Martinez, California issues building permits through the city Building Division and administers zoning through city Planning.12 Inside Martinez in Contra Costa County, septic systems and wells also require review by Contra Costa Environmental Health.3 New city building permit applications go through the online portal; RV living remains unconfirmed, so ask Planning before relying on it.12
At a glance
- Building permits
- City Building Division issues building permits inside city limits1
- Zoning
- City zoning districts; Planning is the zoning administrator42
- Septic systems
- Contra Costa Environmental Health review and OWTS construction permits35
- RV living
- Not confirmed; ask city Planning about the proposed parcel and occupancy2
- ADU/JADU minimum size
- 150 square feet or the size needed for an efficiency unit, whichever is greater6
- Private wells
- County water-well permit application and licensed driller required7
Who to call
Building permits
City of Martinez Building Division — Permit Center
City building permit applications, plan review and inspection questions
525 Henrietta Street
Zoning
City of Martinez Planning Division
City zoning administration and development proposal review
525 Henrietta Street
Septic permits
Contra Costa Health — Environmental Health Land Use Program
County septic design review, construction inspection and well permits
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Martinez means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Martinez, CA?
The Martinez Building Division issues building permits to homeowners and licensed contractors for construction inside city limits; ask the Permit Center which building approvals your proposed work requires.1 Martinez has adopted the 2025 California Building Code.8 A single-parcel residential development also needs a site development permit for non-building improvements such as grading, drainage, driveways and walkways.9 Improvements within public rights-of-way still require an encroachment permit.9 Martinez permit fees for work covered by its building-code chapter are set by City Council resolution, rather than a single fixed amount.10
Who handles building permits and zoning in Martinez?
For Martinez building permit questions, contact the city Permit Center at (925) 372-3515 or [email protected]; the counter is at 525 Henrietta Street.1 Martinez Planning serves as the city zoning administrator and reviews development proposals.2 City building permit applications must be submitted electronically through the online portal; solar applications continue through SolarAPP+ only.1 The Building Division email is for questions, and building permit applications sent there are not accepted.1 Ask the Permit Center about owner-builder paperwork and the inspections required for your specific project before submitting a building permit application.1
Does Martinez have zoning, and what are the lot and ADU rules?
Martinez publishes its own zoning districts, including residential and rural residential districts.4 In Martinez’s R-1.5 district, the minimum site area is 5,000 square feet; in RR-20.0, the minimum is 20,000 square feet.1112 Martinez subdivision maps must conform to city zoning requirements for land use, lot dimensions, parking and other applicable standards.13 Martinez ADUs and JADUs must be at least 150 square feet or large enough for an efficiency unit, whichever is greater; that rule does not establish the minimum size of a primary house.6 Newly constructed Martinez ADUs are exempt from the zoning or overlay district’s maximum lot coverage and floor-area ratio.14
How do septic permits and well permits work inside Martinez?
Contra Costa Environmental Health serves properties with septic systems and wells, including properties inside Martinez; projects involving those systems need Environmental Health-approved plans at application submittal.3 County OWTS construction permits cover new systems, alterations, replacements, abandonment and tank replacement.5 Permitted septic work requires inspections, approved plans kept at the job site, and written authorization before placing the system in service.15 The county water-well application requires a plot plan and a licensed well driller’s signature.7 Ask Environmental Health to evaluate sewage disposal early, and ask city Planning and the serving sewer agency about sewer connection requirements before treating septic as an option for a Martinez parcel.162
Can you live in an RV or tiny home on your land in Martinez?
We could not confirm a Martinez rule allowing long-term RV occupancy, temporary camping or a tiny home on wheels on private land; ask city Planning about the exact parcel, vehicle and intended use before buying.2 For a small permanent accessory dwelling instead, Martinez’s ADU/JADU minimum-size provision requires 150 square feet or the space needed for an efficiency unit, whichever is greater.6 That ADU provision does not answer RV occupancy or establish a minimum size for every primary dwelling.6 For land outside city limits, use the Contra Costa County guide: the county’s RV habitation restrictions cited there apply to unincorporated land.17
Building a home in Martinez: what are the steps, in order?
- Ask Martinez Planning to identify the parcel’s zoning and review the proposed development before finalizing a design.2
- For septic or well property, obtain Contra Costa Environmental Health plan approval for application submittal.3
- Discuss site development and any public-right-of-way improvements with the city; a site development permit covers non-building site improvements, while an encroachment permit remains separate.9
- Submit the city building permit application electronically through the online portal.1
- Arrange city building inspections through the Building Inspection Request Recorder, and obtain the separate required septic inspections when applicable.115
Before committing to a Martinez project in a flood zone, ask the city Building Division to review flood status and construction costs; the city evaluates those questions case by case.1
Watch-outs
- Martinez building permit applications moved to electronic submission in September 2026; paper applications require an exceptional-circumstances approval from the Chief Building Official.1
- We could not confirm Martinez’s general occupancy-certificate or owner-builder requirements; ask the city Building Division before planning move-in or self-managed construction.1
- Contra Costa County zoning and building rules for unincorporated land do not answer a parcel inside Martinez city limits; city Planning administers Martinez zoning.182
Sources
- City of Martinez Building Division — Permit Center (cityofmartinez.org)
- City of Martinez Planning Division (cityofmartinez.org)
- contracosta.ca.gov, quoted and re-checked
- Title 22: Zoning - City of Martinez, CA (Martinez), quoted and re-checked
- OWTS Construction Permit Application, quoted and re-checked
- Chapter 22.43: Accessory Dwelling Units and Junior Accessory Dwelling Units (Martinez), quoted and re-checked
- Water Well Permit Application, quoted and re-checked
- Chapter 15.04: Building Code (Martinez), quoted and re-checked
- Chapter 15.04: Building Code (Martinez), quoted and re-checked
- Chapter 15.04: Building Code (Martinez), quoted and re-checked
- Chapter 22.12: Residential Districts (R and RR) (Martinez), quoted and re-checked
- Chapter 22.12: Residential Districts (R and RR) (Martinez), quoted and re-checked
- Chapter 21.02: General Provisions (Martinez), quoted and re-checked
- ecode360.com (Martinez), quoted and re-checked
- OWTS Construction Permit Application, quoted and re-checked
- Contra Costa Health — Environmental Health Land Use Program (cchealth.org)
- Contra Costa County Ordinance Code, Chapter 84-68, T-1 Mobile Home/Manufactured Home Park District, quoted and re-checked
- Planning and Zoning, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.