Clermont, Florida requires a city building permit for a new home and other covered construction.1 Clermont administers zoning inside city limits, while septic permits go through the Florida Department of Health in Lake County.23 Obtain zoning approval before submitting a building permit, and confirm the parcel’s district before choosing a home design.4
At a glance
- Building permits
- Required from Clermont for covered construction1
- Zoning
- City Land Development Code applies inside city limits2
- Septic permits
- Florida Department of Health in Lake County3
- Owner-builder
- Available for the owner’s use and occupancy; conditions apply5
- Minimum home size
- R-3 single-family dwellings: 1,000 square feet of living area, excluding garages, carports and screened areas6
- Wells
- Lake County delegated program covers wells less than 6 inches in diameter7
- Final approval
- Certificate of Occupancy or Completion after approved inspections, as appropriate8
Who to call
Building permits
City building applications, plan review, inspections and final certificates; plans review includes drainage and floodplain requirements.
685 W. Montrose St.
Planning & zoning
Clermont Planning Division & Development Review
City planning and development review.
Septic permits
Florida Department of Health in Lake County, Environmental Public Health
Onsite sewage treatment and disposal and well construction services in Lake County
320 W. Main Street, Tavares, FL 32778
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Clermont means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Clermont, FL?
Clermont requires a building permit for construction, alterations, repairs, moving or demolishing a building, occupancy changes and covered trade work.1 The city lists exceptions for specified residential work, including painting, flooring, tile work, replacement plumbing or lighting fixtures and re-screening; ask Building Services how the exception applies to your exact scope.1 Clermont lists the Florida Building Code effective from December 31, 2023, with no local amendments to the listed codes.9 Owner-builder status does not remove the building-permit requirement.10
Who issues building permits and handles zoning in Clermont?
Clermont Building Services accepts city building applications, reviews plans and oversees inspections; reach the office at 352-241-7315 or [email protected].11 Submit a complete building-permit package to Building Services or use the city’s online permitting link.11 Clermont’s Zoning Division is the starting point for zoning approval, and the city says to obtain that approval before submitting the building permit.4 The Planning Division also provides planning and development review for city properties.12 Septic applications remain a separate matter for Florida Health in Lake County, rather than the city building counter.3
Does Clermont have zoning, and can you build a tiny home?
Clermont’s Land Development Code determines how property inside city limits can be used and supplies development criteria.2 Ask the Zoning Division to identify the parcel’s district and applicable lot-size and setback standards before committing to a layout.13 In Clermont’s R-3 district, a single-family dwelling must have at least 1,000 square feet of living area, excluding garages, carports and screened areas.6 That R-3 minimum rules out a smaller single-family design in that district; it does not establish a citywide minimum or answer whether a tiny home is allowed in another district.6
How do septic permits and wells work inside Clermont?
Septic systems inside Clermont require septic permitting through the Florida Department of Health in Lake County.143 The Environmental Public Health office lists onsite sewage treatment and disposal and well construction services; call 352-253-6130 at the Tavares office for the appropriate application route.15 Lake County’s delegated well program issues permits for wells less than 6 inches in diameter within its district areas; ask the office which authority handles a proposed larger well.7 We could not confirm Clermont’s public-water or sewer connection requirements or whether off-grid sanitation is acceptable for a new city home; resolve those questions with city Building Services and Environmental Public Health before designing an independent system.1115
Can you live in an RV on your land in Clermont?
We could not confirm a Clermont rule allowing residential RV occupancy on a private parcel, including temporary occupancy while building; ask the Zoning Division about the proposed use before relying on an RV as housing.4 Clermont’s zoning controls property use, so building-permit approval for a future house alone does not answer the separate RV-use question.21 For a small permanent home, start with the district’s dwelling standards: Clermont’s verified R-3 single-family minimum is 1,000 square feet of living area.6 Ask the city to distinguish RV occupancy, a permanent dwelling and any proposed accessory dwelling in its zoning review.4
What are the steps to build a home in Clermont?
- Confirm the parcel’s city zoning district and obtain zoning approval before submitting the building permit.24
- Resolve sanitation with Florida Health in Lake County if the home will use septic, and ask Building Services about utility requirements.311
- Submit a complete city building-permit package; plans review checks building-code, zoning, drainage and floodplain requirements.16
- Schedule required inspections after the building permit is issued; final approval leads to a Certificate of Occupancy or Completion, as appropriate.178
Clermont publishes project-dependent fee schedules, and inspection fees must be paid before a certificate of occupancy is issued.18 An owner-builder must use and occupy the building, cannot build it for sale or lease, and must personally appear and sign the affidavit while meeting supervision and employment obligations.5
What should you check before buying land in Clermont?
Have Clermont’s Zoning Division confirm that the proposed use and building layout fit the parcel’s district before you buy.2 Development site plans must identify driveways, approaches, curb cuts and vehicular access, including dimensions and construction specifications.19 City plans review also checks drainage and floodplain requirements, so bring those questions to Building Services early.16 For a property outside Clermont city limits, use the Lake County guide: county planning and zoning rules apply to unincorporated Lake County.20 Septic remains with Florida Health in Lake County for a Clermont address.3
Watch-outs
- Clermont’s 1,000-square-foot single-family minimum cited here belongs to R-3; ask the Zoning Division for the standards of the parcel’s actual district.6
- We could not confirm residential RV occupancy or off-grid sanitation inside Clermont; ask the Zoning Division about RV use and Environmental Public Health about sanitation before buying.415
- Owner-builder eligibility in Clermont is conditional and does not waive building permits or code compliance.510
Sources
- Building Permitting Information (Clermont), quoted and re-checked
- Zoning Division (Clermont), quoted and re-checked
- Environmental Public Health (Clermont), quoted and re-checked
- Clermont Zoning Division (clermontfl.gov)
- Owner-Builder Information (Clermont), quoted and re-checked
- Sec. 125-249. Permitted uses, R-3 district (Clermont), quoted and re-checked
- Water Services (Clermont), quoted and re-checked
- clermontfl.gov (Clermont), quoted and re-checked
- Building Permitting Information (Clermont), quoted and re-checked
- 2026 Florida Statutes § 489.103, Exemptions (Florida statewide rule), quoted and re-checked
- Clermont Building Services (clermontfl.gov)
- Clermont Planning Division & Development Review (clermontfl.gov)
- Zoning Division (Clermont), quoted and re-checked
- Environmental Public Health (Clermont), quoted and re-checked
- Florida Department of Health in Lake County, Environmental Public Health (lake.floridahealth.gov)
- Building Services (Clermont), quoted and re-checked
- Inspections Information (Clermont), quoted and re-checked
- Site Inspection Fees (Clermont), quoted and re-checked
- Sec. 101-352. Site plan submittal requirements (Clermont), quoted and re-checked
- Planning & Zoning - Lake County Government, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.