Gassville is a city in Baxter County, Arkansas. Gassville adopts its own zoning, so inside its limits Gassville’s rules apply, not the county’s. Septic permits inside Gassville come from Gassville. 8 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Baxter County page.
All land and structures inside Gassville city limits, Baxter County, Arkansas.
“The regulations apply to all land and structures and are in effect throughout the entire City limits of Gassville.”
Zoning districts inside Gassville city limits.
“The City of Gassville is divided into lhc following Use Zones as i11dic111cd on the Zoning Map which is a parl of these regulations.”
Private wastewater-disposal systems inside Gassville city limits.
“THE APPLICATION FOR SUCH PERMIT SHALL BE MADE ON A FORM FURNISHED BY THE CITY”
Construction of a private wastewater-disposal system inside Gassville city limits.
permit and inspection fee: 35 USD (Paid to the city when the application is filed.)
“BEFORE COMMENCEMENT OF CONSTRUCTION OF A PRIVATE WASTEWATER DISPOSAL SYSTEM THE OWNER (S) SHALL FIRST OBTAIN A WRITTEN PERMIT SIGNED BY THE SUPERINTENDENT.”
Permitted private wastewater-disposal-system installations inside Gassville city limits.
“THE SUPERINTENDENT SHALL BE ALLOWED TO INSPECT THE WORK AT ANY STAGE OF CONSTRUCTION”
Houses, buildings, and properties used for human occupancy, employment, recreation, or other purposes inside Gassville city limits that abut a street, alley, or right-of-way containing a city public sanitary sewer.
public sewer distance: <= 300 feet (Measured from the building; applies where the property abuts the described street, alley, or right-of-way.) · connection deadline: <= 30 days (After official notice to do so.)
“WITHIN THIRTY (30) DAYS AFTER DATE OF OFFICIAL NOTICE TO D0 SO, PROVIDED THAT SAID PUBLIC SEWER IS WITHIN 300 FEET OF THE BUILDING.”
Residential structures, outbuildings, electrical work, and HVAC work inside Gassville city limits.
residential structure fee: per 0.12 USD per square foot (New and renovated residential structures; heated or unheated floor space.) · outbuilding base fee: 30 USD (Plus $0.12 per square foot for areas larger than 120 square feet.) · electrical permit fee: 45 USD (Plus $2 per circuit.) · HVAC fee: per 45 USD per unit
“Residential structures, both new and renovations shall be twelve cents ($.12) per square foot of floor space whether heated or unheated.”
City building-permit application submissions inside Gassville city limits.
“Bring your completed application and applicable fees to 204 S School Street, Gassville, AR 72635.”
We looked and could not find an official answer yet. Silence is not permission; ask Gassville or Baxter County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Gassville publishes no rule on the point, not that none exists. Baxter County’s page lists the county offices to call.