Florence, Colorado, in Fremont County, requires city building permits for covered work and administers its own zoning inside city limits.12 The City Clerk issues septic permits only when connection to the Fremont Sanitation District sewer is impracticable, and public sewer must be used where it is available and accessible.34
At a glance
- Building permit
- Required for covered construction and other building work inside Florence1
- Zoning
- Florence administers its own zoning districts inside city limits2
- Septic
- City Clerk permit available only when sewer connection is impracticable3
- Minimum home size
- 400 sq ft for single-family or modular dwellings; other dwelling types differ5
- Minimum lot size
- 6,000 sq ft in R-1 and 1 acre in A-T for single-family development67
- RV living
- Not confirmed for a private lot; ask Florence Planning before relying on it8
- Tiny homes
- No separate occupancy rule confirmed; the dwelling-size and zoning rules still apply52
Who to call
Building permits
City of Florence Building Department
Florence building-permit submittals and questions about plans, inspections and required supporting documents
600 W.3rd Street, Florence, Colorado 81226
Zoning
City of Florence Planning Department
City zoning and site-plan questions, including parcel-specific district standards
600 W.3rd Street, Florence, Colorado 81226
Septic permits
Fremont County Building Department: On-Site Wastewater Treatment Systems
County review and approval questions for an onsite wastewater system proposed with a Florence building application
615 Macon Ave. Room 212 Cañon City, CO 81212
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Florence means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Florence, Colorado?
Yes. Florence requires building permits for covered construction, alteration, moving, demolition, repair, maintenance and use of buildings or structures inside city limits.1 The city has adopted the 2006 International Building Code and the 2006 International Residential Code, subject to local amendments.9
Start with the City of Florence Building Department rather than Fremont County's unincorporated-area building counter. The city's application checklist calls for a completed application, ownership documentation, a site plan, proof of water, proof of sewer or septic, building and foundation plans, and a site-specific soils report.10 Florence's complete inspection sequence and certificate-of-occupancy trigger could not be confirmed; ask the Building Department which inspections and final approval apply before scheduling work.
Who issues building permits in Florence, and how do you apply?
The City of Florence Building Department is the local building-permit office for property inside Florence. Its published checklist directs applicants to submit required materials before a building permit is issued and gives the Municipal Center contact shown above.10 The Building Department should also confirm which plans, professional stamps and inspection stages apply to the specific project.
A Florence building application needs a site plan showing property lines, setbacks, existing and proposed structures, utilities, drainage and driveway location.10 The checklist also requires proof of water service and proof of sewer or an approved septic application.10 Electrical and plumbing permits and inspections are issued and scheduled through the Colorado Department of Regulatory Agencies rather than the city.10
Does Florence have zoning, and what does it mean for a home?
Florence administers its own zoning districts inside city limits, so the parcel's district controls the applicable lot and building standards.2 In R-1, single-family development requires a minimum lot area of 6,000 square feet and a minimum lot width of 50 feet.6 In the A-T agricultural-transitional district, the minimum lot area is 1 acre and the minimum lot width is 50 feet.7
Florence sets a 400-square-foot minimum gross floor area for single-family and modular dwellings, while manufactured homes require 864 square feet and accessory dwelling units require 300 square feet.5 These are different dwelling categories, not interchangeable labels. Ask Florence Planning to verify the zoning district, allowed housing type, setbacks and any site-specific approval before ordering plans.8
How do septic permits work inside Florence?
Florence does not treat an onsite septic system as the default wastewater option. Where a public sewer is available and accessible within an established sanitary sewer district, a septic tank may not be used.4 A Florence septic permit comes from the City Clerk, and the application must include a statement from the Fremont Sanitation District that sewer connection is impracticable.3
The city's building checklist also calls for Fremont County review and approval of the septic application before it is submitted as proof of septic with the building package.10 Contact the Fremont County onsite wastewater program at the number above about that review.11 The Florence code material does not confirm the septic inspection sequence, so ask both the City Clerk and county program what approvals are required before installation and covering the system.
Can you live in an RV or tiny home in Florence?
We could not confirm a Florence rule allowing full-time RV occupancy on an ordinary private lot or temporary RV living during construction. Ask Florence Planning for a written parcel-specific answer before buying land or arranging utilities.8 A rule for an RV park or campground would not by itself answer private-lot occupancy.
Florence's verified dwelling-size rule does provide a useful boundary for tiny-home planning: a single-family or modular dwelling must contain at least 400 square feet of gross floor area, while an accessory dwelling unit must contain at least 300 square feet.5 Florence zoning remains district-specific, and no separate tiny-home occupancy provision was confirmed.2 Bring the proposed structure type, foundation, dimensions and intended use to Planning before relying on the tiny-home label.
Building a home in Florence: what are the steps?
- Confirm that the parcel is inside Florence and ask Planning to identify its zoning district, allowed residential use and district standards.28
- Confirm water and sewer availability. Where public sewer is available and accessible in an established sanitary sewer district, an onsite septic tank may not be used.4
- If sewer connection is impracticable, obtain the sanitation-district statement, pursue the City Clerk's septic permit and ask Fremont County about its review.311
- Prepare the city building application, site plan, ownership record, utility proof, soils report, and building and foundation plans requested by the checklist.10
- Complete the inspections and final approvals identified by the Building Department; the full Florence sequence could not be confirmed.
What should you check before buying land in Florence?
First verify city-limit status and zoning. Florence's municipal building and zoning rules apply inside city limits, while Fremont County's building jurisdiction serves unincorporated land.112 Confirm the district rather than relying on a listing: R-1 and A-T have different lot-size, coverage and accessory-building standards.671314
Next, verify water and sewer service before assuming septic is possible.4 For land with a mapped flood hazard, the City Building Official reviews new-construction and substantial-improvement building applications for flood safety.15 A driveway connecting directly to a Colorado state highway requires a state access permit.16 Private-well requirements and the complete city driveway-approval rules could not be confirmed, so ask the relevant city and state offices before closing.
Watch-outs
- A Florence septic permit requires a finding that connection to the Fremont Sanitation District sewer is impracticable; septic is not an automatic alternative to available sewer.34
- Florence's R-1 and A-T dimensional standards differ, so do not apply one district's lot or coverage limit to another parcel.671314
- Flood-hazard review is part of the city building-permit review for new construction or substantial improvements in affected locations.15
- Private-lot RV occupancy and a separate tiny-home occupancy category could not be confirmed; ask Florence Planning before relying on either use.8
Sources
- Florence Code § 15.04.040, building permit requirement (Florence), quoted and re-checked
- Florence Code § 17.20.040, R-1 yard and bulk requirements (Florence), quoted and re-checked
- Florence Code § 13.20.020, septic tank permit (Florence), quoted and re-checked
- Florence Code § 8.12.010, cesspools prohibited where public sewers are available (Florence), quoted and re-checked
- Florence Code § 17.64.130, minimum dwelling unit requirements (Florence), quoted and re-checked
- library.municode.com (Florence), quoted and re-checked
- library.municode.com (Florence), quoted and re-checked
- City of Florence Planning Department (cityofflorenceco.gov)
- Florence Code § 1.01.020, adopted codes (Florence), quoted and re-checked
- City of Florence Building Department (cityofflorenceco.gov)
- Fremont County Building Department: On-Site Wastewater Treatment Systems (fremontcountyco.gov)
- Planning and Zoning, quoted and re-checked
- library.municode.com (Florence), quoted and re-checked
- Florence Code § 17.14.050, A-T yard and bulk requirements (Florence), quoted and re-checked
- Florence Code § 15.14.050, review of building permit applications (Florence), quoted and re-checked
- Access Permits | Frequently Asked Questions (Colorado statewide rule), quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.