Kent County, Delaware
Town of Magnolia is a town in Kent County, Delaware. Town of Magnolia adopts its own zoning, so inside its limits Town of Magnolia’s rules apply, not the county’s. Septic permits inside Town of Magnolia come from the state health agency. 4 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Kent County page.
New construction inside Magnolia town limits, where Kent County issues the building permit only after a Magnolia town permit or town letter of approval is obtained.
“towns which kent county issues building permits, but does not enforce their zoning these city/towns require you obtain a city/town permit or city/town letter of approval to provide kent county to obtain a building permit: town/city corporation code contact information bowers 1 302-335-1039 farmington 6 302-519-0085 felton 7 302-284-9365 hartly 10 302-922-2814 houston 11 302-632-0853 kenton 12 302-389-8270 leipsic 13 302-736-0595 little creek 14 [email protected] magnolia 15 302-335-5891”
Land inside Magnolia town limits: the town publishes its own zoning code, so zoning is administered by the town rather than by Kent County.
“magnolia zoning code – article 3_designation of districts”
Town of Magnolia does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site septic systems for homes inside Magnolia town where no public sewer serves the parcel; DNREC rules apply inside Magnolia town as they do statewide.
“on-site wastewater treatment and disposal systems are governed by delaware’s regulations governing the design, installation and operation of on-site wastewater treatment and disposal systems (7 de admin. code 7101).”
Well construction and use permits for private wells serving land inside Magnolia town; DNREC issues these statewide.
withdrawal threshold: <= 50000 gallons per day
“all wells in delaware must be constructed by a water well contractor licensed by dnrec through the water well licensing board. applications for well construction and well use permits must be completed by a licensed water well contractor.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Magnolia or Kent County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Magnolia publishes no rule on the point, not that none exists. Kent County’s page lists the county offices to call.