Town of Taylor, Arizona requires a separate town building permit for each building or structure.1 Taylor administers its own zoning, while septic applications go to the county where the property is located under Arizona’s ADEQ delegation system.23 For a Taylor parcel in Navajo County, start septic questions with Navajo County Planning & Development Services and confirm the system’s delegated permit category.4
At a glance
- Building permits
- Town building permit required for each building or structure1
- Zoning
- Town zoning applies inside Taylor limits; confirm the parcel’s district25
- Septic authority
- Start with Navajo County under ADEQ delegation; confirm system eligibility4
- Owner-builder
- Owner may obtain the town building permit and perform work; owner electrical work has occupancy restrictions6
- Manufactured-home size
- AG-2 multi-section manufactured homes require at least 1,100 square feet7
- Additional dwellings
- AG-2 additional dwelling units require conditional-use approval8
- Floodplain
- Town flood-damage-prevention provisions apply to development inside Taylor9
Who to call
Building permits
Town of Taylor Building Department
Town building, plumbing, mechanical and electrical permits and inspections
425 Papermill Road, Taylor, AZ 85939
Planning & zoning
Town of Taylor Planning & Zoning Department
Town zoning, site-plan and subdivision review; start town floodplain questions here
425 Papermill Road, Taylor, AZ 85939
Septic permits
Navajo County Planning & Development Services
County onsite wastewater administration under ADEQ delegation; confirm Taylor parcel and system requirements
1100 E. Thornton Rd., Show Low, AZ 85901
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Town of Taylor means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Town of Taylor, AZ?
Taylor requires a separate town building permit for each building or structure under its adopted and amended International Building Code.1 Taylor’s owner-builder option allows the owner of a one- or two-family dwelling to obtain the building permit and do the work personally.6 The Arizona owner-builder exemption concerns contractor licensing and does not remove local building-permit requirements.10
Owner-performed electrical work in Taylor requires the owner to be the occupant, and the dwelling cannot be intended for sale, lease, rent or exchange.6 Work performed under a Taylor building, electrical, mechanical or plumbing permit must be inspected.11
Who is the Town of Taylor building department?
Contact the Town of Taylor Building Department at (928) 536-7366 for building-permit questions and inspections; the town’s published address is 425 Papermill Road, Taylor, AZ 85939.12 For a home application, Taylor requests the property address and parcel number, a description of the proposed work, and two sets of plans showing the building and its placement on the property.12
Taylor collects the plan-review fee when plans are submitted and the structural building-permit fee when the permit is issued.12 Ask the Building Department for the current fee for your proposed work.12 Taylor requires at least 24 hours’ notice for inspections and adult site access unless all work is outside and accessible.11
Does Town of Taylor have zoning, lot-size and setback rules?
Taylor Planning & Zoning administers the town’s zoning regulations inside town limits; confirm the parcel’s district with the town zoning map before designing a home.25 Taylor’s planners review building setbacks, grading, drainage and floodplain issues, so ask Planning & Zoning for the parcel-specific lot-size and setback requirements.13
In Taylor’s AG-2 district, multi-section manufactured homes must have at least 1,100 square feet, and additional dwelling units on the same lot are conditionally permitted uses.78 AG-2 principal structures have a maximum height of 30 feet.14 The AG-2 manufactured-home minimum does not establish a minimum size for every dwelling type in Taylor.7
How do septic permits work inside Town of Taylor?
Arizona directs onsite wastewater permit applications to the county where the property is located, with county administration under ADEQ delegation.3 Navajo County Planning & Development Services accepts delegated onsite wastewater work; its delegated conventional-system category covers design flows below 3,000 gallons per day, with conflict-of-interest projects reviewed by ADEQ.4
Call Navajo County Planning & Development Services at 928-532-6040 to confirm the septic permit category and inspection requirements for your Taylor address.15 We could not confirm the complete Taylor-specific installation and inspection requirements; ask the county before committing to a septic design.15 For Taylor minor land divisions, available water and sewer must be extended and installed; that requirement cannot be waived under the land-division provision.16
Can you live in an RV or tiny home in Town of Taylor?
We could not confirm authorization or a duration limit for private-land camping or RV living inside Taylor; ask Town Planning & Zoning about the proposed occupancy and any temporary-use approval.13 We also could not confirm Taylor’s complete tiny-home occupancy requirements; ask the Building Department to review the proposed structure and intended use before buying it.12
Taylor’s verified AG-2 minimum of 1,100 square feet applies to multi-section manufactured homes, rather than every dwelling type.7 An additional dwelling unit in AG-2 requires the applicable conditional-use process.8 For land outside Taylor limits, use the Navajo County guide for the county’s separate unincorporated-area RV rules.17
Building a home in Town of Taylor: what are the steps?
- Ask Taylor Planning & Zoning to confirm the zoning district and review the proposed home’s setbacks, drainage and floodplain issues.513
- Resolve water and sewer availability with the town, especially for a newly divided lot; Taylor’s minor-land-division rule requires available water and sewer extensions.16 For onsite wastewater, ask Navajo County to confirm the delegated septic permit category.4
- Submit the parcel information, description of work and home plans to Taylor’s Building Department, and pay the plan-review fee.12
- Begin construction after Taylor issues the building permit and returns the approved plans.12
- Arrange required inspections with at least 24 hours’ notice and provide adult access when work is indoors or otherwise inaccessible.11
What should you check before buying land in Town of Taylor?
For a newly created Taylor lot, confirm adequate access to public roads or highways and review the town’s minor-land-division approval requirements.1819 A driveway accessing Arizona Department of Transportation right-of-way requires ADOT access approval; access permits do not transfer to a new owner.20
All development inside Taylor must conform to the town’s flood-damage-prevention provisions; start floodplain questions with Taylor Planning & Zoning.913 We could not confirm the private-well or off-grid sanitation requirements for Taylor parcels; ask the town and Navajo County Planning & Development Services to identify the applicable authority before relying on either option.1315 For an existing home on septic, the seller must obtain a qualified inspection within 6 months before transfer, and the buyer must submit the Notice of Transfer within 15 calendar days afterward.21
Watch-outs
- Taylor’s AG-2 manufactured-home minimum is not a townwide minimum for all homes.7
- We could not confirm an agricultural building-permit exemption inside Taylor; ask the Town Building Department before ordering a barn or agricultural structure.12
- Taylor handles development floodplain questions inside town limits; Navajo County directs Taylor flood-hazard inquiries to the town.9
Sources
- ecode360.com (Town of Taylor), quoted and re-checked
- Planning & Zoning (Town of Taylor), quoted and re-checked
- Onsite Wastewater Treatment Facility | ADEQ (Arizona statewide rule), quoted and re-checked
- Construction Permit Application, quoted and re-checked
- Planning & Zoning (Town of Taylor), quoted and re-checked
- Permits (Town of Taylor), quoted and re-checked
- Chapter 18.15: AG-2 Agricultural-2 Zoning District (Town of Taylor), quoted and re-checked
- Chapter 18.15: AG-2 Agricultural-2 Zoning District (Town of Taylor), quoted and re-checked
- Chapter 18.60: General Building and Development Standards (Town of Taylor), quoted and re-checked
- Persons not required to be licensed; penalties; applicability (Arizona statewide rule), quoted and re-checked
- Permits (Town of Taylor), quoted and re-checked
- Town of Taylor Building Department (tayloraz.gov)
- Town of Taylor Planning & Zoning Department (tayloraz.gov)
- Chapter 18.15: AG-2 Agricultural-2 Zoning District (Town of Taylor), quoted and re-checked
- Navajo County Planning & Development Services (navajocountyaz.gov)
- Chapter 17.30: Minor Land Divisions (Town of Taylor), quoted and re-checked
- Navajo County Zoning Ordinance, quoted and re-checked
- Chapter 17.30: Minor Land Divisions (Town of Taylor), quoted and re-checked
- Chapter 17.30: Minor Land Divisions (Town of Taylor), quoted and re-checked
- Encroachment Permits Guideline & Procedures 2024 (Arizona statewide rule), quoted and re-checked
- Notice of Transfer and Inspection, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.