Bolthole Index

Santa Clara County, California

Building permits, zoning and septic rules in Palo Alto, California

Palo Alto, California requires a building permit for a new home, remodel or accessory dwelling unit through the city’s Development Services office.1 Palo Alto planning staff handle zoning questions, while Santa Clara County Environmental Health issues septic permits and inspects installation.23 A home inside Palo Alto that will not connect to a public sanitary sewer also needs sewage-disposal plans submitted to the health officer and a permit.4

At a glance

Building permits
Required for new homes, remodels and ADUs; apply to Palo Alto1
Zoning
Ask Palo Alto Planning Services about the parcel and proposed use2
Septic permits
County Environmental Health issues OWTS permits; city code also requires health-officer plans and approval34
Accessory dwellings
Allowed where single-family or multi-family residential use is permitted, subject to applicable standards5
Owner-builder
Conditional contractor-license exemption; building permits and inspections still required67
Wells
Local permit required before construction, modification or destruction8

Who to call

Building permits

Palo Alto Development Services

Building permit applications, plan review and building inspection scheduling

(650) 329-2496

[email protected]

Online permits →

Planning & zoning

Palo Alto Planning Services

Planning and zoning questions and zoning compliance review

(650) 617-3117

[email protected]

Septic permits

Santa Clara County Department of Environmental Health — Land Use Program

Septic site evaluations, OWTS permits and installation inspections

Floodplain permits

Palo Alto Public Works

Flood insurance program and construction in the public right-of-way

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Palo Alto means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Palo Alto, CA?

Palo Alto requires building permits for new single-family homes, home remodels, ADUs, reroofs, and mechanical, electrical and plumbing work.1 Palo Alto has adopted the California Building Code with local amendments, exceptions and additions.9 Ask Development Services which building-permit checklist fits your project before preparing the application.1

California’s owner-builder exemption concerns contractor licensing and has conditions on who performs the work and whether improvements are intended for sale.6 An owner-builder must still obtain building permits and pass applicable codes and building inspections.7

Who handles Palo Alto building permits, fees and permit searches?

Palo Alto Development Services accepts building-permit documents through Accela Citizen Access and checks applications for completeness before formal review.1 A dedicated Project Coordinator guides the project, and complete submittals become official building-permit applications before fee payment starts plan check.1 Call the building office at (650) 329-2496 or email [email protected] about your application and current fees.1

Use the city’s Accela portal for the building-permit application.1 Request a current fee estimate for your scope rather than budgeting from the published FY2023 schedule, which varies by permit type, valuation and review category.10

Does Palo Alto have zoning, and what about setbacks and ADUs?

Palo Alto Planning Services answers zoning questions and performs zoning compliance plan checks on single-story single-family building-permit applications.2 California reserves ordinary building setbacks and side and rear yard requirements to local jurisdictions, subject to statutory exceptions.11 Ask Palo Alto planning staff to identify the parcel’s district and the applicable lot-size, setback and house-size standards before committing to a design.2

Palo Alto allows ADUs in zoning districts where single-family or multi-family residential use is permitted, subject to the applicable local or state standards.5 That ADU pathway does not by itself confirm permission to occupy a movable tiny home; ask Planning Services about the specific unit and site.52

How do septic permits work inside Palo Alto?

A Palo Alto building that will not connect to a public sanitary sewer needs sewage-disposal plans submitted to the health officer and a permit; health-officer approval is separately required.4 The private sewage plans must include a plot plan with elevations, septic-tank size and type, and the absorption-field layout and dimensions.12

Santa Clara County Environmental Health issues OWTS permits and conducts installation inspections, including for properties without public sewer service.3 Start with the county Land Use Program for site evaluation and soil testing, and coordinate the city’s health-officer approval with Palo Alto Development Services before designing a home around private wastewater disposal.1341

Can you live in an RV or tiny home in Palo Alto?

We could not confirm a Palo Alto rule resolving residential RV occupancy, temporary private-land camping or occupancy of a tiny home; ask Palo Alto Planning Services about the intended use before buying a unit.2 Palo Alto’s verified ADU provision allows accessory dwellings where residential use is permitted, subject to applicable standards, but does not establish a blanket permission for an RV or tiny home on wheels.5

For land outside city limits, consult the Santa Clara County guide: the county’s movable-tiny-home ADU rule is expressly for unincorporated land.14 Do not use that county approval pathway as proof that a Palo Alto parcel qualifies.14

Building a home in Palo Alto: what are the steps?

  1. Discuss the proposed use and zoning with Palo Alto Planning Services; planning-entitlement applications are accepted by appointment.2
  2. Resolve sewage disposal: private systems need health-officer plans and approval, and County Environmental Health handles OWTS permits and inspections.43
  3. Gather the city’s building-permit submittal documents and upload them through Accela Citizen Access.1
  4. Respond to completeness review through the assigned Project Coordinator, then pay building-permit fees when the city converts the complete submittal; plan check begins after payment.1
  5. Coordinate building inspections with Development Services; final inspections must be scheduled by phone.1

What should you check before buying land in Palo Alto?

Ask Palo Alto Public Works about flood exposure and proposed driveway work in the public right-of-way: that office administers the National Flood Insurance Program and supports right-of-way construction.15 We could not confirm the complete city floodplain-development or driveway-access requirements; describe the parcel and proposed work to Public Works before assuming either is routine.15

California requires a local permit before constructing, modifying or destroying a water well; within Valley Water’s service area, Valley Water requires well permits and County Environmental Health approval for water-supply well construction applications.816 Ask those offices to confirm the applicable approval route for a Palo Alto parcel before relying on private well water.16

Watch-outs

  • Palo Alto building and zoning questions belong with the city; Santa Clara County Environmental Health still handles OWTS permits and installation inspections.123
  • We could not confirm permission for residential RV occupancy or tiny-home occupancy in Palo Alto; ask Planning Services before treating a parked unit as housing.2
  • Palo Alto warns that building-permit payments must go through Accela Citizen Access and that city staff will not email a PDF invoice requesting a separate payment link.1

Sources

  1. Palo Alto Development Services (paloalto.gov)
  2. Palo Alto Planning Services (paloalto.gov)
  3. Onsite Wastewater Treatment System (OWTS), quoted and re-checked
  4. 16.10.050 Plans submitted - Permit (Palo Alto), quoted and re-checked
  5. 18.09.020 Applicable Zoning Districts (Palo Alto), quoted and re-checked
  6. California Business and Professions Code Section 7044 (California statewide rule), quoted and re-checked
  7. Owner-Builder Responsibilities (California statewide rule), quoted and re-checked
  8. Well Standards (California statewide rule), quoted and re-checked
  9. 16.04.010 California Building Code adopted and amended (Palo Alto), quoted and re-checked
  10. Planning and Development Services Fiscal Year 2023 Adopted Municipal Fee Schedule (Palo Alto), quoted and re-checked
  11. California Health and Safety Code Section 17922 (California statewide rule), quoted and re-checked
  12. 16.10.050 Plans submitted - Permit (Palo Alto), quoted and re-checked
  13. Santa Clara County Department of Environmental Health — Land Use Program (deh.santaclaracounty.gov)
  14. Santa Clara County Zoning Ordinance, quoted and re-checked
  15. Palo Alto Public Works (paloalto.gov)
  16. Well Permits and Inspections, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Palo Alto

Palo Alto’s own rules

  • Building code adoptedAdopted (with conditions)

    Building work inside Palo Alto city limits subject to the adopted California Building Code.

    • The adopted code incorporates omissions, amendments, exceptions, and additions.
    “The California Building Code, 2025 Edition, Title 24, Part 2, Volumes 1 & 2 of the California Code of Regulations”
  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units inside Palo Alto city limits where single-family or multi-family residential is a permitted land use.

    • ADUs are subject to applicable local or state standards depending on the statutory category.
    • A single-family home, ADU, and/or JADU on a lot allowing single-family development is not treated as multi-family development and does not require architectural review under other Chapter 18 provisions.
    “The establishment of an accessory dwelling unit is permitted in zoning districts when single-family or multi-family residential is a permitted land use.”
  • Septic permitRequired

    Construction of private sewage systems inside Palo Alto city limits.

    • Plans must be submitted under PAMC 16.10.050.
    • Health-officer approval is separately identified in PAMC 16.10.060.
    “It shall be unlawful for any person, firm or corporation to construct, build, or rebuild any residence, place of residence, or other building or place where persons congregate, reside or are employed which is not to be connected to a public sanitary sewer without first submitting plans of the means of sewage disposal to the health officer, and obtaining a permit therefor as herein provided.”
  • Off-grid sanitationLimited

    Private or off-grid sewage disposal inside Palo Alto city limits.

    • Private sewage systems require submitted plans and a permit.
    • Health-officer approval is separately required by the code.
    • The research did not establish that all off-grid sanitation technologies are allowed.
    “Such plans shall include the plot plan of the premises with sufficient elevations, the size and type of septic tank, and a plan of the absorption field, giving all dimensions and other pertinent information.”
  • Mandatory utility hookupSewer (with conditions)

    Discharge to a city sewer or storm-drain system inside Palo Alto city limits.

    • Discharge must use a city-approved sewer connection unless authorized by an exceptional waste discharge permit under Section 16.09.180.
    “No person shall discharge any substances directly into a manhole or other opening in a city sewer or storm drain system, other than through a city-approved sewer connection or as authorized by an exceptional waste discharge permit per Section 16.09.180 of this chapter.”
  • Permit feesPublished (with conditions)

    Palo Alto Planning and Development Services permits and related inspections.

    • The source is expressly the Fiscal Year 2023 adopted municipal fee schedule; fees are variable by permit type, valuation, project size, inspection type, and applicable plan-review category.

    new single-family permit fee: 1165.82 USD per permit (listed in the FY2023 schedule) · certificate of use and occupancy: 1345.39 USD each (listed in the FY2023 schedule)

    “PLANNING AND DEVELOPMENT SERVICES • CITY OF PALO ALTO FISCAL YEAR 2023 ADOPTED MUNICIPAL FEE SCHEDULE”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Palo Alto or Santa Clara County directly.

  • Owner-builder exemption — Owner-builder permit exemptions inside Palo Alto city limits.
  • Minimum dwelling size — Main single-family residential districts inside Palo Alto city limits.
  • Living in an RV — Long-term or residential RV occupancy inside Palo Alto city limits.
  • Camping on your land — Temporary camping on private land inside Palo Alto city limits.
  • Tiny homes — Tiny-home occupancy inside Palo Alto city limits.
7 more unanswered
  • Manufactured homes
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Palo Alto publishes no rule on the point, not that none exists. Santa Clara County’s page lists the county offices to call.

← All of Santa Clara County: county rules, score and offices