Bolthole Index

Teller County, Colorado

Building permits, zoning and land rules in Woodland Park, Colorado

Woodland Park, Colorado requires building permits for new homes through Pikes Peak Regional Building Department, while the city handles zoning development approval.12 The city in Teller County also regulates camping, so an RV is not an automatic housing solution while you build.3 For wastewater, resolve city sewer requirements with Planning & Building and ask Teller County Environmental Health about any existing septic system before buying.45

At a glance

Building permits
Required for new homes; PPRBD provides building services12
Zoning approval
City zoning development permit required for covered development6
Septic and sewer
Subdivision sewer-connection rules apply; confirm any existing septic system with city and county45
RV camping
Designated locations and city council permit required for specified self-contained campers3
Owner-builder
Homeowner permit limited to work on a primary residence the owner owns and resides in7
UR setbacks
Main building: front 25 feet, rear 25 feet, side 8 feet8

Who to call

Planning & zoning

Woodland Park Planning & Building Department

City zoning development approval and building-project coordination

719-687-5202

[email protected]

220 W South Avenue Woodland Park , CO 80866

Building permits

Pikes Peak Regional Building Department

Building permits and inspections serving Woodland Park

719-327-2880

2880 International Circle, Colorado Springs, CO, 80910.

Septic permits

Teller County Environmental Health - Septic Services

County OWTS applications and existing-system questions; confirm city requirements separately

719-687-6416

11115 W Hwy 24 Unit 2C Divide , CO 80814

Contact details are copied from each office’s official page and were checked against it on October 10, 2026.

Off-grid gear

Going off-grid in Woodland Park means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Woodland Park, CO?

A new home inside Woodland Park city limits requires a building permit, and Pikes Peak Regional Building Department provides the city’s building services.12 Woodland Park also requires city zoning development approval for covered construction and development; the building permit does not replace that approval.6 Cosmetic improvements generally do not require a building permit, but location-dependent zoning or floodplain review may still apply.1 Before budgeting a project, ask PPRBD to identify the applicable valuation and building-permit fee schedule rather than assuming a flat house-permit price.9

Who issues building permits in Woodland Park, and how do you reach them?

For Woodland Park building projects, start with Pikes Peak Regional Building Department; for zoning approval and land-use questions, contact the city’s Planning & Building Department.2 Woodland Park Planning & Building is reachable at 719-687-5202 or [email protected].2 PPRBD’s phone is 719-327-2880, and its homeowner information page explains building permits and inspections.10 PPRBD makes inspection results searchable by permit number or address, which gives buyers a practical way to investigate a project’s inspection history.10 Ask the city which zoning development application fits your project, including an addition, shed, driveway or accessory dwelling unit.11

Does Woodland Park have zoning, and what are the setbacks?

Woodland Park has city zoning, with a permitted-use table for commercial, industrial and residential districts.12 The city requires a zoning development permit before covered construction, alteration or renovation, except ordinary repairs and other stated exceptions.6 In Woodland Park’s Urban Residential (UR) district, the main building has a front setback of 25 feet, a rear setback of 25 feet and a side setback of 8 feet.8 Reverse-corner lots have an additional street-side condition, so ask Planning & Building to review the actual lot layout before placing a house.8 We could not confirm district minimum lot sizes or principal-dwelling minimum floor areas; ask city Planning & Building for the standards attached to the parcel’s zoning.

How do septic permits and sewer connections work inside Woodland Park?

Woodland Park’s subdivision rule requires the subdivider to connect to public sanitary sewer when sewer is accessible within 400 feet of the subdivision tract and provide sewer lines accessible to each lot.4 That distance rule concerns subdivisions; ask city Planning & Building to identify the sewer requirements for the specific parcel.4 Teller County Environmental Health publishes OWTS permit applications and a sewage-system file-search application, and can be reached at 719-687-6416.5 We could not confirm the city-specific approval process for replacement individual sewage systems or septic inspections inside Woodland Park; resolve those questions with both offices before relying on an existing system.

Can you live in an RV or tiny home in Woodland Park?

Woodland Park allows specified self-contained camper trailers, recreational camping vehicles and pickup campers to camp at designated locations outside licensed campgrounds only under the chapter’s conditions and with a city council permit.3 That conditional camping provision does not establish permission to live indefinitely in an RV on any privately owned Woodland Park lot.3 Ask city Planning & Building whether the proposed address is eligible and how to request council approval before making an RV your construction-period housing plan.3 We could not confirm a distinct tiny-home occupancy rule or a complete district-specific manufactured-home authorization; ask Planning & Building to identify the permitted use for the proposed dwelling.

Building a home in Woodland Park: what steps should you take?

  1. Ask Woodland Park Planning & Building to identify the parcel’s zoning district and whether the proposed residential use is permitted.12
  2. Resolve sewer availability and ask the city how the subdivision utility rule affects the project; ask county Environmental Health for existing septic records if relevant.45
  3. Obtain the city zoning development approval required for covered work, including a driveway of any size on land contemplated for development.613
  4. Coordinate the new-home building permit with PPRBD and ask which fee schedule applies.19
  5. Arrange the required inspections; homeowner-permitted work must pass them.14

A Woodland Park homeowner permit is conditional on the owner performing work on a primary residence the owner owns and resides in; rental properties and homes where the owner does not reside do not qualify.7

What should you check before buying land near Woodland Park?

Outside Woodland Park city limits, the Teller County guide covers the county’s building-permit rules for unincorporated land; those are a different jurisdiction from the city’s building services through PPRBD.152 Inside Woodland Park, ask city Planning & Building about subdivision or replat approval if your purchase depends on creating or changing lots.16 A driveway on land contemplated for development needs city zoning development approval before work begins, subject to the ordinance’s exceptions.13 We could not confirm city-specific well requirements or certificate-of-occupancy requirements; ask city Planning & Building to identify the responsible water office and ask PPRBD what is needed before moving in.

Watch-outs

  • A Woodland Park building permit does not replace city zoning development approval for covered work.16
  • City council camping approval is conditional and location-specific; confirm eligibility before buying a lot for RV use.3
  • We could not confirm replacement-septic approval inside Woodland Park; ask city Planning & Building and Teller County Environmental Health before committing to a septic-dependent parcel.25

Sources

  1. Homeowner Permits (Woodland Park), quoted and re-checked
  2. Woodland Park Planning & Building Department (woodlandpark.gov)
  3. Woodland Park Code § 8.12.010—Permit required (Woodland Park), quoted and re-checked
  4. Woodland Park Code § 17.44.030—Utilities (Woodland Park), quoted and re-checked
  5. Teller County Environmental Health - Septic Services (tellercounty.gov)
  6. Woodland Park Code § 18.72.020—Zoning development permit required (Woodland Park), quoted and re-checked
  7. Homeowner Permits (Woodland Park), quoted and re-checked
  8. Woodland Park Code § 18.13.040—Setbacks (Woodland Park), quoted and re-checked
  9. RBD Current Building Permit Fee Schedule (Woodland Park), quoted and re-checked
  10. Pikes Peak Regional Building Department (pprbd.org)
  11. Planning & Building Department (Woodland Park), quoted and re-checked
  12. Woodland Park Code § 18.09.090—Districts established (Woodland Park), quoted and re-checked
  13. Woodland Park Code § 18.72.020—Zoning development permit required (Woodland Park), quoted and re-checked
  14. Homeowner Permits (Woodland Park), quoted and re-checked
  15. Building Division, quoted and re-checked
  16. Planning & Building Department (Woodland Park), quoted and re-checked

Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Woodland Park

Woodland Park’s own rules

  • Local zoningPresent (with conditions)

    Land inside Woodland Park city limits.

    • Zoning development permits are required for the activities specified in Code § 18.72.020.
    “Except as otherwise specifically provided in the ordinance codified in this section, it is unlawful to begin any substantial clearing, grading or excavation of any area over one thousand five hundred square feet, or a driveway of any size, on lands contemplated for development or to begin any construction, moving, alteration or renovation, except for ordinary repairs, of any building or other structure until the director of community and economic affairs or his designee has issued a zoning development permit for such action, certifying that the development complies with the applicable requirements of this section.”
  • Zoning districtsPublished (with conditions)

    Commercial, industrial, and residential districts inside Woodland Park city limits.

    • The permitted-use table applies as provided in Code § 18.09.090.
    “The following table of permitted uses shall define the uses permitted in the commercial, industrial and residential districts of Woodland Park:”
  • Camping on your landLimited

    Camping by specified self-contained campers inside Woodland Park city limits.

    • Camping is limited to designated locations, must comply with Chapter 8.12, and requires a permit issued by city council.
    “Other ordinances or sections thereof in conflict notwithstanding, self-contained camper trailers, recreational camping vehicles and pickup campers may be permitted to camp in designated locations other than licensed campgrounds under conditions and in compliance with rules established in this chapter, and upon having been issued a permit by the city council to do so.”
  • Mandatory utility hookupConditional

    Subdivisions inside Woodland Park city limits where public sanitary sewer is accessible.

    • Applies when the public sanitary sewer is accessible within 400 feet of the subdivision tract; otherwise the city may approve individual sewerage facilities or require builders to provide them.

    public sewer accessibility distance: <= 400 feet (Measured from the subdivision tract.)

    “Where a public sanitary sewer is accessible, within four hundred feet of the subdivision tract, the subdivider shall connect with such sanitary sewer and provide adequate sewer lines accessible to each lot.”
  • Subdividing landRegulated (with conditions)

    Subdivision of unplatted land and replats of existing plats inside Woodland Park city limits.

    • Subdivision improvements must comply with applicable city requirements, including the cited utility standards.
    “The Planning and Building Department provides for orderly development and construction within the City and assists with: [...] Subdivision of unplatted land or replats of existing plats”
  • Driveway accessRequired

    Driveways on lands contemplated for development inside Woodland Park city limits.

    • A zoning development permit must be issued before beginning a driveway of any size; ordinary-repair and other stated ordinance exceptions apply.
    “Except as otherwise specifically provided in the ordinance codified in this section, it is unlawful to begin any substantial clearing, grading or excavation of any area over one thousand five hundred square feet, or a driveway of any size, on lands contemplated for development or to begin any construction, moving, alteration or renovation, except for ordinary repairs, of any building or other structure until the director of community and economic affairs or his designee has issued a zoning development permit for such action, certifying that the development complies with the applicable requirements of this section.”
  • Permit processPublished (with conditions)

    Development and building projects inside Woodland Park city limits.

    • The city page directs building-project users to PPRBD; city planning identifies the listed ZDP process for development work.
    “Zoning Development Permits (ZDP) for new construction including remodels, additions, decks, fences, sheds, garages, signs, banners, chicken coops, accessory dwelling units (ADUs), demolition, driveways, home occupations, special events, vacations (lot lines, easements, ROW), etc.”

Rules another office applies inside Woodland Park

Woodland Park does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    New homes and listed construction work inside Woodland Park city limits.

    • Cosmetic improvements are generally described as not requiring a permit; zoning and floodplain review may still be required depending on location.
    “Construction, installation and replacement of, but not limited to, the following: [...] New home”
  • Owner-builder exemptionConditional

    Homeowners seeking permits for work inside Woodland Park city limits.

    • The homeowner must own and reside in the primary residence and perform the work; rental properties and homes where the owner does not reside do not qualify.
    “Yes. As a homeowner you may obtain a permit only if you are performing the work on your primary residence, which you own and reside in. You cannot perform work on a rental property you own nor a home you do not reside in.”
  • InspectionsRequired

    Permitted homeowner construction inside Woodland Park city limits.

    • Applies where a homeowner obtains a permit and performs the work; noncompliant work must be remedied.
    “If you obtain a permit and are completing the work yourself you are expected to know the pertinent codes and are responsible for the work passing all required inspections.”
  • SetbacksSpecified

    Urban Residential (UR) district inside Woodland Park city limits.

    • For reverse-corner lots facing an intersecting street, the street side must maintain the front setback; lots 60 feet wide or less have the roof-feature exception stated in the section.

    front setback: 25 feet · rear setback, main building: 25 feet · side setback, main building: 8 feet

    “Setbacks in the UR district shall be: A. Front. Twenty-five feet. B. Rear. Twenty-five feet for the main building and four feet for accessory buildings. C. Side. Eight feet for the main building and four feet for accessory buildings.”
  • Permit feesPublished (with conditions)

    PPRBD building permits serving Woodland Park city.

    • The current page says 2025 ICC valuation data is effective June 30, 2025; final valuation is set by the Building Official and applicable tables and modifiers govern the fee.

    minimum Table A building-permit fee: 50 USD (For valuation from $1 to $500.)

    “COMMERCIAL AND RESIDENTIAL - NEW CONSTRUCTION AND ALTERATION TABLE A: This permit fee table shall apply as follows: [...] Final building permit valuation shall be set by the Building Official. Regional modifiers used in the application of the adopted ICC Building Valuation Data shall be set by the Regional Building Commission.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Woodland Park or Teller County directly.

  • Certificate of occupancy — Certificate of occupancy for buildings inside Woodland Park city limits.
  • Minimum dwelling size — Principal dwellings in Woodland Park city zoning districts.
  • Minimum lot size — Residential zoning districts in Woodland Park city limits.
  • Lot coverage — Zoning districts inside Woodland Park city limits.
  • Building height — Zoning districts inside Woodland Park city limits.
6 more unanswered
  • Tiny homes
  • Manufactured homes
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Woodland Park publishes no rule on the point, not that none exists. Teller County’s page lists the county offices to call.

← All of Teller County: county rules, score and offices