Bolthole Index

Coconino County, Arizona

Building permits, zoning and land rules in Town of Tusayan, Arizona

Town of Tusayan, Arizona requires a final signed Town building permit before construction; Coconino County reviews building plans and performs inspections on the Town’s behalf.12 Tusayan sets its own district-specific zoning rules, including temporary RV limits.34 Coconino County Environmental Quality handles onsite wastewater within its delegated jurisdiction, while the Tusayan Sanitary District may require separate approval.56

At a glance

Building permit
Town approval required before construction1
Plan review and inspections
Coconino County acts on the Town’s behalf2
Zoning
Town district rules govern lot size and setbacks37
RV living
Temporary-use permit and district restrictions apply48
Septic
County Environmental Quality within delegated jurisdiction; separate sanitary-district approval may apply56
Owner-builder
State contractor-license exemption available for qualifying personal-occupancy projects; Town building permit still required91
Private wells
State Notice of Intent and licensed driller required10

Who to call

Building permits

Town of Tusayan Engineering & Development

Town pre-application coordination, building permit issuance and planning forms; County performs building review and inspections.

928-638-9909

[email protected]

845 Mustang Drive, Tusayan, AZ 86023

Septic permits

Coconino County Community Development, Environmental Quality Division

Onsite wastewater permitting, site investigations and inspections within County delegated jurisdiction.

928-679-8850

2500 N Fort Valley Rd Building 1 Flagstaff, AZ 86001

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Town of Tusayan means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Town of Tusayan, AZ?

Construction inside Town of Tusayan requires the Town’s final signed building permit before work starts.1 Applicants must first submit a completed Pre-Application Checklist and receive Town approval before applying for civil or building permit review.6 Coconino County conducts building-plan review under an intergovernmental agreement, but the Town issues the final building permit after County review.2 County personnel also perform building inspections on Tusayan’s behalf.2 Treat Town approval and County technical review as separate steps in the same project.6

Who handles building permits and planning in Town of Tusayan?

Start with Town of Tusayan Engineering & Development for the Town pre-application process, rather than assuming a County building application alone authorizes construction inside town limits.6 The Town’s process places pre-application approval before County building review and Town permit issuance.6 Separate approvals may also be required from the Tusayan Sanitary District, Tusayan Fire District, Coconino County Flood Control District, Grand Canyon School District or Arizona State Fire Marshall, depending on the project.6 Ask the Town which agencies must sign off on the proposed home before commissioning final plans.6 Call Town Hall at 928-638-9909 or email [email protected] to schedule a pre-application meeting.11

Does Town of Tusayan have zoning, lot minimums and setbacks?

Tusayan’s Agricultural Residential (AR) and Rural Residential (RR) districts have a base minimum lot size of 1 acre, but the Official Zoning Map can designate larger minimums.3 In AR and RR, listed yards are 25 feet front, 20 feet rear, 10 feet interior side and 15 feet street side.7 AR and RR also have maximum lot coverage of 35% and maximum structure height of 35 feet.1213 National-forest adjacency changes certain side or rear setbacks, and specified public or semi-public uses have separate setback requirements.7 Ask the Town to identify the parcel’s mapped district and applicable exceptions before laying out a house, accessory building or wastewater area.37

How do septic permits work inside Town of Tusayan?

Coconino County Environmental Quality has delegated authority for conventional septic systems and some alternative onsite wastewater systems up to 3,000 gallons per day.5 Within that jurisdiction, the County reviews applications, issues construction authorizations, inspects newly constructed systems and authorizes discharge.1415 Tusayan also identifies the Tusayan Sanitary District as an agency with concurrent jurisdiction whose separate approval may be required.6 We could not confirm Tusayan’s general sewer-connection requirement or whether a particular town lot can use septic; ask the Town and Sanitary District about sewer service, then ask County Environmental Quality about onsite wastewater approval.65 Resolve the wastewater route before treating the lot as suitable for an off-grid home.614 County Environmental Quality’s published contact number is 928-679-8850.16

Can you live in an RV or tiny home in Town of Tusayan?

Tusayan’s temporary-use application allows RV or travel-trailer occupancy in G, AR, RR or MHP zones for up to 100 consecutive days per calendar year when the parcel has no dwelling or other residential structure.4 The G, AR and RR development standard separately limits temporary residency to 100 days per year, requires a temporary-use permit before occupancy and requires removal when the permit expires.8 With a building permit, temporary occupancy in G, AR or RR may last up to 6 months; renewal requires an active dwelling building permit.4 Tusayan separately prohibits RV or travel-trailer residence in Residential Zones.4 We could not confirm a distinct tiny-home occupancy rule or minimum dwelling floor area; ask Town planning to classify the proposed structure and use before purchase.6

Building a home in Town of Tusayan: what are the steps?

  1. Ask the Town to confirm the zoning district, mapped lot minimum and building envelope.37
  2. Submit the completed Pre-Application Checklist and obtain Town approval before civil or building review.6
  3. Identify any separate sanitary-district, flood-control or fire approvals needed for the project.6
  4. Complete Coconino County building-plan review and obtain the Town’s final signed building permit before starting construction.21
  5. Arrange the required building inspections through the County personnel acting for Tusayan.2

Arizona’s qualifying owner-builder exemption concerns contractor licensing for personal-occupancy projects, not permission to skip Tusayan’s building permit.91

What should you check before buying land in Town of Tusayan?

For a Tusayan parcel in an identified special flood-hazard area, Town flood rules govern construction, utilities, manufactured homes and RV placement; onsite effluent systems cannot be installed wholly or partly in the regulatory floodway.17 Floodplain rules add conditions to RV placement rather than replacing Tusayan’s temporary-use limits.174 Before drilling, deepening or modifying a private well, Arizona requires a Notice of Intent to Drill filed with ADWR and a licensed well-drilling contractor.10 Ask the Town and Sanitary District to confirm utility service and required approvals for the exact address.6 For land outside Tusayan town limits, use the Coconino County guide for the County’s unincorporated building-permit process.18

Watch-outs

  • County plan review does not authorize construction in Tusayan: wait for the Town’s final signed building permit.12
  • Tusayan’s RV allowance depends on zoning, existing residential use and temporary-use approval; do not apply an unincorporated County RV allowance inside town limits.4
  • We could not confirm Tusayan’s adopted building-code edition, certificate-of-occupancy procedure or current Town permit fees; request these from Town Engineering & Development before budgeting construction.6

Sources

  1. tusayan-az.gov (Town of Tusayan), quoted and re-checked
  2. tusayan-az.gov (Town of Tusayan), quoted and re-checked
  3. § 9.3 Property Development Standards: G, AR and RR Zones (Town of Tusayan), quoted and re-checked
  4. Temporary Use Permit Application and Requirements (Town of Tusayan), quoted and re-checked
  5. Environmental Quality, quoted and re-checked
  6. tusayan-az.gov (Town of Tusayan), quoted and re-checked
  7. § 9.3 Property Development Standards: G, AR and RR Zones (Town of Tusayan), quoted and re-checked
  8. § 9.3 Property Development Standards: G, AR and RR Zones (Town of Tusayan), quoted and re-checked
  9. Persons not required to be licensed; penalties; applicability (Arizona statewide rule), quoted and re-checked
  10. Permitting and Wells Overview, quoted and re-checked
  11. Town of Tusayan Engineering & Development (tusayan-az.gov)
  12. § 9.3 Property Development Standards: G, AR and RR Zones (Town of Tusayan), quoted and re-checked
  13. § 9.3 Property Development Standards: G, AR and RR Zones (Town of Tusayan), quoted and re-checked
  14. Environmental Quality, quoted and re-checked
  15. Environmental Quality, quoted and re-checked
  16. Coconino County Community Development, Environmental Quality Division (coconino.az.gov)
  17. § 13.6-6 Provisions for Flood Hazard Reduction (Town of Tusayan), quoted and re-checked
  18. Minimum Building Plan Requirements, Building Permit Procedures, and Minimum Plan Requirements for Residential Projects, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Tusayan

Town of Tusayan’s own rules

  • Building permitRequired

    Construction within the Town of Tusayan.

    • A completed Pre-Application Checklist must be approved by the Town before applying for civil or building permit review.
    • No construction may begin until the Town issues its final signed building permit.
    “No construction may begin until the Town has issued its final signed building permit.”
  • Minimum lot sizeSpecified

    Agricultural Residential and Rural Residential Zones AR and RR.

    • The base minimum is one acre.
    • Larger minimums may be designated on the Official Zoning Map in one-half-acre increments, such as AR-2 and AR-2-1/2.

    AR and RR minimum lot: >= 1 acre (Larger minimums may be designated on the Official Zoning Map in half-acre increments.)

    “In the AR and RR Zone, the minimum lot size shall be one acre. However, larger minimum lot sizes may be specified and designated on the Official Zoning Map by attaching a number designation following the zone classification: such number shall be in increments of one-half acre.”
  • SetbacksSpecified

    Residential Single-Family Zones RS-6000, RS-10000, RS-18000, and RS-36000.

    • Where a property is adjacent to the national forest, required side or rear setback is 80% of the listed setback but never less than five feet.
    • The table also includes a 50-foot setback for public or semi-public buildings from a single-family use.

    front yard RS-6000/RS-10000: 20 feet · front yard RS-18000/RS-36000: 25 feet · rear yard RS-6000/RS-10000: 20 feet · rear yard RS-18000/RS-36000: 25 feet · interior side RS-6000: 5 feet · interior side RS-10000/RS-18000: 10 feet · interior side RS-36000: 20 feet

    “Front yard, in feet 20 20 25 25 Lot coverage, maximum 40% 40% 35% 35% [...] Rear yard, in feet 20 20 25 25 Side yard - interior, in feet 5 10 10 20 Side yard - street side, in feet 10 10 15 20 [...] Where a property is adjacent to the national forest, the required side or rear yard minimum setback shall be 80% of the setback shown in division (C)(1)(a) above; except that, in no case shall the setback be less than five feet.”
    One more reviewed finding on this topic
  • Lot coverageSpecified

    Residential Single-Family Zones RS-6000, RS-10000, RS-18000, and RS-36000.

    • The table states that the listed requirements are minimum unless otherwise noted.
    • National-forest adjacency changes side or rear setbacks, but the cited provision does not change the lot-coverage percentages.

    RS-6000/RS-10000 maximum lot coverage: <= 40 percent · RS-18000/RS-36000 maximum lot coverage: <= 35 percent

    “Lot coverage, maximum | 40% | 40% | 35% | 35%”
    One more reviewed finding on this topic
    • Specified — Agricultural Residential and Rural Residential Zones AR and RR.
      “Building site, net area in acres (or as specified per division (B)(1) of this section 10 1 1 Distance between buildings, in feet 10 10 10 Dwelling unit per parcel, maximum 1 1 1 Front yard, in feet 30 25 25 Lot coverage, maximum 30% 35% 35%”
  • Building heightSpecified

    Agricultural Residential and Rural Residential Zones AR and RR.

    • The listed requirements are minimum unless otherwise noted.

    maximum building height: <= 35 feet

    “Structure height, maximum, in feet | 40 | 35 | 35”
    One more reviewed finding on this topic
  • Living in an RVLimited

    Temporary recreational-vehicle or travel-trailer occupancy inside Tusayan town limits.

    • In G, AR, RR, or MHP zones, temporary occupancy may not exceed 100 consecutive days per calendar year if the lot or parcel is not already occupied by a dwelling or other residential structure.
    • With a building permit, temporary occupancy in G, AR, or RR may last up to six months; the permit may be renewed only if the building permit is for a dwelling and remains active.
    • A temporary-use permit is required for temporary uses.
    • The code separately prohibits recreational-vehicle or travel-trailer residence in Residential Zones.

    temporary occupancy duration: <= 100 consecutive days per calendar year (Lot or parcel must not already be occupied by a dwelling or other residential structure.) · building-permit temporary occupancy duration: <= 6 months (G, AR, or RR Zone; active dwelling building permit required for renewal.)

    “Temporary occupancy of a recreational vehicle or a travel trailer in the G, AR, RR, or MHP Zone for a period not to exceed 100 consecutive days per calendar year, provided that the lot or parcel is not already occupied by a dwelling or other residential structure.”
  • Camping on your landLimited

    Temporary camping or temporary residential use in an RV, park model, or travel trailer inside Tusayan town limits.

    • In G, AR, and RR zones, one recreational vehicle, park model, or travel trailer may be used for temporary residency for no more than 100 days per year if the lot is not already occupied by a dwelling.
    • A temporary-use permit must be obtained before establishing the temporary residence, and the unit must be removed when the permit expires.

    temporary residency duration: <= 100 days per year (Lot or parcel must not already be occupied by a dwelling.)

    “In the G, AR and RR Zones, one recreational vehicle, park model or travel trailer per lot or parcel may be used for temporary residency not to exceed 100 days per year; provided, the lot or parcel is not already occupied by a dwelling.”
  • Manufactured homesLimited

    Manufactured-home occupancy inside Tusayan town limits.

    • The permitted-use table lists manufactured homes as permitted in G and AR zones and not permitted in RR in the displayed table.
    • In Multiple-Family Residential Zones, a mobile, manufactured, or modular home may not be used as a main or guest dwelling or accessory living quarters except in remote areas on parcels larger than two acres with a conditional-use permit.
    • Flood-hazard areas impose additional elevation and anchoring requirements.

    exception parcel size: > 2 acres (Remote area in a Multiple-Family Residential Zone; conditional-use permit required.)

    “In any Multiple-Family Residential Zone, a mobile, manufactured or modular home may not be used as a main or guest dwelling or accessory living quarters, except in remote areas on parcels larger than two acres where one manufactured or modular home may be allowed with the granting of a conditional use permit.”
  • Building in a floodplainLimited

    New construction, substantial improvements, utilities, subdivisions, manufactured homes, and recreational vehicles in identified special flood-hazard areas inside Tusayan town limits.

    • New construction and substantial improvements must be anchored and use flood-resistant materials and methods.
    • Lowest floors must be elevated to or above the regulatory flood elevation, with professional certification.
    • Zone AO construction must be at least one foot above the FIRM depth number, or at least two feet if no depth number is specified.
    • On-site effluent systems may not be installed wholly or partially within the regulatory floodway.
    • RV placement is limited to fewer than 180 consecutive days if fully licensed and highway-ready, or otherwise must meet permit, elevation, and anchoring requirements.
    • Floodway encroachments require professional certification showing no increase in flood levels.

    Zone AO elevation: >= 1 foot above FIRM depth number (At least 2 feet if no depth number is specified.) · RV placement without floodplain permit/elevation alternative: < 180 consecutive days (RV must be fully licensed and ready for highway use.)

    “All recreational vehicles placed on site will either: (1) Be on site for fewer than 180 consecutive days, and be fully licensed and ready for highway use; or (2) Meet the permit requirements of § 13.6-5 of this code and the elevation and anchoring requirements for manufactured homes in division (E) above (or division (A)(3)(e) above).”
  • Permit processPublished (with conditions)

    Building permit process inside Tusayan town limits.

    • Town approval of a completed Pre-Application Checklist precedes civil or building permit review.
    • Coconino County performs the building permit review under an intergovernmental agreement.
    • The Town issues the final signed building permit.
    • Separate permits may be required from concurrent-jurisdiction agencies, including the Coconino County Flood Control District, Tusayan Sanitary District, Tusayan Fire District, Grand Canyon School District, and Arizona State Fire Marshall.
    “Applicants planning to build within the Town of Tusayan must submit to the Town and receive Town approval of a completed Pre-Application Checklist before applying for civil or building permit review.”

Rules another office applies inside Town of Tusayan

Town of Tusayan does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • InspectionsRequired

    Building inspections inside Tusayan town limits, performed by Coconino County under an intergovernmental agreement.

    • Coconino County personnel are authorized to perform inspections on the Town’s behalf.
    • The Town issues the final signed building permit after County review.
    “By intergovernmental agreement, Town of Tusayan building permit reviews are done by Coconino County, whose personnel are also authorized to perform inspections on the Town’s behalf.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Tusayan or Coconino County directly.

  • Owner-builder exemption — Owner-builders constructing inside Tusayan town limits.
  • Building code adopted — Building-code adoption inside Tusayan town limits.
  • Certificate of occupancy — Certificates of occupancy for buildings inside Tusayan town limits.
  • Minimum dwelling size — Dwelling-unit minimum floor area inside Tusayan town limits.
  • Tiny homes — Tiny-home occupancy inside Tusayan town limits.
9 more unanswered
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Tusayan publishes no rule on the point, not that none exists. Coconino County’s page lists the county offices to call.

← All of Coconino County: county rules, score and offices