Town of Smyrna, Delaware requires building permits for new buildings and most modifications to existing buildings.1 Smyrna administers its own zoning; for land outside town limits, see the Kent County guide.23 DNREC handles septic approval where septic is applicable, but Smyrna requires water and sewer connections when the applicable town mains become available to abutting property.45
At a glance
- Building permits
- Town approval required for new buildings and most building modifications1
- Zoning
- Town zoning and an official zoning map; requirements depend on district67
- Septic permits
- DNREC approval where septic is applicable; available town sewer can require connection85
- Small accessory homes
- R-1 ADUs are conditional uses, with a 300–800 square-foot size range9
- Private wells
- State permits and a town letter of no objection; town water service restricts private wells10
- Driveway permits
- Town permits required for new or modified sidewalks and driveways11
- Owner electrical work
- Conditional state homeowner-permit program for owner-occupants of single-family dwellings12
Who to call
Building permits
Town of Smyrna Building & Inspections
Town building permit applications, permit searches and construction inspections
Planning & zoning
Town of Smyrna Planning & Zoning
Town zoning review, district use and bulk standards, and development applications
220 Artisan Drive
Septic permits
Delaware DNREC Residential Services Section — Septic Systems
Site evaluation, design and installation approval for onsite wastewater systems
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Town of Smyrna means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Town of Smyrna, DE?
Smyrna requires a building permit for new building construction and most modifications to existing buildings, including additions and structural renovations or repairs.1 The town also lists garages, pole barns, sheds, gazebos, fences, pools and hot tubs among work requiring approval, so a small outbuilding is not automatically exempt.1 Smyrna requires permits for plumbing, HVAC, sidewalks and driveways as well.111 Some work can proceed without a building permit; ask Building & Inspections about the specific project before construction begins.1
Who issues building permits in Town of Smyrna, and how do you apply?
Town of Smyrna Building & Inspections is the building-permit contact at 302-653-3486, and the town provides an online portal for applications and permit searches.13 Smyrna Planning & Zoning first reviews each building and sign permit application for zoning compliance.7 The town publishes a building and inspection fee schedule; the certificate of occupancy fee is $40, payable when the building permit is issued for living units and commercial structures.14 Ask the town for the building-permit charge for your project rather than treating the certificate fee as the whole construction cost.14
Does Town of Smyrna have zoning, lot-size and setback rules?
Smyrna has its own zoning districts, including Agricultural district A and Residential district R-1, and the town planning officer administers the official zoning map.6 Smyrna Planning & Zoning identifies permitted uses and restrictions through the zoning code’s district and supplemental regulations.7 Ask Planning & Zoning at 302-653-3486 to identify the parcel’s district and confirm the applicable lot-size and setback standards before laying out a house or accessory structure.7 In R-1, attached accessory dwelling units must meet the underlying setback and bulk standards, and ADUs require conditional-use approval.9
How do septic permits and water connections work inside Town of Smyrna?
For Smyrna property abutting a street, alley or way containing the applicable town water or sewer main, connection is required within 90 days after that main becomes available.5 Private wells and private sewage facilities must be disconnected, sealed and abandoned under the applicable state rules.5 Where septic is applicable, DNREC approval starts with a site evaluation by a licensed Class D soil scientist, followed by system design and a septic permit; licensed Class E contractors install the system.158 Gravity systems use a Class B designer, while engineered or pressure-dosed systems use a Class C designer.8 Confirm sewer availability before paying for septic design: a state septic permit does not remove Smyrna’s connection obligation.85
Can you live in an RV or tiny home in Town of Smyrna?
We could not confirm whether Smyrna permits RV living on a private parcel; ask Planning & Zoning to review the proposed use and location before relying on an RV as housing.7 Smyrna prohibits camping and overnight stays at Lake Como recreational areas, but that rule does not establish the answer for private land.16 We also could not confirm a specific tiny-home occupancy rule; ask Planning & Zoning about the proposed dwelling type and district.7 Smyrna does provide a conditional-use route for R-1 accessory dwelling units of 300–800 square feet, with full-time owner residence in the primary home or ADU and annual rental licensing and inspection.9 An ADU in an accessory structure is limited to a structure built on or before July 1, 2022; the ADU size range is not a general minimum size for every house.9
What are the steps for building a home in Town of Smyrna?
- Ask Smyrna Planning & Zoning to confirm the parcel’s district, proposed use and zoning compliance before applying for a building permit.7
- Resolve town water and sewer connection obligations; where septic is applicable, arrange DNREC site evaluation, design and septic permitting.58
- Apply to Smyrna Building & Inspections through the town’s permit portal.13
- Before scheduling framing inspection, make the building weathertight, complete air sealing, and obtain approved rough plumbing and electrical inspections.17
- Before scheduling final inspection, complete approved energy testing, Kent Conservation District approval, and final plumbing and electrical inspections.17
What should you check before buying land in Town of Smyrna?
Ask Smyrna about public water availability before budgeting for a private well: town-connected property, or property required to connect, generally cannot have a private well.10 The exception is solely agricultural or irrigation wells on property larger than 5 acres for non-potable agricultural or horticultural business use; state permits and a town letter of no objection are still required.10 A new or modified driveway needs town approval, and an entrance under DelDOT jurisdiction also requires a DelDOT entrance permit before construction or modification.1118 In a participating community’s mapped Special Flood Hazard Area, development requires local floodplain approval; ask Smyrna to identify the administrator for the parcel.19 We could not confirm a general Smyrna owner-builder exemption; Delaware’s conditional homeowner electrical permit is specific to qualifying owner-occupants and electrical work.1312
Watch-outs
- Smyrna’s 90-day water and sewer connection requirements can rule out continued use of private systems when the applicable main becomes available to abutting property.5
- Smyrna’s Agricultural zoning district does not establish a general building-permit exemption; ask Building & Inspections about a proposed barn or farm structure.61
- A Smyrna short-term rental must be the owner’s primary residence, and the owner must be a permanent town resident; a rental license is required before leasing or occupancy.20
Sources
- Permits & Applications (Town of Smyrna), quoted and re-checked
- Appendix A - Zoning, Section 7 - Planning administration, development review and enforcement (Town of Smyrna), quoted and re-checked
- Planning Services (2026 county census)
- Septic Systems (Town of Smyrna), quoted and re-checked
- Ordinance 001-16 - Water and sewer connection obligations (Town of Smyrna), quoted and re-checked
- Appendix A - Zoning, Section 5 - District regulations (Town of Smyrna), quoted and re-checked
- Town of Smyrna Planning & Zoning (smyrna.delaware.gov)
- Septic Systems (Town of Smyrna), quoted and re-checked
- Appendix A - Zoning, Section 5 - District regulations (Town of Smyrna), quoted and re-checked
- Well Permits (Town of Smyrna), quoted and re-checked
- Permits & Applications (Town of Smyrna), quoted and re-checked
- Homeowner Permit (Delaware statewide rule), quoted and re-checked
- Town of Smyrna Building & Inspections (smyrna.delaware.gov)
- 2026 Town of Smyrna Fee Schedule (Town of Smyrna), quoted and re-checked
- Delaware DNREC Residential Services Section — Septic Systems (dnrec.delaware.gov)
- library.municode.com (Town of Smyrna), quoted and re-checked
- Permits & Applications (Town of Smyrna), quoted and re-checked
- Entrance Permit System - Frequently Asked Questions (Delaware statewide rule), quoted and re-checked
- Floodplain Management (Delaware statewide rule), quoted and re-checked
- Chapter 18, Article XI - Rental properties (Town of Smyrna), quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.