Okaloosa County, Florida

Building permits, zoning and septic rules in Crestview, Florida

Crestview, Florida requires building permits for a wide variety of construction, remodeling and repair work inside city limits.1 Crestview administers its own zoning in Okaloosa County, while Florida DEP handles septic-system permitting.23 RV occupancy is limited to a temporary-use permit in single-family dwelling district zoning, rather than open-ended residential use.4

At a glance

Building permits
Required for covered construction, remodeling and repairs; apply through city MGO15
Zoning
City zoning districts determine permissible uses2
Septic permits
Florida DEP handles septic permitting inside Crestview3
RV living
Temporary-use permit: 180 consecutive days in single-family dwelling district zoning4
Minimum house dimensions
Single-family dwellings in residential districts must be at least 20 feet long and 20 feet wide6
Owner-builder
Qualifying owners may act as their own contractor; city affidavit must be signed at the office7
Building permit fees
$55 base processing fee; other project and inspection charges may apply8

Who to call

Building permits

Crestview Building Permits & Inspections

City building-permit applications, plan review and inspections

(850) 682-1560

[email protected]

198 Wilson Street, North

Zoning

Crestview Planning & Zoning

City planning and zoning inquiries, development forms and mapping resources

(850) 682-1560 Option 2, then Option 4

[email protected]

198 Wilson St N

Septic permits

Florida Department of Environmental Protection — Onsite Sewage Program

Septic-system applications and site evaluation for Okaloosa County, including Crestview

[email protected]

2600 Blair Stone Road MS #3599 Tallahassee, FL 32399-2400

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Crestview means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Crestview, FL?

Crestview requires a building permit for a wide variety of construction, remodeling and repair work; ask the city Building Permits & Inspections division about the specific project before construction or demolition begins.1 Crestview uses the 2023 Florida Building Code and the 2020 National Electric Code.9

An owner-builder can qualify to act as the contractor for a residence for personal use, but must provide direct onsite supervision and meet the applicable legal obligations.10 The owner-builder exemption does not remove building-permit or code-compliance requirements, and Crestview lists an Owner Builder Affidavit that must be signed at the office.107

Who issues Crestview building permits, and how do you apply?

Crestview Building Permits & Inspections is the city contact for building-permit applications and inspection scheduling; use [email protected] for building-permit questions.11 Crestview building-permit applications must be submitted online through My Government Online, known as MGO.5 Applications requiring plan review need original PDF plans and required documents uploaded electronically, and review fees must be paid before review starts.5

Crestview lists a $55 building-permit base processing fee, with additional fees depending on the project and a possible $45 charge for each inspection not covered by permit fees.8 Crestview building permits are valid for 180 days, and each approved inspection extends validity by 180 days.5

Does Crestview have zoning, lot-size rules and setbacks?

Crestview has its own zoning districts and permissible-use standards, so ask Crestview Planning & Zoning to confirm the parcel district and proposed residential use.212 Minimum lot areas are 14,000 square feet in R-1E, 10,000 in R-1, 7,000 in R-2 and 5,000 in R-3; lots of record established on or before December 31, 2020 have a lot-area exemption.13141516

For R-1E and R-1, the listed front setback along the right-of-way is 30 feet, the side setback for a lot line intersecting the right-of-way is 10 feet, and the rear setback is 25 feet.17 The dimensional schedule also has an exemption for older lots of record; have city Planning & Zoning review the lot history and proposed footprint before relying on the standard setbacks.1712

How do septic permits work inside Crestview?

Florida DEP oversees septic-system permitting in Crestview and the rest of Okaloosa County, following the program transfer in 2025.3 A septic construction application requires the application form, site plan and building floor plan, together with a site evaluation assessing soil, topography and other installation conditions.18 DEP can conduct the evaluation, or an applicant can hire a qualified private evaluator; a private evaluation must be completed and uploaded before applying.18

Before committing to septic, establish whether city sewer triggers a connection requirement: Crestview requires a property using a septic tank or other sewage-disposal facility within 200 feet of city sewer to connect within 30 days of notice.19 City zoning approval and DEP septic approval therefore answer different questions, and sewer proximity can change the sanitation plan.2319

Can you live in an RV or tiny home in Crestview?

Crestview prohibits living or sleeping in an RV except through the temporary-use provision, which requires single-family dwelling district zoning and provides a permit for 180 consecutive days.4 An RV potable-water connection requires city building-inspection regulation and backflow protection; RV wastewater must be pumped by a state-licensed and bonded hauler or taken to a licensed receiving station, and sanitary-sewer connection is prohibited.4

Crestview requires single-family dwellings in residential districts to measure at least 20 feet in length and 20 feet in width, whether built onsite or moved onto the lot.6 We could not confirm a separate tiny-home or accessory-dwelling occupancy rule; ask Crestview Planning & Zoning about the proposed dwelling type and district before buying a unit.12

Building a home in Crestview: what are the steps in order?

  1. Confirm city limits, zoning district, residential use and the proposed footprint with Crestview Planning & Zoning; city district standards govern land inside Crestview.212
  2. Establish sewer availability and the applicable connection requirement, or prepare a DEP septic application with the site evaluation and house floor plan.1918
  3. Submit the city building-permit application and any required original PDF plans through MGO, then pay review fees before review starts.5
  4. Schedule required construction inspections through MGO or by email to the city Building division.2011
  5. Complete required inspections and pay all fees before Crestview issues the Certificate of Occupancy for a new building.21

What should you check before buying land in Crestview?

A Crestview mailing address is not a substitute for confirming which jurisdiction regulates the parcel: Crestview administers city zoning, while the county Land Development Code applies to unincorporated land outside city limits; use the Okaloosa County guide for that land.222 Septic permitting remains with Florida DEP inside Crestview.3

We could not confirm the private-well permitting authority or a general city driveway-access rule; ask Crestview Planning & Zoning to identify the appropriate reviewing office for the parcel before committing to a water or access plan.12 For a homestead project, Florida’s nonresidential farm-building exemption requires bona fide agricultural use, excludes urban agriculture, preserves floodplain requirements and does not cover a building intended as a residence.23

Watch-outs

  • Crestview’s temporary RV occupancy permission does not authorize permanent RV residential use.4
  • A small dwelling must still satisfy Crestview’s minimum single-family building dimensions and Florida Building Code requirements.6
  • Crestview sewer connection requirements can apply even to a property with an existing septic tank.19

Sources

  1. cityofcrestview.org (Crestview), quoted and re-checked
  2. Land Development Code, Sec. 4.06.00. Land uses permissible in each zoning district (Crestview), quoted and re-checked
  3. Onsite Sewage (Crestview), quoted and re-checked
  4. Code of Ordinances, Sec. 38-165. Outside storage of recreational vehicles (Crestview), quoted and re-checked
  5. Building Permits & Inspections (Crestview), quoted and re-checked
  6. Land Development Code, Sec. 6.01.00. Residential districts (Crestview), quoted and re-checked
  7. cityofcrestview.org (Crestview), quoted and re-checked
  8. Comprehensive Fee Schedule (Crestview), quoted and re-checked
  9. Building Permits & Inspections (Crestview), quoted and re-checked
  10. 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
  11. Crestview Building Permits & Inspections (cityofcrestview.org)
  12. Crestview Planning & Zoning (cityofcrestview.org)
  13. Land Development Code, Sec. 6.01.00. Residential districts (Crestview), quoted and re-checked
  14. Land Development Code, Sec. 6.01.00. Residential districts (Crestview), quoted and re-checked
  15. Land Development Code, Sec. 6.01.00. Residential districts (Crestview), quoted and re-checked
  16. Land Development Code, Sec. 6.01.00. Residential districts (Crestview), quoted and re-checked
  17. Land Development Code, Sec. 6.01.00. Residential districts (Crestview), quoted and re-checked
  18. Onsite Sewage FAQ — Permitting, quoted and re-checked
  19. library.municode.com (Crestview), quoted and re-checked
  20. Inspections (Crestview), quoted and re-checked
  21. cityofcrestview.org (Crestview), quoted and re-checked
  22. Land Development Code | Okaloosa County, quoted and re-checked
  23. Florida Statutes § 604.50, Nonresidential farm buildings; farm fences; farm signs (Florida statewide rule), quoted and re-checked

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Crestview

Crestview’s own rules

  • Building permitRequired

    Buildings and a wide variety of construction, remodeling, and repair work inside Crestview city limits.

    • The city advises verifying whether a particular project requires a permit before construction or demolition begins.
    • Work without a permit may result in a fine and professional-engineer approval, dismantling, demolition, or rework.
    “For buildings located in the City of Crestview, a permit is required for a wide variety of construction, remodeling and repair work.”
  • Owner-builder exemptionConditional

    Owner-builders undertaking qualifying residential work inside Crestview city limits.

    • The city lists an Owner Builder Affidavit and states it must be signed at the office.
    • The city’s demolition checklist identifies a residential exemption owner-builder form as required for owner-builders on one- and two-family dwellings.
    “If you own a building or structure, and it is not for sale or lease, 489.103(7), Florida Statutes, allows you to act as your own contractor.”
  • Building code adoptedAdopted

    Building work inside Crestview city limits.

    • The city page identifies the 2023 Florida Building Code, 8th Edition, and 2020 National Electric Code as current adopted codes.
    “The current adopted codes are the 2020 National Electric Code and the 2023 Florida Building Code (8th Edition), including Residential, Building, Existing Building, Energy Conservation, Accessibility, Fuel and Gas, Plumbing, and Mechanical.”
  • InspectionsRequired

    Permitted construction projects inside Crestview city limits.

    • Inspections include foundation, plumbing, electrical, gas, framing, final, and sewer inspections as applicable.
    • Inspections must be scheduled through the MGO customer portal or by email.
    “Periodic inspections are required on projects in order to verify compliance with the Florida Building Code and the City approved building plans.”
  • Certificate of occupancyRequired

    New buildings and buildings undergoing a change of occupancy classification inside Crestview city limits.

    • All fees must be paid and all required inspections completed.
    • Shell buildings receive a Certificate of Completion instead.
    • A Certificate of Completion may be obtained upon request for minor projects.
    “Once all fees are paid and all required inspections are completed, the Building Division will issue a Certificate of Occupancy for new buildings and buildings undergoing a change of occupancy classification, or a Certificate of Completion for shell buildings.”
  • Local zoningPresent

    Land inside Crestview city limits; Crestview adopts and administers its own Land Development Code and zoning districts.

    • Uses are subject to the applicable zoning-district standards and supplemental standards.
    “Table 4.06.00. Permissible Uses in Each Zoning District Principal Land Use Zoning District R-1E R-1 R-2 R-3 MU C-1 C-2 IN P E”
  • Minimum dwelling sizeSpecified

    Single-family dwellings in Crestview residential districts.

    • The minimum building dimensions apply to all single-family dwellings, whether site-built or built off site and moved onto the lot.
    • Florida Building Code Residential compliance is also required.

    minimum building length: >= 20 feet (single-family dwellings) · minimum building width: >= 20 feet (single-family dwellings)

    “The minimum length and width of the building shall be 20 feet.”
  • Living in an RVTemporary only (with conditions)

    Recreational-vehicle occupancy on private land inside Crestview city limits.

    • RVs may not be lived in, slept in, or used as a residence except under Sec. 38-166.
    • The parcel must be in the single-family dwelling district zoning.
    • A temporary-use permit is valid for 180 consecutive days.
    • Potable-water connections require city building-inspection regulation and backflow protection.
    • Wastewater must be pumped out by a state-licensed and bonded hauler or taken to a licensed receiving station; sanitary-sewer connection is prohibited.

    temporary permit duration: 180 consecutive days

    “Recreational vehicles shall not be lived in, slept in, or otherwise used as a residence or for residential or commercial purposes to include storage, except as provided in section 38-166.”
  • Off-grid sanitationLimited

    Private sewage disposal inside Crestview city limits.

    • Septic or other private sewage disposal is not available as an unrestricted alternative where city sewer is within 200 feet after notice.
    • Beyond 200 feet from city sewer, the code requires a sanitary septic tank for an outdoor privy.

    city sewer threshold: > 200 feet (the code requires septic beyond this distance for an outdoor privy)

    “Any person who shall have an outdoor privy in the city and whose property is beyond 200 feet from the city sewer shall within 30 days from notice construct a sanitary septic tank and connect thereto.”
  • Mandatory utility hookupConditional

    Sewer and water service for property inside Crestview city limits.

    • A person with a septic tank or other sewage-disposal facility must connect to city sewer within 30 days of notice if within 200 feet of the city sewer.
    • If an outdoor privy is beyond 200 feet from the city sewer, the owner must construct and connect to a sanitary septic tank within 30 days of notice.
    • City utility charges are waived where the particular service is not available at the service location.

    distance to city sewer: <= 200 feet (connection required within 30 days from notice) · connection deadline: 30 days (from notice)

    “Any person who has a privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage in the city shall connect to the city sewer in 30 days from notice, if within 200 feet of the city sewer.”
  • Permit feesPublished (with conditions)

    Crestview city building, planning, subdivision, utility, and related permit applications.

    • Fees vary by permit type and project characteristics.
    • The schedule is identified as amended June 22, 2026.
    • Building permits include a $55 base processing fee and may include a $45 inspection trip charge where permit fees do not cover required inspections.

    building permit processing fee: 55 USD (base fee) · inspection trip charge: 45 USD (each inspection not covered by permit fees)

    “Building Permit Processing Fee (Base Fee) $55.00 If the permit fee does not cover the costs of the required inspections, a trip charge of $45.00 shall be added for each inspection not covered by the permit fees.”
  • Permit processPublished (with conditions)

    Crestview city building-permit applications.

    • All permits must be submitted online through My Government Online.
    • Permit applications requiring plan review must be submitted electronically with original PDF plans and required documents.
    • Review fees must be paid before the project goes under review.
    • Inspections are scheduled through MGO or by email.

    permit validity: 180 days (each approved inspection extends permit validity by 180 days)

    “All permits shall be submitted online using My Government Online MGO”

Rules another office applies inside Crestview

Crestview does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    R-1 residential district inside Crestview city limits.

    • Lots of record established on or before December 31, 2020 are exempt from the lot-area requirements in Table 6.01.01.

    minimum lot area: >= 10000 square feet (lots of record are exempt)

    “Minimum lot area (square feet) 14,000 10,000 7,000 5,000”
    3 more reviewed findings on this topic
  • SetbacksSpecified

    R-2 and R-3 residential districts inside Crestview city limits.

    • The table provides front, side, and rear setbacks.
    • The side setback listed is for a lot-line intersection with a right-of-way; the rear setback is for rear-yard conditions described in the table.
    • Lots of record established on or before December 31, 2020 are exempt from Table 6.01.01 requirements.

    front setback: >= 25 feet (R-2) · side setback: >= 7.5 feet (R-2; side setback, lot line intersecting right-of-way) · rear setback: >= 20 feet (R-2) · front setback: >= 20 feet (R-3) · side setback: >= 5 feet (R-3; side setback, lot line intersecting right-of-way) · rear setback: >= 15 feet (R-3)

    “Minimum setbacks (feet) Front setback (along right-of-way) 30 30 25 20 Side setback (lot line intersecting right-of-way) 10 10 7.5 5 Rear setback (intersecting side lot lines) 25 25 20 15”
    One more reviewed finding on this topic
    • Specified — R-1E and R-1 residential districts inside Crestview city limits.
      “Minimum setbacks (feet) Front setback (along right-of-way) 30 30 25 20 Side setback (lot line intersecting right-of-way) 10 10 7.5 5 Rear setback (intersecting side lot lines) 25 25 20 15”
  • Who permits septicState

    Septic permitting inside Crestview city limits, which are located in Okaloosa County.

    • Effective January 2, 2025, the Florida Department of Environmental Protection oversees septic-system permitting in Okaloosa County.
    • The Florida Department of Health in Okaloosa County page directs users to DEP for governing authorities and forms.
    “Effective Thursday, January 2, 2025, the Florida Department of Environmental Protection (DEP) will oversee septic system permitting in Okaloosa County.”
  • Septic inspectionRequired

    OSTDS systems inside Crestview city limits.

    • The official state program describes permitting and inspection as part of the OSTDS program.
    • Owners or contractors with owner authorization may use a private provider for OSTDS inspections beginning July 1, 2022.
    “The OSTDS program ensures that the OSTDS is properly designed, constructed, and maintained through permitting and inspection and contributes to safe ground water, which provides 90 percent of Florida’s drinking water.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Crestview or Okaloosa County directly.

  • Building height — Building height inside Crestview city limits.
  • Tiny homes — Tiny-home occupancy inside Crestview city limits.
  • Accessory dwellings — Accessory-dwelling occupancy inside Crestview city limits.
  • Well permit — Private wells inside Crestview city limits.
  • Agricultural exemption — Agricultural construction or land-use exemptions inside Crestview city limits.
2 more unanswered
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Crestview publishes no rule on the point, not that none exists. Okaloosa County’s page lists the county offices to call.