Federal Heights, Colorado, in Adams County, has its own Building Department and zoning rules. The city publishes building-permit applications and handles inspections for active city permits, while Colorado administers electrical permits and inspections.1 Adams County Health Department handles septic systems where public sewer is unavailable.2
At a glance
- Building permit
- City permits are required for many listed construction projects; ask the Building Department about work not on its published list.3
- Zoning
- Federal Heights uses conventional zone districts and negotiated PUD districts.4
- Septic
- Adams County Health Department handles onsite systems where public sewer is unavailable.2
- RV living
- The verified city rule covers licensed RV parks, not living in an RV on an ordinary residential lot; ask Planning before relying on RV occupancy.5
- Tiny home
- No separate tiny-home occupancy rule was confirmed; district dwelling-size rules still matter.67
- Minimum home size
- Varies by zone district and, in some districts, by unit type or building details.6897
Who to call
Building permits
City of Federal Heights Building Department
City building applications, guides, fees, adopted technical-code information and inspection scheduling for active permits
2380 W. 90th Ave., Federal Heights, CO 80260
Building permits
City of Federal Heights Building Department permit guide
The city's published examples of work that does and does not require a building permit
Planning & zoning
City of Federal Heights Planning Department
Zoning, land-use questions, development applications and zoning verification inside Federal Heights
2380 W. 90th Avenue Federal Heights, CO 80260
Septic permits
Adams County Health Department, Water Quality Team
Septic-system applications, design review, permits, inspections and installer licensing for Adams County
4430 South Adams County Parkway Brighton, Colorado 80601
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Federal Heights means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Federal Heights, Colorado?
Federal Heights requires city building permits for many common projects, including remodeling, structural or plumbing modifications, roofing, room additions, garages, accessory buildings, and every storage shed.3 The city's list is expressly incomplete, so ask the Federal Heights Building Department about a project that is not listed before work begins.3 The city page provides building applications, guides, fee information and adopted technical-code information.1 Electrical permits and electrical inspections are administered by the Colorado Department of Regulatory Agencies rather than the city.1
Who issues building permits in Federal Heights?
The City of Federal Heights Building Department is the local counter for building applications and for inspections tied to active city building permits.1 To schedule an inspection, call by 3:30 p.m. on the preceding day and provide the permit number and requested inspection type.10 The department's published permit guide says to contact the city when a project does not appear on its examples list.3 Reach the Building Department at the phone or email shown above; use Colorado DORA for electrical permitting and electrical inspections.1
Does Federal Heights have zoning?
Federal Heights has local zoning and uses both conventional districts and negotiated Planned Unit Development districts.4 The published districts include commercial, industrial, several residential districts and PUDs, so the zoning map and any property-specific PUD plan matter before design begins.11 In the R-1 district, an interior lot has a 6,500-square-foot minimum area and a corner lot has an 8,000-square-foot minimum area.12 R-1 principal-building setbacks are 25 feet in front, 5 feet on an interior side and 20 feet at the rear.13 Ask the city Planning Department to confirm the parcel's district and applicable standards.14
What do Federal Heights zoning rules mean for home size?
Federal Heights does not have one citywide minimum dwelling size; the standard depends on the zone district and sometimes the unit or building.6 R-1 requires at least 950 square feet per dwelling, while R-2 requires at least 850 square feet per dwelling.68 In R-3, minimums run from 500 square feet for a one-bedroom unit to 950 square feet for a four-bedroom unit.9 R-5 standards vary with principal-building height and construction date.7 A separate tiny-home occupancy category could not be confirmed, so bring a proposed tiny-home design and parcel address to Planning before purchase.14
How do septic permits work inside Federal Heights?
Adams County Health Department administers onsite wastewater systems in Federal Heights where a property is not served by public sewer.2 For regulated installation, expansion or repair work, submit a septic-system permit application with the design and soils report; the department issues the permit when the application complies with Regulation O-26.15 Near completion, the installer requests a final inspection, and a passing inspection is followed by approval to backfill.16 Minor work that does not affect the listed tank, field or line components can be exempt, including replacement of risers, lids and distribution boxes.17
Can you live in an RV in Federal Heights?
The confirmed Federal Heights RV rule is for an independent travel-trailer, motor-home or recreational-vehicle park, not for living in an RV on an ordinary residential parcel.5 Such a park needs a city license, must satisfy special-use-permit criteria, and requires city-council and building-inspector approval.5 Camping on city property is prohibited without written permission from the city manager or an authorized designee, but that rule does not answer private-lot occupancy.18 Before buying land for RV living, ask Federal Heights Planning for a written determination tied to the parcel and proposed duration.14
Building a home in Federal Heights: what are the steps?
- Ask Federal Heights Planning to confirm the parcel's zone district, allowed residential use and any PUD standards.4
- Use the city's building applications and guides, and ask the Building Department which submissions and fees apply.19
- Obtain electrical permits and inspections from Colorado DORA.1
- If public sewer is unavailable, complete Adams County Health's septic design, soils-report and permit process.15
- Schedule each city building inspection using the active permit number and requested inspection type.10
What should you check before buying in Federal Heights?
Confirm the exact Federal Heights zone district and whether a negotiated PUD governs the parcel, because a PUD can carry plan-specific standards.4 Check the district's lot size, setbacks, lot coverage, height and dwelling-size standards before assuming an existing lot can hold the intended project.12132021 Buildings in mapped flood-hazard areas must comply with the city's floodplain rules.22 Verify public sewer availability; Adams County Health handles onsite wastewater only where public sewer is unavailable.2 Federal Heights' general certificate-of-occupancy and owner-builder rules could not be confirmed, so ask the Building Department before budgeting or closing.1
Watch-outs
- Federal Heights' published building-permit examples are not a complete list; ask the city about any unlisted project.3
- The confirmed RV-park rule does not establish that residential-lot RV occupancy is allowed.5
- Electrical permits and inspections go through Colorado DORA, not the Federal Heights Building Department.1
Sources
- City of Federal Heights Building Department (fedheights.org)
- Septic Systems (Federal Heights), quoted and re-checked
- City of Federal Heights Building Department permit guide (fedheights.org)
- Planning and Zoning (Federal Heights), quoted and re-checked
- Section 14-250. Application for license (Federal Heights), quoted and re-checked
- Section 70-214. Permitted density in R-1 district (Federal Heights), quoted and re-checked
- Section 70-328. Permitted density in R-5 district (Federal Heights), quoted and re-checked
- Section 70-242. Permitted density in R-2 district (Federal Heights), quoted and re-checked
- Section 70-264. Permitted density in R-3 multiple-family residential district (Federal Heights), quoted and re-checked
- Building Department (Federal Heights), quoted and re-checked
- Zoning Information (Federal Heights), quoted and re-checked
- Section 70-214. Permitted density in R-1 district (Federal Heights), quoted and re-checked
- Section 70-214. Permitted density in R-1 district (Federal Heights), quoted and re-checked
- City of Federal Heights Planning Department (fedheights.org)
- Septic Systems (Federal Heights), quoted and re-checked
- Septic Systems (Federal Heights), quoted and re-checked
- Septic Systems, quoted and re-checked
- Section 46-124. Unauthorized camping and structures on city property prohibited (Federal Heights), quoted and re-checked
- Building Department (Federal Heights), quoted and re-checked
- Section 70-214. Permitted density in R-1 district (Federal Heights), quoted and re-checked
- Section 70-214. Permitted density in R-1 district (Federal Heights), quoted and re-checked
- Floodplain construction amendment (Federal Heights), quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.