Living in an RVLimited

    Recreational vehicles placed in areas of special flood hazard inside Eastman city limits.

    • The RV must be on the site for fewer than 180 consecutive days; or be fully licensed and ready for highway use; or meet all requirements for new construction, including anchoring and elevation requirements.

    maximum consecutive days under one option: < 180 days (The alternative licensing/ready-for-highway-use or construction-compliance options remain available.)

    “All recreational vehicles placed on sites must either: 1. Be on the site for fewer than 180 consecutive days. 2. Be fully licensed and ready for highway use [...]; or 3. Meet all the requirements for new construction, including the anchoring and elevation requirements of subsection (3)a and c of this section.”
  • Manufactured homesAllowed (with conditions)

    Manufactured homes on individual lots in the R-2A district.

    • Location approval by City Council is required after recommendation by the Planning and Zoning Board.
    • The home must meet the listed housing standards, including minimum dimensions, permanent foundation, enclosure, porch, water, sewage, electrical, orientation, compatibility, and wheel/axle removal requirements.

    minimum total square footage: >= 900 square feet (exclusive of open porches, patios and garages) · minimum width: >= 20 feet · minimum length: >= 40 feet

    “Upon approval of location by City Council after recommendation by the Planning and Zoning Board, the following permitted uses are added: (A.) Manufactured homes on individual lots, subject to the housing standards and Requirements as set forth herein.”
    One more reviewed finding on this topic
    • Prohibited — Manufactured homes in the R-3 district.
      “Manufactured homes and Day Care Homes are not permitted.”
  • Mandatory utility hookupConditional

    Manufactured homes in the R-2A district.

    • The structure must have an approved water source and sewage disposal system as required by the City.
    “The structure shall be connected with an approved water source, sewage disposal system, and electrical service as required by the City.”
    One more reviewed finding on this topic
    • Water and sewer (with conditions) — Each unit in the R-3 high-density multiple-family residential district.
      “Each unit shall be connected to City water and City sewage disposal system.”
  • Permit feesPublished

    Building permits in the City of Eastman.

    • Fees are valuation-based.
    • A valuation not exceeding $100 has no fee unless inspection is necessary, in which case the fee is $10.
    • Swimming pools cost $75.
    • Signage is based on $5 per thousand.
    • New commercial construction is based on square footage under the current State of Georgia adopted ICC code.

    valuation over $100 through $15,000: 6 USD per thousand or fraction · valuation over $15,000 through $100,000: 90 USD (plus $4 for each additional thousand or fraction) · valuation over $100,000 through $500,000: 400 USD (plus $2 for each additional thousand or fraction) · valuation over $500,000 through $1,000,000: 1200 USD (plus $0.80 for each additional thousand or fraction) · valuation over $1,000,000: 1500 USD (plus $0.25 for each additional thousand) · swimming pool fee: 75 USD

    “For a valuation over $15,000.00 up to and including $100,000.00, the fee shall be $90.00 for the first fifteen thousand plus $4.00 for each additional thousand or fraction thereof.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Eastman or Dodge County directly.

  • Building permit — Building permits for construction inside Eastman city limits.
  • Owner-builder exemption — Owner-builder exemptions inside Eastman city limits.
  • Certificate of occupancy — Occupancy of buildings inside Eastman city limits.
  • Camping on your land — Temporary camping inside Eastman city limits.
  • Tiny homes — Tiny-home occupancy inside Eastman city limits.
7 more unanswered
  • Septic permit
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Eastman publishes no rule on the point, not that none exists. Dodge County’s page lists the county offices to call.

← All of Dodge County: county rules, score and offices