Winslow, Arizona requires a building permit and an approved site plan before constructing or remodeling a building or accessory structure.1 Winslow sets its own zoning inside city limits; Navajo County zoning applies outside incorporated towns and cities.23 Septic applications go to Navajo County under Arizona’s delegated wastewater program, separately from city building approval.45
At a glance
- Building permit
- City building permit and approved site plan required before construction or remodeling1
- Zoning
- City zoning with district-specific development standards2
- Septic
- County-administered ADEQ approval, subject to delegation limits45
- Lot size
- R1-12 minimum lot size: 12,000 square feet6
- Building height
- R1-7 maximum building height: 35 feet7
- Owner-builder
- State contractor-license exemption can apply to qualifying owner-occupied construction; city building approval still applies8
Who to call
Building permits
City of Winslow Community Development — City Hall contact
City Hall referral to Community Development for city building and zoning questions
102 E. Third Street
Planning & zoning
City of Winslow — building and site-plan requirements
City building permit and site-plan application requirements
Septic permits
Navajo County Planning & Development Services
County contact for delegated onsite wastewater approval; confirm jurisdiction for the specific Winslow parcel
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Winslow means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Winslow, AZ?
Winslow requires a building permit and approved site plan before construction or remodeling of any building or accessory structure.1 Applications follow the city’s development procedures ordinance, so take the proposed footprint and use to the city before ordering a structure or starting work.1 Winslow’s adopted code lists the 2018 International Residential Code, including Appendix Q, alongside related construction codes and city amendments.9 Arizona’s owner-builder exemption concerns contractor licensing for qualifying owner-occupied work; the exemption does not remove local building-permit requirements or cover a project intended for sale or rent.8
Who handles building permits and zoning in Winslow?
Start with Winslow Community Development through the City Hall contact at (928) 289-2422 or [email protected]; the city website also links a building-permit application.10 Ask the city to confirm the parcel’s zoning district, the site-plan submission requirements and the applicable building-permit fee before preparing final plans.12 Navajo County’s zoning ordinance excludes incorporated towns and cities, so use the Navajo County guide for land outside Winslow city limits.3 Septic approval remains a separate county-administered ADEQ process rather than part of the city building-permit application.4
Does Winslow have zoning, and what does it mean for a small home?
Winslow has city zoning with district-specific development standards; a parcel’s district matters more than a general description such as residential land.2 In Winslow’s R1-12 Single-Family Residence District, the minimum lot size is 12,000 square feet.6 In the R1-7 Single-Family Residence District, maximum building height is 35 feet.7 These are district standards, not citywide averages.2 Winslow’s adopted residential code includes Appendix Q, but that adoption alone does not establish permission to occupy a tiny home on a particular lot.9 Ask Community Development to confirm the proposed dwelling type, setbacks and allowed use together before choosing a house plan.10
How do septic permits and wells work inside Winslow?
Arizona directs onsite wastewater applications to the county where the property is located; Navajo County administers delegated septic approval on ADEQ’s behalf, with ADEQ retaining projects outside the delegation.45 For residential onsite wastewater construction, submit a Notice of Intent to Construct and obtain approval before installing the system; construction, inspection and testing precede the Notice of Intent to Discharge, and operation requires Discharge Authorization.11 Before buying a Winslow lot, ask the city about public sewer availability and whether connection is mandatory, then ask Navajo County Planning & Development Services to confirm the onsite system’s jurisdiction.1012 A new groundwater well requires an ADWR Notice of Intent to Drill and a licensed well-drilling contractor.13
Can you live in an RV or tiny home on land in Winslow?
Do not use Navajo County’s unincorporated-land RV allowances as authorization for a Winslow address: the county zoning ordinance excludes incorporated towns and cities.3 Ask Winslow Community Development for the city’s written answer on RV occupancy, temporary camping and living onsite during construction before planning a move.10 For a small permanent dwelling, Winslow’s residential code adoption includes Appendix Q, while the parcel remains subject to its city zoning district’s development standards.92 Arizona’s long-term RV rental-space law concerns rented spaces in RV or mobile-home parks; that law does not establish permission to live in an RV on a private Winslow lot.14
What steps should you take before building a home in Winslow?
- Ask Community Development to confirm the parcel’s city zoning district and whether the proposed use fits that district.102
- Prepare the site-plan and building-permit application through the city’s development procedures.1
- Resolve sewer service with the city or obtain county-administered onsite wastewater construction approval before installing a septic system.1011
- Ask the city for the inspection sequence, occupancy sign-off, floodplain review and street-access requirements for the proposed project.10
- If the purchase depends on splitting land, discuss Winslow’s subdivision process before closing: the process includes pre-application review, preliminary and final plat stages, with information on water supply, streets, sewage disposal, drainage and open space.15
Watch-outs
- Winslow’s R1-12 minimum lot size is a lot-area requirement, not a minimum dwelling floor area.6
- A qualifying Arizona owner-builder licensing exemption does not waive Winslow building approval.8
- For a resale home served by septic, the seller’s qualified inspection must occur within six months before transfer, and the buyer must submit the Notice of Transfer within 15 calendar days after transfer.16
Sources
- City of Winslow — building and site-plan requirements (ecode360.com)
- City of Winslow, AZ Municipal Code Table of Contents (Winslow), quoted and re-checked
- Navajo County Zoning Ordinance, quoted and re-checked
- Onsite Wastewater Treatment Facility | ADEQ (Arizona statewide rule), quoted and re-checked
- Construction Permit Application, quoted and re-checked
- Chapter 17.20 R1-12 Single-Family Residence District (Winslow), quoted and re-checked
- Chapter 17.24 R1-7 Single-Family Residence District (Winslow), quoted and re-checked
- Persons not required to be licensed; penalties; applicability (Arizona statewide rule), quoted and re-checked
- ecode360.com (Winslow), quoted and re-checked
- City of Winslow Community Development — City Hall contact (winslowaz.gov)
- Onsite Wastewater Treatment System Type 4.02–4.23 General Permit, quoted and re-checked
- Navajo County Planning & Development Services (navajocountyaz.gov)
- Well Drilling in Arizona, quoted and re-checked
- 33-2101 - Application; duration of stay; exclusions; notice and pleading requirements (Arizona statewide rule), quoted and re-checked
- Chapter 16.08 Subdivision Approval Process (Winslow), quoted and re-checked
- Notice of Transfer and Inspection, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.