Coffee County, Alabama
Town of New Brockton is a town in Coffee County, Alabama. Town of New Brockton adopts its own zoning, so inside its limits Town of New Brockton’s rules apply, not the county’s. Septic permits inside Town of New Brockton come from Coffee County (Coffee County Health Department, Environmental Services · 334-347-9574). 9 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Coffee County page.
Structural alterations and permitted uses inside New Brockton town.
“building code adopted and in effect by the council”
Land within the corporate limits of New Brockton town.
“hereby ordains and enacts into law an official zoning ordinance”
New Brockton town corporate limits.
“the Town of New Brockton, Alabama, is divided into ten districts”
Principal uses and additional dwellings inside New Brockton town.
principal-use public-street right-of-way: >= 30 feet · additional-dwelling access passageway width: >= 15 feet (must be open to the sky)
“Any additional dwelling shall have access to a public street”
Zoning-compliance permit applications for uses or structural alterations inside New Brockton town.
application plan copies: 2 copies (zoning-compliance permit application)
“An application for a zoning compliance permit shall be accompanied by two copies”
Town of New Brockton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Travel trailers in permitted travel-trailer parks inside New Brockton town.
maximum same-park occupancy: <= 30 days (travel-trailer-park space)
“shall remain in the same trailer park for a period of not more than 30 days.”
Travel-trailer-park site plans inside New Brockton town.
“a certificate of approval from the Coffee County health department”
Onsite sewage disposal systems in New Brockton's Flood Hazard District.
“On-site sewage disposal systems (septic tanks).”
C-1 retail, C-2 heavy-commercial, and IND industrial properties inside New Brockton town.
connection deadline after service availability: 90 days (C-1, C-2, and IND district provisions)
“Public water and sewer shall be required within 90 days after the service is available.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of New Brockton or Coffee County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of New Brockton publishes no rule on the point, not that none exists. Coffee County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of New Brockton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.