Geneva County, Alabama
Town of Malvern is a town in Geneva County, Alabama. Town of Malvern adopts its own zoning, so inside its limits Town of Malvern’s rules apply, not the county’s. Septic permits inside Town of Malvern come from the county and state together. 11 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Geneva County page.
Permitted uses and structural alterations inside Malvern town.
“the Building Code adopted and in effect by the Council”
A building erected after the ordinance, a building altered as specified, or a change in occupancy or use inside Malvern town.
“A certificate of Occupancy is required in advance of occupancy or use of:”
Land within the corporate limits of Malvern town.
“to provide for the establishment of districts within the corporate limits of the Town of Malvern, Alabama.”
Land inside Malvern town.
number of districts: 9 districts
“the Town of Malvern, Alabama, is divided into nine (9) districts as follows:”
Dwellings inside Malvern town.
minimum dwelling floor area: >= 1000 square feet
“Dwelling: A building of a least 1,000 square feet designed or used for permanent living quarters”
Buildings and structures inside Malvern town.
maximum height: <= 30 feet
“No building or structure shall hereafter be erected, constructed or altered so as to exceed the height limit of 30 feet”
Zoning-compliance permit applications for uses or structural alterations inside Malvern town.
application copies: 2 copies
“An application shall be accompanied by two (2) copies of a dimensional sketch or a to scale plan”
Town of Malvern does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private onsite sewage disposal systems inside Malvern town.
“The Onsite Wastewater Board regulates private sewage disposal systems. The private onsite disposal system begins at the two-way cleanout.”
Private onsite water supply and sewage disposal in Malvern R-1 and R-2 residential districts.
“Private, on-site water supply and sewage disposal may be permissible in this district depending on specific location.”
Dwelling units in Malvern R-1 or R-2 residential districts within 150 feet of a sanitary-sewer main after service becomes available.
distance to sanitary sewer main: <= 150 feet · connection deadline after service availability: <= 2 years
“all dwelling units located within 150 feet of a sanitary sewer main be connected to the public system within two (2) years”
Any land use in Malvern Flood Hazard (FH) District.
“All land uses permitted within the Flood Hazard District are subject to the approval of the Planning Commission”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Malvern or Geneva County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Malvern publishes no rule on the point, not that none exists. Geneva County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Malvern means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.