Bolthole Index

Clay County, Arkansas

Zoning, building permits and septic rules in Greenway, Arkansas

Greenway is a city in Clay County, Arkansas. Septic permits inside Greenway come from the state health agency. 3 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Clay County page.

Answers from the rulebook for Greenway

Rules another office applies inside Greenway

Greenway does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    Onsite wastewater (septic) systems on private land inside Greenway city, Arkansas. The statewide Arkansas Department of Health rule applies inside the city; no Greenway city septic ordinance was located.

    • ADH sets statewide policy and reviews onsite systems under 1,500 gpd. The local health unit acts as ADH's authorized agent for permits and inspections.
    • Systems 1,500 gpd and larger are reviewed by the Arkansas Department of Energy and Environment, Division of Environmental Quality, per the ADH page.
    • Greenway city adoption of its own septic rule was not verified; the Clay County health unit's local role was not confirmed on an official page.

    ADH review threshold for onsite systems: < 1500 gallons per day (systems 1,500 gpd and larger are reviewed by the Division of Environmental Quality)

    “the arkansas department of health’s onsite wastewater program sets statewide policies and provides assistance to environmental health specialists in each of the local health units.”
  • Septic permitRequired

    New construction, alteration, repair or extension of onsite wastewater (septic) systems on private land inside Greenway city, Arkansas, under the statewide ADH rule.

    • The owner must first obtain a valid construction permit issued by ADH or its authorized agent before construction begins.
    • The installer or permit holder must notify the authorized agent at least 24 hours before starting work; emergency repairs may proceed without prior notice if a permit is obtained within ten working days.
    • ADH reviews permit applications for systems under 1,500 gpd; larger systems are reviewed by the Division of Environmental Quality.

    ADH permit review threshold for onsite systems: < 1500 gallons per day (systems 1,500 gpd and larger are reviewed by the Division of Environmental Quality)

    “until the owner first obtains a valid permit for construction issued by the department or its authorized agent”
  • Septic inspectionRequired

    Onsite wastewater (septic) systems on private land inside Greenway city, Arkansas, under the statewide ADH rule, before operation.

    • The system must be inspected and approved by ADH or its authorized agent, and the owner must obtain a permit for operation, before the system is operated.
    • An installation inspection may be made during construction; the installer must notify the authorized agent or designated representative when the installation is ready for inspection.
    • The owner or occupant must give the department, its authorized agent, or designated representative free access at reasonable times for the installation inspection.
    “until such system has been inspected and approved by the department or its authorized agent”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Greenway or Clay County directly.

  • Building permit — Whether a building permit is required for new homes inside Greenway city
  • Owner-builder exemption — Whether owner-builders may build without a contractor inside Greenway city
  • Building code adopted — Whether Greenway city adopts a building code by reference
  • Inspections — Whether building inspections are required for construction inside Greenway city
  • Certificate of occupancy — Whether a certificate of occupancy is required for new homes inside Greenway city
22 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Greenway publishes no rule on the point, not that none exists. Clay County’s page lists the county offices to call.

← All of Clay County: county rules, score and offices