Sharp County, Arkansas
Cave City is a city in Sharp County, Arkansas. Cave City adopts its own zoning, so inside its limits Cave City’s rules apply, not the county’s. 19 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Sharp County page.
New construction or renovation of a building or structure inside Cave City city limits
“the city will issue a building permit for either the new construction or renovation of a building or structure within the corporate limits of the city of cave city only when the application has been approved by the administrative official as meeting the requirements of these regulations.”
Construction, alteration and repair of buildings inside Cave City city limits
“all fabrication, erection, construction, enlargement, alteration, repairs of buildings or structures shall meet the current arkansas fire prevention code, or other applicable state and city building codes.”
Buildings, structures and land uses inside Cave City city limits
“d. conduct inspections of buildings, structures, and use of land as is necessary to determine compliance with the regulations of this code.”
Land inside Cave City city limits (Cave City, Independence/Sharp counties, AR, ZIP 72521). The city administers its own zoning code; county zoning does not apply inside city limits.
“the commission has developed, and the city council has officially adopted, a comprehensive plan, zoning map, and zoning code for the city of the cave city.”
Land inside Cave City city limits: residential districts R-1, R-2, R-3 and R-MH; commercial and industrial districts; special districts (Zoning Code Articles V-VIII).
“5.01.03 apartment residential (r-3) the r-3 district provides for quiet, medium to high density residential areas characterized by a diversity of housing types.”
R-1 single-family residential district inside Cave City city limits
minimum lot area, single-family: 0.25 acre (R-1 district) · minimum lot width, single-family: 50 ft (R-1 district)
“residential lot, yard & height requirements zoning district minimum lot area minimum lot width setback requirements front side side-street rear max. height feet r-1 single-family: ¼ acre. single-family: 50 ft. 25 ft.* 15 ft. 15 ft.* 25 ft. 48 ft.”
“residential lot, yard & height requirements zoning district minimum lot area minimum lot width setback requirements front side side-street rear max. height feet r-1 single-family: ¼ acre. single-family: 50 ft. 25 ft.* 15 ft. 15 ft.* 25 ft. 48 ft.”
R-1 single-family residential district inside Cave City city limits
front setback: 25 ft (asterisk footnote not captured) · side setback: 15 ft · side-street setback: 15 ft (asterisk footnote not captured) · rear setback: 25 ft
“residential lot, yard & height requirements zoning district minimum lot area minimum lot width setback requirements front side side-street rear max. height feet r-1 single-family: ¼ acre. single-family: 50 ft. 25 ft.* 15 ft. 15 ft.* 25 ft. 48 ft.”
R-1 single-family residential district inside Cave City city limits
maximum building height: <= 48 ft (rooftop and appurtenance exceptions listed in the code)
“residential lot, yard & height requirements zoning district minimum lot area minimum lot width setback requirements front side side-street rear max. height feet r-1 single-family: ¼ acre. single-family: 50 ft. 25 ft.* 15 ft. 15 ft.* 25 ft. 48 ft.”
Occupying a recreational vehicle or camping/travel trailer on land inside Cave City city limits
visitor stay maximum: <= 15 days (visitors to a property) · construction or disaster temporary occupancy maximum: <= 60 days (construction site approval or loss of primary structure; extendable by administrative official)
“b. or temporarily except for visitors to a property who do not remain more than fifteen (15) days, when expressly approved for a construction site, or following the loss of a primary structure to fire, flood, or other incident, for a maximum of sixty (60) days, which can be expanded by the administrative official in extraordinary circumstances.”
Temporary camping with a recreational vehicle or travel trailer inside Cave City city limits
temporary RV occupancy, visitors: <= 15 days (visitors to a property)
“recreational vehicle or travel trailer parks for short-term temporary occupants are only allowed within commercial districts, as permitted.”
Manufactured homes inside Cave City city limits; permitted by right only in the R-MH manufactured home residential district
manufactured home park minimum area: >= 20 acres (R-MH conditional use)
“mobile home x x x x manufactured home x x x p 9.11.0 manufactured home park x x x cu 9.08.0”
““x” city of cave city means that the use is prohibited.”
Accessory dwelling units in R-1, R-2 and R-MH districts inside Cave City city limits
“residential districts r-1 r-2 r-3 r-mh special conditions accessory dwelling unit p p x p 9.02.0”
Manufactured home park spaces inside Cave City city limits (not a general rule for single-family homes)
“e. utilities: each manufactured home space shall be provided with sanitary sewer and water service as required by the codes of the city of cave city.”
Creation of new lots inside Cave City city limits
“no building permit shall be issued for the construction of any building or structure located on a lot or parcel subdivided or sold in violation of the provisions of these regulations, nor shall the municipality have any obligation to issue certificates of occupancy or to extend utility services to any parcel created in violation of these regulations.”
Manufactured home park spaces inside Cave City city limits (R-MH conditional use); no general driveway rule found
minimum driveway width, manufactured home park space: >= 20 ft (manufactured home park only)
“all manufactured home spaces shall abut a hard-surfaced driveway of not less than twenty (20) feet in width, which shall have unobstructed access to a public street.”
Zoning and building permit fees for land inside Cave City city limits
“the city of cave city may impose fees for items covered by the zoning code, according to a schedule adopted by the city council.”
Building permit application process inside Cave City city limits
building permit expiration if construction not started: 6 months (if construction has not commenced) · building permit expiration if construction not completed: 2 years (if construction has not been completed)
“3. building permits: building permits shall expire within six (6) months if construction has not commenced, and within two (2) years if construction has not been completed.”
We looked and could not find an official answer yet. Silence is not permission; ask Cave City or Sharp County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Cave City publishes no rule on the point, not that none exists. Sharp County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Cave City means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.