Sharp County, Arkansas
Highland is a city in Sharp County, Arkansas. Highland adopts its own zoning, so inside its limits Highland’s rules apply, not the county’s. Septic permits inside Highland come from the state health agency. 5 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Sharp County page.
New home or business structure construction inside Highland city limits
“requiring a builder or contractor to obtain a permit from the city before commencing construction of a new home or business structure within the city limits of highland, and to display such permit on premises until construction is complete; to provide for penalties for failure to obtain a permit”
Land inside Highland city limits (Sharp County, Arkansas); city zoning ordinance adopted by the city
“copies of the amended zoning regulations above referred to are on file in the office of the city recorder/treasurer and are available for public inspection.”
Real property inside Highland city limits where the city sewer system is available
maximum distance from property to sewer connection: <= 300 feet (city council or designated agency must also find public health will be promoted)
“the city council or the designated agency shall have determined, in its discretion, that the public health will be promoted by the construction of such line or lines.”
Highland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite (septic) wastewater systems on land inside Highland city limits, administered by the Arkansas Department of Health through local health unit environmental health specialists; applies inside Highland city because it is a statewide rule and Highland has no city septic ordinance in the index
“the arkansas department of health’s onsite wastewater program sets statewide policies and provides assistance to environmental health specialists in each of the local health units.”
Onsite wastewater systems under 1500 gallons per day on land inside Highland city limits (statewide ADH rule applies inside the city)
design flow threshold for ADH onsite permit review: < 1500 gallons per day (systems 1500 gpd and larger reviewed by Division of Environmental Quality)
“this program, in cooperation with the local environmental specialists, reviews permit applications for onsite wastewater systems under 1500 gallons per day (gpd). systems 1500 gpd and larger are reviewed by the department of energy and environment’s division of environmental quality”
We looked and could not find an official answer yet. Silence is not permission; ask Highland or Sharp County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Highland publishes no rule on the point, not that none exists. Sharp County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Highland means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.