Bolthole Index

Colquitt County, Georgia

Building permits, zoning and septic rules in Doerun, Georgia

Doerun, Georgia requires a building-permit application to the city manager for a house, roofed structure or addition at least 5 days before work begins.1 Doerun has municipal zoning, although we could not confirm the current district map and standards.2 Sewer connections need city authorization; septic questions go to Colquitt County Environmental Health under Georgia’s onsite-sewage program.34

At a glance

Building permit
Apply to the city manager at least 5 days before work on a roofed building or addition1
Zoning
Municipal zoning reported; confirm current district standards with City Hall2
Sewer connection
Written authorization from the superintendent; city sewer tap fee applies35
Septic
County Board of Health site approval, construction permit and final inspection67
RV living
Temporary emergency housing while a primary dwelling is repaired; initial permit up to 6 months8
Tiny homes
Local siting approval and applicable building codes; Doerun occupancy rules unconfirmed9
Owner-builder
State contractor-license exemption does not waive city building requirements10

Who to call

Building permits

Doerun City Hall / City Manager

Contact the city manager for building-permit applications and City Hall for current zoning standards and utility coordination.

229.782.5444

223 West Broad Avenue

Septic permits

Colquitt County Environmental Health

County environmental-health contact for onsite sewage questions, site review and inspection arrangements.

(229) 589-8464

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Doerun means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Doerun, GA?

Doerun requires an application for a building permit before constructing a house, another roofed structure or an addition within city limits.1 Apply to the city manager at least 5 days before beginning work, identifying the owner, size, materials, location, whether the work is by contract or day’s work, and the contractor if applicable.1 Doerun enforces Georgia’s minimum standard construction codes as adopted and amended by the Georgia Department of Community Affairs.11 An owner building a personal home may qualify for Georgia’s contractor-license exemption, but that exemption does not remove local building permits, codes, inspections or zoning requirements.10

Who handles Doerun building permits and building inspections?

The Doerun city manager receives building-permit applications, inspects the proposed site and reports approval or disapproval to the city council.12 The site review considers encroachment on streets and alleys, danger to adjacent buildings and other necessary conditions.13 An applicant may appeal the city manager’s disapproval to council; if council approves, the city manager issues the building permit.12 Reach City Hall at 229.782.5444 or visit 223 West Broad Avenue to ask for the city manager.14 Ask that office for the current building-permit fee, construction inspection schedule and occupancy approval requirements before scheduling work.

Does Doerun have zoning, lot-size rules and setbacks?

Doerun is reported as having municipal zoning in Georgia’s 2018 municipal catalog, but we could not confirm the current district text or map.2 Ask Doerun City Hall for the parcel’s district, permitted residential uses, minimum lot and dwelling sizes, setbacks, lot coverage and height limits.14 Georgia leaves district boundaries and permitted uses to the applicable local ordinance, so a county district schedule cannot establish the standards for a city parcel.15 For land outside Doerun city limits, use the Colquitt County guide for the county building-permit answer.16

How do sewer connections and septic permits work in Doerun?

A Doerun public-sewer connection requires written authorization from the superintendent before anyone makes, uses, alters or disturbs the connection.3 The owner pays connection costs from the building to the municipal property line; the city makes the remaining connection and charges a tap fee set by council.3 Georgia requires sewer connection when a public or community sewage treatment system is available within 200 feet of the property line or in an abutting public right-of-way.17 For a proposed septic system, contact Colquitt County Environmental Health at (229) 589-8464.418 Georgia requires a County Board of Health suitability determination and construction permit, followed by final inspection and written approval before backfilling or use.67

Can you live in an RV or tiny home in Doerun?

Doerun allows the city or its designee to issue temporary RV, mobile-home, trailer or other temporary-dwelling permits during an emergency or disaster declared by the governor or mayor, while the primary dwelling is being repaired.8 The initial permit cannot exceed 6 months, and the dwelling must be removed when the permit or an extension expires.8 That emergency provision does not establish permission to live in an RV while building a new home.8 Ask City Hall about ordinary RV occupancy, temporary camping and permanent manufactured-home siting.14 Georgia requires local siting approval and applicable building-code compliance for site-built or modular tiny homes; Doerun’s specific tiny-home occupancy standards remain unconfirmed.9

Building a home in Doerun: what are the steps?

  1. Ask Doerun City Hall to confirm the city boundary, parcel zoning and whether the proposed home is an allowed use.142
  2. Resolve sewer availability and connection authorization with the city; if proposing septic, request site review from Colquitt County Environmental Health before relying on that option.346
  3. Submit the building-permit application to the city manager at least 5 days before work begins and allow for the city’s site review.12
  4. Ask the city manager for construction inspection and occupancy requirements, and arrange septic final approval before backfilling or using a new onsite system.147

For development proposals within Doerun’s special flood-hazard regulatory context, city standards require flood-safe siting, drainage and utilities designed to minimize flood damage.19

Watch-outs

  • Doerun’s temporary RV permit is tied to a declared emergency and repair of a primary dwelling, so do not treat it as authorization for ordinary RV living.8
  • Doerun’s sewer tap fee is set by council; ask City Hall for the current amount rather than budgeting from the county construction fee schedule.514
  • We could not confirm Doerun’s current setbacks, minimum lot size or minimum dwelling size; request the parcel’s district standards from City Hall before buying.214

Sources

  1. Code of Ordinances, Sec. 12-3. Building permits (Doerun), quoted and re-checked
  2. 2018 Municipal Government Information Catalog, Section 4.a (Doerun), quoted and re-checked
  3. Code of Ordinances, Sec. 44-90. Building sewers and connections (Doerun), quoted and re-checked
  4. Onsite Sewage, quoted and re-checked
  5. Code of Ordinances, Sec. 44-90. Building sewers and connections (Doerun), quoted and re-checked
  6. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  7. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  8. Code of Ordinances, Sec. 20-24. Authority to waive procedures and fee structures (Doerun), quoted and re-checked
  9. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  10. Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
  11. Code of Ordinances, Sec. 12-1. Codes adopted (Doerun), quoted and re-checked
  12. Code of Ordinances, Sec. 12-3. Building permits (Doerun), quoted and re-checked
  13. Code of Ordinances, Sec. 12-3. Building permits (Doerun), quoted and re-checked
  14. Doerun City Hall / City Manager (cityofdoerun.com)
  15. Governing Statutes, Regulations, and Guidance (Georgia statewide rule), quoted and re-checked
  16. Colquitt County Compliance, quoted and re-checked
  17. GA DPH Onsite Sewage Manual (Georgia statewide rule), quoted and re-checked
  18. Colquitt County Environmental Health (dph.georgia.gov)
  19. Code of Ordinances, Sec. 22-265. Standards for subdivisions and/or development proposals (Doerun), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Doerun

Doerun’s own rules

  • Building permitRequired

    A house, other roofed structure, or addition within Doerun city limits.

    • Application must be made to the city manager at least five days before beginning work.
    • The application must state owner, size, material, location, whether work is by contract or day's work, and contractor name if by contract.

    application lead time: >= 5 days (Before beginning work)

    “Any person or corporation intending to build or have built a house or other structure having a roof or to build an addition to a house or structure within the city shall make application to the city manager, at least five days before beginning work, for a permit to erect the building or structure.”
  • Building code adoptedAdopted (with conditions)

    Buildings within Doerun city limits.

    • The adopted codes are the listed Georgia State minimum standard codes and editions/amendments identified in Sec. 12-1.
    “The following Georgia State minimum standard codes, the latest editions as adopted and amended by the Georgia Department of Community Affairs, shall be enforced by the city:”
  • InspectionsRequired

    Proposed roofed buildings and additions within Doerun city limits.

    • The city manager's site inspection addresses encroachment on streets and alleys, danger to adjacent buildings or structures, and other necessary conditions and circumstances.
    • The cited section establishes a pre-permit site inspection; no separate construction-stage inspection schedule was located.
    “The city manager shall inspect the site of the proposed building or structure with reference to its encroachment on the streets and alleys, its danger to adjacent buildings or structures, and other conditions and circumstances as necessary; and shall report to the council his approval or disapproval of the permit;”
  • Local zoningPresent (with conditions)

    Land within Doerun city limits.

    • The official DCA municipal catalog reports this as 2018 data; the current district text and map were not located in the supplied Code of Ordinances sections.
    “Doerun City No Yes Other Council/chair RDC Yes No”
  • Living in an RVLimited

    Temporary recreational-vehicle dwellings in any zoning district within Doerun city limits during a declared emergency or disaster while the primary dwelling is being repaired.

    • A state of emergency or disaster must be declared by the governor or mayor.
    • The city or its designee may issue the temporary permit.
    • The permit may not exceed six months; upon expiration of the permit or an extension, the temporary dwelling must be removed.

    maximum temporary permit duration: <= 6 months (Emergency or disaster temporary dwelling permit)

    “Upon the declaration of a state of emergency or disaster by the governor or mayor, the city or its designees may issue temporary mobile home, trailer, recreational vehicle or other temporary dwelling structures or parks in any zoning district, even though not otherwise permitted by the development code, while the primary dwelling is being repaired.”
  • Mandatory utility hookupConditional

    A building connecting to Doerun's public sewer inside city limits.

    • A written permit from the superintendent is required before a person makes, uses, alters, or disturbs a public-sewer connection.
    • The owner bears connection costs from the building to the municipal property line.
    • The city makes the connection from the municipal property line into the public sewer, and the owner pays a sewer tap fee fixed by council from time to time.
    • The supplied section does not state that every new home must connect when water or sewer is available.

    sewer tap fee: fixed from time to time by the council (Connection from municipal property line into public sewer)

    “No unauthorized person shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or its appurtenances without first obtaining a written permit from the superintendent.”
  • Subdividing landRegulated (with conditions)

    Subdivision and development proposals within Doerun city limits that are in the special flood-hazard regulatory context of Chapter 22, Article VI.

    • Proposals must minimize flood damage and be reasonably safe from flooding.
    • Public utilities and facilities must be located and constructed to minimize flood damage.
    • Adequate drainage is required to reduce flood-hazard exposure.
    • For subdivisions or developments greater than 50 lots or five acres, whichever is less, base-flood-elevation data must be provided.

    subdivision/development threshold: greater than 50 lots or five acres, whichever is less (Base flood elevation data requirement)

    “All subdivision and/or development proposals shall be consistent with the need to minimize flood damage and shall be reasonably safe from flooding;”
  • Permit feesVariable (with conditions)

    Public-sewer building connection permits within Doerun city limits.

    • The owner must pay the city a sewer tap fee for the city's connection from the municipal property line into the public sewer.
    • The council fixes the amount from time to time.
    • This finding does not establish a published building-permit fee schedule.

    sewer tap fee: fixed from time to time by the council (Public-sewer connection made by city)

    “Any connection from the municipal property line into the public sewer shall be made by the city, for which the owner shall pay the city a sewer tap fee as fixed from time to time by the council.”
  • Permit processPublished (with conditions)

    Building-permit applications for roofed buildings and additions within Doerun city limits.

    • Application is made to the city manager at least five days before work starts.
    • The city manager inspects the site and reports approval or disapproval to council.
    • If the city manager disapproves, the applicant may appeal to council; if council approves, the city manager issues the permit.

    application lead time: >= 5 days (Before beginning work)

    “Any person or corporation intending to build or have built a house or other structure having a roof or to build an addition to a house or structure within the city shall make application to the city manager, at least five days before beginning work, for a permit to erect the building or structure.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Doerun or Colquitt County directly.

  • Owner-builder exemption — Owner-builders constructing within Doerun city limits.
  • Certificate of occupancy — Occupancy of buildings within Doerun city limits.
  • Minimum dwelling size — Residential zoning districts within Doerun city limits.
  • Minimum lot size — Residential zoning districts within Doerun city limits.
  • Setbacks — Residential zoning districts within Doerun city limits.
14 more unanswered
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Doerun publishes no rule on the point, not that none exists. Colquitt County’s page lists the county offices to call.