Village of North Palm Beach, Florida requires issuance of a building permit before work that needs a building permit begins.1 The Village administers its own zoning, while septic permitting and inspections stay with the Florida Department of Health in Palm Beach County.23 Apply for Village building permits through the MGO Customer Portal.4
At a glance
- Building permits
- Village building permit must be issued before covered work begins1
- Zoning
- Village zoning code and map; requirements differ by district2
- Septic permits
- Florida Department of Health in Palm Beach County3
- Owner-builder
- In-person affidavit and notarized signatures; licensed contractors required for multifamily housing5
- Single-family lot size
- R-1: at least 7,500 square feet and 75 feet wide at the building line6
- Building height
- R-1: maximum 2 stories and 30 feet, with specified measurement rules and exclusions7
- Building permit fees
- Job-value based; surcharges, reviews and impact fees may affect the total8
Who to call
Building permits
Village of North Palm Beach Building Division
Village building permit applications, inspections, building records and flood-zone information
701 U.S. Highway 1 Suite 100 North Palm Beach, FL 33408
Zoning
Village of North Palm Beach Community Development Department
Village zoning questions and zoning confirmation letter requests
701 U.S. Highway, 1 Suite 100 North Palm Beach, FL 33408
Septic permits
Florida Department of Health in Palm Beach County - Environmental Public Health
Septic-system plan review and permitting, septic and well approvals, and private-well location review
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Village of North Palm Beach means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of North Palm Beach, FL?
For work requiring a building permit in Village of North Palm Beach, the permit must be issued before any work starts; beginning early carries penalties.1 Village building permit fees depend on the job’s contract value and fee schedule, with fire plan review, state surcharges, subcontractor count and impact fees potentially affecting the total.8 An owner-builder application requires an affidavit submitted in person and notarized signatures; multifamily work, including condominium work, requires licensed contractors.5
Who issues building permits in Village of North Palm Beach?
The Village of North Palm Beach Building Division is the contact for Village building permit applications and inspection questions.9 Village building permit applications must go through the MGO Customer Portal, and contractor registration must be completed before an application is submitted.4 Required plans, signatures, insurance, affidavits and other supporting documents accompany the application; inspections for MGO permits are scheduled through the portal.4 For an existing property, the Building Division links to Citizen Self-Serve for building permit and inspection history.9
Does Village of North Palm Beach have zoning and minimum lot sizes?
Village of North Palm Beach administers its own zoning code and map, with district regulations in Appendix C of the Village Code.2 In the R-1 single-family district, a lot or building site must contain at least 7,500 square feet and measure at least 75 feet wide at the building line.6 R-1 homes are limited to 2 stories and 30 feet, with height measured from average existing grade outside special flood hazard areas and required design flood elevation inside them.7 Ask Community Development for a zoning confirmation letter before sizing a proposed home to a particular parcel.10
How do septic permits work inside Village of North Palm Beach?
Septic permitting and inspection for property inside Village of North Palm Beach remain with the Florida Department of Health in Palm Beach County, rather than the Village building office.3 The health department reviews septic-system, private-well and limited-use-well plans, and those plans must be approved before a building permit can be issued.11 Well drillers submit location plans to the health department before drilling.11 Coordinate the sanitation and water design with that office early, because the health approval comes before the building permit in the published review sequence.11
Can you live in an RV or tiny home in Village of North Palm Beach?
Village of North Palm Beach prohibits lodging or camping on public property not authorized for that purpose and on private property without the owner’s permission.12 The private-property permission exception addresses unauthorized camping; it does not establish approval for residential RV use under the Village zoning code.12 We could not confirm residential RV, tiny-home or accessory-dwelling permission; ask Village Community Development about the proposed use and parcel.10 For R-2 multiple-family structures, a one-bedroom dwelling unit must have at least 750 square feet, plus 150 square feet for each additional bedroom; that provision is not a confirmed R-1 single-family minimum.13
Building a home in Village of North Palm Beach: what comes first?
- Ask Village Community Development to confirm the parcel’s zoning district and request a zoning confirmation letter before choosing a home layout.210
- Ask the Village Building Division for flood-zone information; an elevation certificate may be required for building permits in a Special Flood Hazard Area.9
- If proposing septic or a private well, obtain the health department’s plan approval before the building permit is issued.11
- Complete contractor registration and submit the building permit application and supporting documents through MGO, or satisfy the Village’s owner-builder requirements.45
- Wait for building permit issuance before starting work, then schedule MGO inspections through the portal.14
What should you check before buying in Village of North Palm Beach?
For a Village of North Palm Beach parcel, start with Village zoning and the Building Division’s flood-zone information rather than assuming county zoning governs the address.29 For land outside village limits, consult the Palm Beach County guide for the county’s unincorporated-area zoning framework.14 We could not confirm the Village’s public-water or sewer connection conditions, driveway-access rules or general certificate-of-occupancy requirements; ask Community Development which approvals apply to the proposed project.10 Where septic or wells are involved, the health department requires final approvals to be recorded before a certificate of occupancy is issued.11
Watch-outs
- Owner-builder status does not waive the Village building permit process, and multifamily housing work requires licensed contractors.51
- R-1 rooftops may not be used for pools, decks or congregation spaces.7
- An elevation certificate may be required for Village building permits within a Special Flood Hazard Area; ask the Building Division for a flood-zone determination.9
- The Village posts a July 2026 exemption process for certain small home improvement projects under $7,500; electrical, plumbing, structural, mechanical and gas work still require a building permit regardless of value.9 Ask the Building Division whether the exemption request applies to your project.9
Sources
- North Palm Beach FAQs (Village of North Palm Beach), quoted and re-checked
- village-npb.org (Village of North Palm Beach), quoted and re-checked
- Wastewater Systems (Village of North Palm Beach), quoted and re-checked
- Building Division (Village of North Palm Beach), quoted and re-checked
- Permit Application Submittal Requirements (Village of North Palm Beach), quoted and re-checked
- Sec. 45-27. R-1 single-family dwelling district (Village of North Palm Beach), quoted and re-checked
- Sec. 45-27. R-1 single-family dwelling district (Village of North Palm Beach), quoted and re-checked
- North Palm Beach FAQs (Village of North Palm Beach), quoted and re-checked
- Village of North Palm Beach Building Division (village-npb.org)
- Village of North Palm Beach Community Development Department (village-npb.org)
- Florida Department of Health in Palm Beach County - Environmental Public Health (palmbeach.floridahealth.gov)
- Sec. 19-11. Unauthorized lodging and camping (Village of North Palm Beach), quoted and re-checked
- Sec. 45-28. R-2 multiple-family dwelling district (Village of North Palm Beach), quoted and re-checked
- Planning, Zoning & Building - Zoning (2026 county census)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.