Sussex County, Delaware
Town of Greenwood is a town in Sussex County, Delaware. Town of Greenwood adopts its own zoning, so inside its limits Town of Greenwood’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Sussex County page.
Land inside Greenwood town limits: the Town adopts and administers its own zoning ordinance (Article 4 districts, incl. R-1, R-2, R-3, DC, HC, M/LI, RPC, UD, OS)
“conditional uses are allowed or denied by the town council after review and comment by the planning commission”
Land inside Greenwood town limits
“section 6.1 r-1 single-family residential district section 6.1.1 purposes”
Main single-family district R-1 (Section 6.1.5) inside Greenwood town limits
minimum lot area: >= 10000 square feet · minimum street frontage on at least one street: >= 80 feet
“6.1.5. dimensional regulations. (1) minimum lot area. minimum lot area shall be 10,000 square feet.”
Main single-family district R-1 (Section 6.1.5) inside Greenwood town limits; principal buildings
front yard setback: >= 30 feet · rear yard setback: >= 25 feet (corner lots may reduce rear depth by 20%) · side yard setback (each of two side yards): >= 12 feet
“(7) side yard setbacks: there shall be two side yards on each lot, each of which shall be a minimum of 12 feet.”
Main single-family district R-1 (Section 6.1.5) inside Greenwood town limits
maximum lot coverage: <= 40 percent of lot
“(2) maximum lot coverage shall be 40% (see definition of “maximum lot coverage”).”
Main single-family district R-1 (Section 6.1.5) inside Greenwood town limits
principal building height: <= 35 feet (or two and one-half stories, whichever is greater) · accessory building height (other than private garages): <= 15 feet
“(4) height of principal buildings shall not exceed two & one-half stories or 35 feet, whichever is greater. accessory buildings, other than private garages, shall not exceed 15 feet in height.”
New manufactured homes as a dwelling in the R-1 single-family district inside Greenwood town limits
“(1) a single-family detached residential dwelling (including modular homes but excluding manufactured homes).”
Premises inside Greenwood town served by the Town sewer system; authority to require connection (state session law charter provision)
“the town of greenwood shall have authority to require any premises to be connected to the sewer system.”
Building permits and certificate-of-occupancy fees, Greenwood town
“building permit: project under $ 1000 cost of project $1001-$5000 cost of project $5001-$20,000 cost of project $20,001-$50,000 cost of project $50,001-$100,000 new construction $100,001-$200,000 new construction $200,001+”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Greenwood or Sussex County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Greenwood publishes no rule on the point, not that none exists. Sussex County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Greenwood means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.