Centerton is a city in Benton County, Arkansas. 6 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Benton County page.
Single-family residences and related outbuildings, multiple-family residences, commercial or manufacturing buildings, and remodeling or repair of such structures inside the incorporated limits of Centerton city, AR
building permit validity period: 180 days (from date of issuance)
“the owner of any land situated within the incorporated limits of the city of centerton shall neither construct nor allow construction or placement, on such land, of any building or structure of a type set forth in sub-paragraphs a through d below, without having obtained a building permit from the city of centerton for such construction.”
Buildings and structures that require a city building permit, inside Centerton city limits
advance notice of inspection: >= 24 hours (in some instances 48 hours during times of increased construction)
“the department of building safety will require a twenty-four (24) hour advance notice of inspection to be made”
Buildings constructed under a city building permit inside Centerton city limits
“5. final: to be done when building is complete prior to occupancy. building is not to be occupied until final inspection is completed and occupancy permit is issued.”
Land inside Centerton city limits that is to receive a building permit for a new structure
“no building permits or associated permits shall be issued for any structures until such time the property upon which the structure is to be constructed shall have first been approved by city of centerton with a final plat recorded at benton county recorder’s office”
Building permit fees for construction inside Centerton city limits
building permit fee, valuation $1,000.01 to $50,000: 50 USD (plus $5.00 for each additional thousand or fraction thereof, to and including $50,000)
“2. $1,000.01 up to $50,000.00 - $50.00 for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.”
Building permit application and issuance process for construction inside Centerton city limits
permit validity period: 180 days (from date of issuance)
“permit applications to be submitted via digital format emailed or on a usb (thumb) drive (no discs).”
We looked and could not find an official answer yet. Silence is not permission; ask Centerton or Benton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Centerton publishes no rule on the point, not that none exists. Benton County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Centerton means bringing your own water and power. The kit we’d start with: