White County, Arkansas
Town of Griffithville is a town in White County, Arkansas. Septic permits inside Town of Griffithville come from the state health agency. 5 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the White County page.
Town of Griffithville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite (septic) wastewater systems for homes inside Griffithville town limits, administered by the Arkansas Department of Health through its authorized agent under the statewide ADH rules. Applies inside Griffithville town because no town or county septic program was located.
design flow threshold for ADH review: < 1500 gpd (systems of 1,500 gpd and larger are reviewed by ADEQ)
“authorized agent. the environmental health specialist assigned to the county, or business unit by the department.”
Any new onsite (septic) wastewater system serving a home inside Griffithville town limits; permit issued by ADH or its authorized agent, not by the town.
“until the owner first obtains a valid permit for construction issued by the department or its authorized agent.”
Off-grid sanitation on a premises in Griffithville town. Privies and onsite systems are restricted by ADH rules.
“no privies, onsite wastewater systems or other receptacles for human excreta shall be constructed, maintained, or used on the premises.”
Homes inside Griffithville town limits that are within 300 feet of an available sanitary sewer. Whether the town operates a sewer system was not verified.
distance to available sanitary sewer: <= 300 feet (connection cannot be made without crossing another person's property)
“all premises shall be connected to a sanitary sewer when within 300 feet from the point where the sewer exits a building on the property owner’s property and available to said premises when connection can be made without crossing another person's property.”
ADH plan-review fee for individual onsite (septic) wastewater permits in Griffithville town. No town building-permit fee was found.
structure size threshold: <= 1500 sq ft · plan review fee: 30 USD (larger structures and repairs carry higher or different fees per rule 4.9.1)
“4.9.1.1 for structures one thousand five hundred square feet (1,500 sq. ft.) or less, the fee to review a permit application is thirty dollars ($30.00);”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Griffithville or White County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Griffithville publishes no rule on the point, not that none exists. White County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Griffithville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.