Bolthole Index

Pasco County, Florida

Building permits, zoning and septic rules in Port Richey, Florida

Port Richey, Florida requires building permits for new construction through city Development Services and has its own zoning rules.123 Inside this Pasco County city, septic permits and inspections stay with the Florida Department of Health in Pasco County.4 RV occupancy is limited, and minimum living area depends on the zoning district.567

At a glance

Building permits
City Development Services handles building applications21
Zoning
City Land Development Code and district rules apply3
Septic permits
Florida Department of Health in Pasco County48
RV occupancy
Cannot exceed 120 days unless authorized under section 109-4255
Minimum home size
1,000 square feet of living area in R-1 and A-167
Owner-builder
Conditional state exemption; building permits still apply9
Wells
Water management district or delegated authority issues well permits10

Who to call

Building permits

Port Richey Development Services

City building permit applications and zoning questions

727-835-1099

6333 Ridge Road Port Richey FL 34668

Building permits

Port Richey Development Services — Building FAQ

Building application requirements and completion process

Online permits →

Septic permits

Florida Department of Health in Pasco County

Septic permits and inspections inside Port Richey

727-841-4425

[email protected]

7509 State Road 52 Hudson, FL 34667

Floodplain permits

Port Richey Development Services — Flood Information & CRS

City elevation-certificate and flood-information resources

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Port Richey means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Port Richey, FL?

Port Richey, Florida requires building permits before new construction, additions, alterations and covered repairs begin; the city’s Development Services department is the building permit counter.12 The Florida Building Code applies inside Port Richey, and the code in effect when the application is submitted governs the permitted work through the permit and its extensions.11

For a Port Richey building application, submit detailed structural, electrical, plumbing and mechanical plans; separate permits may be needed for those systems.1 Ask Development Services which repair exemptions apply to your exact scope before scheduling work.2

Who handles building permits and zoning in Port Richey?

Port Richey Development Services lists a permitting line at 727-835-1099 and a Building Official/Code Enforcement line at 727-835-1100.2 Take city building permit and zoning questions to that department, while septic permit and inspection questions go to the Florida Department of Health in Pasco County.24

Port Richey’s building FAQ links an online application portal and describes the plans needed for a building application.1 Use the city’s zoning answer for a parcel inside city limits; for land outside Port Richey, consult the Pasco County guide for the county’s unincorporated-area zoning jurisdiction.312

Does Port Richey have zoning, lot-size rules and setbacks?

Port Richey has its own Land Development Code and zoning districts, and development proposals undergo the city’s development review process.3 In the R-1 Single-Family Residential district, the stated minimum lot is 6,000 square feet with 60 feet of width; lots created after adoption of the originating ordinance need 9,500 square feet and 80 feet of width.13 R-1 building coverage is limited to 40%, and building height to 32 feet.1415

In Port Richey’s A-1 Agricultural district, the minimum lot is 1 acre with 100 feet of width, and maximum building coverage is 10%.1617 Ask Development Services to identify the parcel’s district and applicable setback provisions before drawing the building footprint; the city directs setback questions to its adopted code.21

Can you live in an RV or tiny home in Port Richey?

Port Richey prohibits rental or occupancy of park trailers and recreational vehicles exceeding 120 days unless authorized under section 109-425; the rule also bars placing those units in a mobile home park or the RMH district.5 That occupancy limit does not establish permission to place an RV on every residential lot: ask Development Services about the proposed site and the authorization exception before using an RV as housing.52

Port Richey requires at least 1,000 square feet of living area in both the R-1 and A-1 districts, which constrains a small permanent dwelling in either district.67 We could not confirm a separate tiny-home or accessory-dwelling approval route; ask Development Services about the proposed design and district.2

How do septic permits work inside Port Richey?

Septic permits inside Port Richey come from the Florida Department of Health in Pasco County, which continues septic permitting and inspections under the state program.4 New septic installations, repairs, modifications and approvals of existing systems require a septic permit from that office.8 Call the environmental health office at 727-841-4425, option 3, before committing to a septic-dependent purchase or building design.18

Permanent occupied structures in Port Richey cannot rely on holding tanks or portable toilets for wastewater disposal, subject to the exception in Rule 62-6.0101.19 For an existing properly functioning septic system, Florida generally requires sewer connection within 365 days after written notification that sewer is available, excluding approved onsite graywater systems.20 Ask the health office to assess the existing system and applicable sewer-connection circumstances.18

Building a home in Port Richey: what are the steps?

Start by asking Port Richey Development Services to confirm the zoning district and whether the proposed home meets the district’s dimensional requirements.23 Then establish the wastewater plan with the Florida Department of Health in Pasco County if the property will use septic.8

Submit the city building application with structural and building-system plans, and ask which separate system permits apply.1 Florida’s owner-builder exemption can let an owner act as contractor for a residence for the owner’s use, with direct onsite supervision and personal signing of the application; the exemption does not remove building permits or code compliance.9 Port Richey’s FAQ says a new house or addition cannot be occupied or receive permanent power before a certificate of occupancy following completed inspections.1

What should you check before buying in Port Richey?

Ask Port Richey Development Services about flood requirements before pricing a new home or substantial improvement: the city collects an elevation certificate from builders and developers as part of its building permit requirements.21 A manufactured home installed or replaced in a Port Richey flood hazard area is subject to inspection by the building and zoning official and submission of lowest-floor elevation certification after placement.22

For a proposed well, Florida requires a permit from the appropriate water management district or delegated authority before construction, repair or abandonment; do not assume the city building permit covers a well.10 We could not confirm Port Richey’s current building fee schedule or parcel-specific driveway approval requirements; ask Development Services for both before setting the construction budget.2

Watch-outs

  • Port Richey’s RV occupancy limit includes an authorization exception; ask Development Services whether the proposed use qualifies before moving onto the lot.52
  • Port Richey’s minimum lot dimensions depend on district and, in R-1, when the lot was created.1316
  • We could not confirm the complete city inspection schedule or current fees; request the project-specific requirements from Development Services.2

Sources

  1. Port Richey Development Services — Building FAQ (cityofportrichey.gov)
  2. Port Richey Development Services (cityofportrichey.gov)
  3. Port Richey Land Development Code, Sec. 101-3 General findings (Port Richey), quoted and re-checked
  4. Onsite Sewage Treatment & Disposal Systems (Port Richey), quoted and re-checked
  5. Use of recreational vehicles (Port Richey), quoted and re-checked
  6. Single-Family Residential Zoning District (R-1), dimensional standards (Port Richey), quoted and re-checked
  7. Agricultural Zoning District (A-1), dimensional standards (Port Richey), quoted and re-checked
  8. Onsite Sewage Treatment & Disposal Systems (Port Richey), quoted and re-checked
  9. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  10. Water Well Contractor Licensing and Permitting (Florida statewide rule), quoted and re-checked
  11. Florida Building Code statewide adoption (Port Richey), quoted and re-checked
  12. Pasco County GIS zoning districts layer, quoted and re-checked
  13. Single-Family Residential Zoning District (R-1) (Port Richey), quoted and re-checked
  14. Single-Family Residential Zoning District (R-1), dimensional standards (Port Richey), quoted and re-checked
  15. Single-Family Residential Zoning District (R-1), dimensional standards (Port Richey), quoted and re-checked
  16. Agricultural Zoning District (A-1) (Port Richey), quoted and re-checked
  17. Agricultural Zoning District (A-1), dimensional standards (Port Richey), quoted and re-checked
  18. Florida Department of Health in Pasco County (pasco.floridahealth.gov)
  19. Onsite Sewage Treatment & Disposal Systems (Port Richey), quoted and re-checked
  20. leg.state.fl.us (Florida statewide rule), quoted and re-checked
  21. Port Richey Development Services — Flood Information & CRS (cityofportrichey.gov)
  22. Manufactured homes in flood hazard areas (Port Richey), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Port Richey

Port Richey’s own rules

  • Local zoningPresent

    Land inside Port Richey city limits; the city has its own Land Development Code and zoning districts.

    • All development proposals shall undergo the city's development review process.
    “F.S. ch. 163 requires each local government of the state to enact a unified land development code which implements and is consistent with the local comprehensive plan and which contains all land development regulations for the city.”
  • Living in an RVLimited

    Rental or occupancy of park trailers and recreational vehicles inside Port Richey city limits.

    • Section 109-425 provides an authorization exception.
    • The units may not be placed or sited in a mobile home park or RMH Zoning District.

    maximum occupancy period: <= 120 days (Unless authorized by section 109-425)

    “Unless authorized by section 109-425 , park trailers or recreational vehicles, including travel trailers, camping trailers, truck campers, and motor homes, shall not be used for rental or occupancy exceeding 120 days within the corporate limits of the city.”
  • Camping on your landProhibited

    Overnight camping in Oelsner's Park and Nick's Park inside Port Richey city limits.

    • The cited prohibitions apply specifically to the named city parks.
    “No person in the park shall set up tents, campers, trailers, or any other temporary shelter, for the purpose of overnight camping.”
  • Building in a floodplainLimited

    Manufactured homes installed or replaced in flood hazard areas inside Port Richey city limits.

    • The building and zoning official determines compliance with Chapter 109 and the issued permit.
    • Elevation certification for the lowest floor must be submitted after placement.
    “The building and zoning official shall inspect manufactured homes that are installed or replaced in flood hazard areas to determine compliance with the requirements of this chapter and the conditions of the issued permit. Upon placement of a manufactured home, certification of the elevation of the lowest floor shall be submitted to the building and zoning official.”

Rules another office applies inside Port Richey

Port Richey does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted

    Building construction inside Port Richey city limits under the Florida Building Code.

    • The state minimum code in effect when the permit application is submitted governs the permitted work for the life of the permit and extensions.
    “The initial adoption of, and any subsequent update or amendment to, the Florida Building Code by the commission is deemed adopted for use statewide without adoptions by local government.”
  • Minimum dwelling sizeSpecified

    Dwellings in Port Richey's A-1 Agricultural Zoning District.

    minimum living area: >= 1000 square feet

    “The minimum living area allowable in the A-1 district is 1,000 square feet.”
    One more reviewed finding on this topic
  • Minimum lot sizeSpecified

    Single-family residential lots in Port Richey's R-1 district.

    • For lots created after adoption of the originating ordinance, the minimum is 9,500 square feet and 80 feet wide.

    minimum lot size: >= 6000 square feet (Lots created after adoption: 9,500 square feet and 80-foot width) · minimum lot width: >= 60 feet (Lots created after adoption: 80 feet)

    “The minimum lot size required in the Single-Family Residential Zoning District is 6,000 square feet and a minimum lot width of 60 feet. For lots created after the adoption of the ordinance from which this chapter is derived, the minimum lot size is 9,500 square feet and a minimum width of 80 feet.”
    One more reviewed finding on this topic
    • Specified — Lots in Port Richey's A-1 Agricultural Zoning District.
      “The minimum lot size requirements in the A-1 district are one acre and a minimum lot width of 100 feet.”
  • Lot coverageSpecified

    Development in Port Richey's A-1 Agricultural Zoning District.

    maximum building coverage: <= 10 percent

    “The maximum building coverage allowable in the A-1 district is ten percent.”
    One more reviewed finding on this topic
  • Building heightSpecified

    Buildings in Port Richey's R-1 district.

    maximum building height: <= 32 feet

    “The maximum building height allowable in the Single-Family Residential Zoning District is 32 feet.”
  • Who permits septicCounty

    Septic permitting and inspection for systems inside Port Richey city limits.

    • The Florida Department of Environmental Protection implements the applicable statutes and regulations; the county health department continues permitting and inspection.
    “Under Florida’s Clean Waterways Act of 2020, the county health department offices will continue to do the permitting and inspection for septic tanks; please continue to work with them for all of your permitting-related needs.”
  • Septic permitRequired

    Proposed septic installations, repairs, modifications, and approvals of existing septic systems inside Port Richey city limits.

    • Operating permits apply only to aerobic treatment units, performance-based treatment systems, commercial septic systems, and industrial or manufacturing-zoned or equivalent septic systems.
    “All proposed new installations, repairs, modifications and approvals of existing systems require a permit from the The Florida Department of Health in Pasco County.”
  • Off-grid sanitationLimited

    Permanent structures intended for human occupancy, employment, public service, or congregation inside Port Richey city limits.

    • The rule contains an exception for Rule 62-6.0101, F.A.C.
    • Permanent structures may not rely on holding tanks and portable toilets for wastewater treatment and disposal.
    “Except for the provisions of Rule 62-6.0101, F.A.C., permanent structures shall not rely upon the use of holding tanks and portable toilets for wastewater treatment and disposal.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Port Richey or Pasco County directly.

  • Building permit — New residential construction and alterations inside Port Richey city limits.
  • Owner-builder exemption — Owner-builders performing construction inside Port Richey city limits.
  • Inspections — Building work inside Port Richey city limits.
  • Certificate of occupancy — Buildings inside Port Richey city limits.
  • Tiny homes — Tiny-home occupancy inside Port Richey city limits.
6 more unanswered
  • Accessory dwellings
  • Well permit
  • Mandatory utility hookup
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Port Richey publishes no rule on the point, not that none exists. Pasco County’s page lists the county offices to call.

← All of Pasco County: county rules, score and offices