Houston County, Alabama
Ashford is a city in Houston County, Alabama. Ashford adopts its own zoning, so inside its limits Ashford’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Houston County page.
Construction of any house or other building, repair or remodel, moving or demolition of structures, and placing mobile homes or detached buildings within Ashford city corporate limits
“shall be required to secure any applicable building permit(s) from the building inspector/zoning enforcement officer to construct any house or other building”
Construction, repair and alteration inside Ashford city limits
“the international building code ordinance 2022-003, adopted october 3, 2022”
New construction and certain remodeling, alterations, repairs, plumbing and electrical work, and certain detached buildings inside Ashford city
“all new construction and certain remodeling of structures involving alterations, repairs, plumbing and electrical work, as well as certain detached buildings will be subject to inspections”
Commercial buildings in Ashford city (commercial inspection track in Ordinance 2024-005)
“final inspection that must be completed and all fees satisfied prior to the issuance of the certificate of occupancy”
All land inside Ashford city limits; the city's own zoning ordinance administered by its zoning enforcement officer
“hereby ordains and enacts into law an official zoning ordinance in accordance with the laws of alabama”
Zoning districts of Ashford city
“r-1: low-density single family residential district r-2: single residential district r-3: multi-family residential district c-1: central business/local shopping district c-2: special commercial district c-2mu: commercial 2 mixed-use district m-1: wholesale and light industrial district m-2: general industrial district fh: flood hazard district a-c: agricultural-conservation district”
R-1 low-density single-family residential district inside Ashford city (main single-family district), lots on septic tank and well
“r-1 residential single family septic tank & well septic tank 22,500 15,000 100ft 100ft 25% 25%”
R-1 low-density single-family residential district inside Ashford city
“r-1 residential single family septic tank & well septic tank 22,500 15,000 100ft 100ft 25% 25%”
Travel trailer (RV) parks in Ashford city where the district permits them; occupancy on private single lots is not covered by this rule
“the spaces shall be rented by the day or week only. the occupant of such space shall remain in the trailer park for a period of no more than (30) days”
Short-stay camping in travel trailer parks in Ashford city; tent and other temporary camping not reviewed
“the occupant of such space shall remain in the trailer park for a period of no more than (30) days”
Manufactured home parks in Ashford city where the district permits them; single manufactured homes on individual lots (RMH district) not yet verified
“the minimum lot area per park shall be (5) acres and the minimum lot width for portions used for the entrance and exit shall be 50ft”
Private on-site water and sewage disposal in the R-1 district inside Ashford city
“private, on-site water supply and sewage disposal may be permissible in this district depending on specific location”
Dwelling units in the R-1 low-density single-family district inside Ashford city
“however, as public sanitary sewer service becomes available, it shall be required that all dwelling units located within 150ft of a sanitary sewer main be connected to the public system within two years after the service is available”
Building permit fees in Ashford city, residential and commercial
“1. schedule of residential permit fees new construction: permit fees shall be based upon total square footage as follows”
Building permit process in Ashford city
“the city will continue to write the permits and the contractor will call inspector when ready for inspection”
We looked and could not find an official answer yet. Silence is not permission; ask Ashford or Houston County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Ashford publishes no rule on the point, not that none exists. Houston County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Ashford means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.