Perry is a city in Taylor County, Florida. 6 rules below are quoted from official sources and independently re-checked, most recently on October 16, 2026. Rules for unincorporated land are on the Taylor County page.

Answers from the rulebook for Perry

Perry’s own rules

  • Living in an RVLimited

    Recreational vehicles in Perry city flood hazard zones; general zoning rules for RV occupancy not located

    • RV must be on site fewer than 180 consecutive days, or be fully licensed and ready for highway use, or meet new-construction anchoring and elevation standards
    • Applies only to flood hazard zones; zoning ordinance not reviewed

    maximum consecutive days on site: < 180 days (unless highway-ready or meets new construction standards)

    “all recreational vehicles must either: (1) be on the site for fewer than 180 consecutive days; (2) be fully licensed and ready for highway use”
  • Manufactured homesLimited

    Manufactured homes in Perry city flood hazard areas; zoning-district rules not located

    • Must be anchored against flotation, collapse and lateral movement
    • Elevation requirements in Sec. 28-210 apply in zones A1-30, AH, AE
    “manufactured homes shall be anchored to prevent flotation, collapse, and lateral movement.”
  • Septic permitLimited

    Private sewage disposal systems inside Perry city

    • No permit for subsurface soil absorption systems where lot area is under 12,000 square feet
    • No discharge to any natural outlet

    minimum lot area for subsurface absorption septic: >= 12000 square feet

    “no permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than 12,000 square feet. no septic tank or cesspool shall be permitted to discharge to any natural outlet.”
  • Mandatory utility hookupConditional

    Properties served by private sewage disposal inside Perry city when public sewer becomes available

    • Availability determined as provided in section 50-122/50-124
    • Septic systems must be abandoned per state department of health
    • Water connection rule not located

    connection deadline after sewer available: <= 90 days

    “when a public sewer becomes available, the building sewer shall be connected to such sewer within 90 days and the private sewage disposal system shall be abandoned in accordance with state department of health.”
  • Building in a floodplainRequired

    New residential construction and substantial improvement in Perry city flood hazard areas

    • Lowest floor must be at least one foot above base flood elevation
    • Solid foundation perimeter walls need at least two openings on different sides of each enclosed area (see section 28-209)

    lowest floor above base flood elevation: >= 1 feet

    “All new construction and substantial improvement of any residential building (including manufactured home) shall have the lowest floor, including basement, elevated to no lower than one foot above the base flood elevation.”
  • Permit feesPublished

    Building permit fees inside Perry city

    • Fees: unheated single-family $0.18/sq ft; single-wide mobile home $300; double-wide $400; modular $300; all trades $80; remodel $0.20/sq ft; pool $100; re-roof $100; demolition $100; re-inspection $25

    single-family heated: per 0.24 USD per square foot

    “the building permit fees are as follows: single-family residence (heated) $0.24 per square foot”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Perry or Taylor County directly.

  • Building permit — Building permits inside Perry city
  • Owner-builder exemption — Owner-builder exemption inside Perry city
  • Building code adopted — Building code inside Perry city
  • Inspections — Building inspections inside Perry city
  • Certificate of occupancy — Certificates of occupancy inside Perry city
18 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Perry publishes no rule on the point, not that none exists. Taylor County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Perry means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Taylor County: county rules, score and offices