Inside Campbell, California, the city issues building permits for construction and administers its own zoning12. Santa Clara County Environmental Health, not the city building counter, issues septic permits where public sewer service is unavailable3. RVs cannot be used for camping except under Campbell's narrow camping rules4.
At a glance
- Building permit
- Required for construction; apply through Campbell's MGO system15
- Zoning
- Campbell has its own zoning code and residential districts2
- Septic
- Santa Clara County Environmental Health permits onsite systems where sewer is unavailable3
- RV living
- An RV cannot be used for camping except under the city's limited camping rules4
- Yard camping
- Limited residential-yard camping is allowed, but not in a motor vehicle or trailer6
- Owner-builder
- State contractor-license exemption may apply, but city building permits still do71
- Tiny home
- City-lot occupancy rule not confirmed; ask Campbell Planning before buying8
Who to call
Building permits
City of Campbell Building Division
Building permits, plan review and construction questions for projects inside Campbell city limits
City Hall- Upper Level, 70 North 1st Street, Campbell, CA 95008
Planning & zoning
City of Campbell Planning Division
Zoning, land-use review and planning permits for property inside Campbell city limits
City Hall- Upper Level, 70 North 1st Street, Campbell, CA 95008
Septic permits
Santa Clara County Department of Environmental Health
General Environmental Health contact for the county program that issues onsite wastewater treatment system permits and inspects installations where public sewer is unavailable
1555 Berger Drive, Building #2, Suite 300, San Jose, CA 95112
Contact details are copied from each office’s official page and were checked against it on October 10, 2026.
Off-grid gear
Going off-grid in Campbell means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Campbell, California?
Yes. Campbell says a building permit is required to do construction inside the city1. The broader city guidance says a Campbell building permit is required for all new construction and, in most cases, for demolition, replacement, additions, expansions, alterations and remodeling9.
The City of Campbell Building Division approves plans and issues construction permits within city limits10. Santa Clara County's building-permit rules cover unincorporated land, so the county building counter is not the starting point for a Campbell parcel11. California's owner-builder exemption concerns contractor licensing; an owner-builder still has to obtain required city building permits and pass inspections7.
Who issues building permits in Campbell, and how do you reach them?
The City of Campbell Building Division issues building permits for construction inside Campbell10. Call (408) 866-2130, email [email protected], or visit the upper level of City Hall at 70 North 1st Street, Campbell, CA 9500810.
Campbell directs applicants to create an account in MGO Connect, choose the proper application group and upload the required documents5. Planning approval may be a separate step, so zoning questions go to the Campbell Planning Division at (408) 866-2140 or [email protected]8. Septic approval is also separate and remains with Santa Clara County Environmental Health3.
Does Campbell have zoning, and what does it mean for lots and homes?
Yes. Campbell has its own zoning code and residential zoning districts for land inside city limits2. The Planning Division manages development review and is the right office to confirm a parcel's district, allowed use and project-specific standards before design work starts8.
Standards depend on the district. In Campbell's R-1 single-family residential district, maximum lot coverage is 40%12. Campbell also has a Mobile Home Park zoning district intended for mobile homes, modular homes and supporting or comparable uses13. The city materials reviewed did not establish a general minimum dwelling size or a specific tiny-home occupancy rule, so ask Planning to classify the proposed unit and site before relying on a listing or seller's description8.
How do septic permits work inside Campbell?
Santa Clara County Environmental Health issues permits for new onsite wastewater treatment systems and repairs to existing systems where public sewer is unavailable3. The county program also reviews proposed designs, evaluates sites and oversees soil testing, and inspects installations14.
A permit from Environmental Health is required before constructing, reconstructing or repairing an individual septic system in Santa Clara County15. For new development, Environmental Health clearance comes before the building permit, and the applicant must contact Environmental Health to schedule required installation inspections1516. Campbell's Building and Planning divisions do not replace that county health approval108.
Can you live in an RV or tiny home in Campbell?
Do not treat a parked RV as a legal dwelling in Campbell. The city says recreational vehicles may not be used for camping except in compliance with its limited camping chapter4. Residential-yard camping may occur for no more than 7 days in a calendar month and no more than 4 nonresidents at once, but it cannot involve a motor vehicle or trailer and must meet the other listed conditions6.
We could not confirm a Campbell rule specifically allowing occupancy of a tiny home on a private lot. California requires a tiny home used for occupancy to fit an approved classification and to be placed where that classification is allowed17. Ask the Campbell Planning Division to confirm zoning and the Building Division to confirm construction classification before purchase810.
Building a home in Campbell: the steps, in order
- Ask the Campbell Planning Division to confirm the parcel's zoning district, allowed residential use and development standards28.
- Confirm public sewer service; if an onsite system is proposed, begin Environmental Health review and obtain septic clearance before the city building permit15.
- Create an MGO Connect account, select the correct Campbell building-permit application group and upload all required documents5.
What stays with Santa Clara County, and what should you check before buying?
Campbell decides zoning and building permits inside city limits, while Santa Clara County Environmental Health handles septic permits where public sewer is unavailable213. A Valley Water permit is required before covered well drilling, modification, repair or destruction within the district's service area; water-supply well applications also require county Environmental Health approval18.
Before buying, have Campbell Planning confirm the parcel's zoning and intended use, and ask the Building Division about the proposed structure810. If the plan involves moving a property line or dividing land, Campbell regulates subdivisions, parcel maps, lot-line adjustments and lot mergers19. Private-well permitting inside Campbell was not confirmed, so verify the address with Valley Water and Environmental Health before assuming a well is available1814.
Watch-outs
- Santa Clara County's unincorporated zoning and building rules do not govern a parcel inside Campbell; use the city Planning and Building divisions20810.
- Campbell does not allow an RV to be used for camping except under its limited camping rules, and residential-yard camping cannot involve a motor vehicle or trailer46.
- A septic approval is separate from the city building permit and comes from Santa Clara County Environmental Health where public sewer is unavailable315.
Sources
- Building | Campbell, CA (Campbell), quoted and re-checked
- Campbell Municipal Code § 21.08.020, Residential zoning districts (Campbell), quoted and re-checked
- Onsite Wastewater Treatment System (OWTS), quoted and re-checked
- Campbell Municipal Code § 21.28.120, Recreational vehicle parking (Campbell), quoted and re-checked
- Building | Campbell, CA (Campbell), quoted and re-checked
- Campbell Municipal Code § 6.40.010, Camping prohibited (Campbell), quoted and re-checked
- California Business and Professions Code Section 7044, quoted and re-checked
- City of Campbell Planning Division (campbellca.gov)
- Business Basics Guide | Campbell, CA (Campbell), quoted and re-checked
- City of Campbell Building Division (campbellca.gov)
- Apply for a Building Permit, quoted and re-checked
- Campbell Municipal Code § 21.08.050, Residential development standards (Campbell), quoted and re-checked
- Campbell Municipal Code § 21.08.020, Residential zoning districts (Campbell), quoted and re-checked
- Santa Clara County Department of Environmental Health (deh.santaclaracounty.gov)
- Other approvals that may be needed for construction, quoted and re-checked
- Application for septic/OWTS clearance for new development, quoted and re-checked
- Information Bulletin 2016-01: Tiny Homes (California statewide rule), quoted and re-checked
- Well Permits and Inspections, quoted and re-checked
- Land Development | Campbell, CA (Campbell), quoted and re-checked
- Planning Services, quoted and re-checked
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.