Margaret is a city in St. Clair County, Alabama. Margaret adopts its own zoning, so inside its limits Margaret’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the St. Clair County page.

Answers from the rulebook for Margaret

Margaret’s own rules

  • Building permitRequired

    Building, construction, addition, repair, demolition or excavation projects inside Margaret city

    • Permit is issued only after the building inspector certifies that plans conform to city ordinances, so work may proceed only after the permit issues.
    • Ordinance 07-619 Amended states that fees are collected beginning August 1, 2024.

    permit issuance fee: 20 USD (on all permits)

    “before commencement of any project, work construction, addition, repair, demolition, or excavation, plans for such must be submitted to the building inspector of the city of margaret, alabama”
  • InspectionsRequired

    Permitted building, construction and repair work inside Margaret city

    • Plans must be inspected in detail by the building official before a permit issues (Ordinance 07-619 Amended, Section II).
    • Unnecessary inspection calls where work is not ready cost $100.00; first re-inspection fee $100.00; each additional re-inspection fee $150.00 (Section V.h).

    re-inspection fee (first): 100 USD (each additional re-inspection fee is $150.00)

    “h. inspection fees: no charge shall be assessed on the first request for required inspections.”
  • Local zoningPresent (with conditions)

    Land inside Margaret city limits (St. Clair County, Alabama)

    • The zoning ordinance text itself was not located or opened in this research; presence is shown by the city's own sign ordinance enforcing the zoning ordinance of the city of Margaret.
    “a nonconforming sign is any sign within the jurisdiction of the zoning ordinance of the city of margaret”
  • Minimum dwelling sizeSpecified

    Residential buildings inside Margaret city (no zoning district named in the ordinance)

    • Minimum applies to the main structure exclusive of open porches, attached garages or carports.
    • For two-story dwellings, total living area of at least 1,000 square feet exclusive of open porches, garages and basement applies.
    • The ordinance names no zoning district, so no district-specific minimum is stated.

    main structure area minimum: >= 1000 sq ft (exclusive of open porches, attached garages or carports) · main level living area minimum: >= 800 sq ft (main level; total living area not less than 1,000 sq ft for two-story dwellings)

    “no building shall be erected upon or allowed to occupy any part of the property unless the area of the main structure, exclusive of open porches, attached garages or carports, is not less than 1,000 square feet.”
  • SetbacksSpecified

    Residential buildings inside Margaret city (no zoning district named in the ordinance)

    • Only a front setback is stated in the opened ordinance; side and rear setbacks were not found.
    • Ordinance 07-619 also requires plans to show setback lines on the lot (Section II.c).

    front setback: >= 20 ft (measured from the front boundary of the subject property)

    “no building shall be located less than 20 feet from the front boundary of the subject property.”
  • Permit feesPublished (with conditions)

    Building, construction, septic, demolition and manufactured-home permit fees inside Margaret city

    • Fees established in the ordinance are collected beginning August 1, 2024, per the ordinance's effective-date section.
    • Ordinance 07-619 Amended is the published fee schedule; a later fee amendment was not found in the opened pages.

    new residential construction base permit fee: 425 USD (plus $.50 per sq ft after the first 1,000 sq ft) · septic tank installation/repair fee: 25 USD (per installation, repair, replacement or field line work) · demolition permit fee: 50 USD (requires septic abandonment compliance where applicable) · manufactured or construction trailer placement fee: 125 USD (mobile homes, house trailers or construction trailers moved onto private property or a construction site) · permit issuance fee: 20 USD (on all permits)

    “where the formula cost or appraisal cost, whichever is greater, of new construction and additions 1,000 square feet and over, the permit shall be $425.00 base for each residential unit plus $.50 sq. ft. after the first 1,000.”
  • Permit processPartial

    Building and construction permit process inside Margaret city

    • Ordinance describes plan review and fees but no full application checklist was found.
    • The business page directs permits and inspections to the online government portal or the City Clerk and inspector at 205.629.5501.
    “before approving any plans or issuing a permit for any excavation or construction, the the building official for the city must have inspected such plans in detail and found them in conformity with this ordinance.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Margaret or St. Clair County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside Margaret city
  • Building code adopted — Building codes for construction inside Margaret city
  • Certificate of occupancy — Certificate of occupancy for new homes inside Margaret city
  • Zoning districts — Zoning districts inside Margaret city
  • Minimum lot size — Minimum lot size for single-family residential lots inside Margaret city
15 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Margaret publishes no rule on the point, not that none exists. St. Clair County’s page lists the county offices to call.

← All of St. Clair County: county rules, score and offices